• Title/Summary/Keyword: Scaffolding Structure

Search Result 46, Processing Time 0.024 seconds

A Study on the Analysis of Current Situation and the Deduction of Improvement Measure Regarding the Scaffolding and the Related Components at Construction Site (건설 현장 가설기자재 운영현황 분석 및 개선 방안 도출 연구)

  • Jeong, Jin Woo;Kim, Yong Gon
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.5
    • /
    • pp.63-71
    • /
    • 2019
  • Work Guideline of Construction Quality Management was revised in July 2017, and it has changed the perception of scaffolding in South Korea. The on site investigation and survey was performed on manufacturers, leasing companies, and quality inspection agencies regarding the compliance with the guideline for the scaffolding and the related components brought to the site. Moreover, the related guidelines and identified unsatisfactory quality management items were analyzed by each subject. As a result, the major factors that cause the problems were reasonably deducted. The related regulations to prohibit the delivery of faulty scaffolding components to the construction site in order to secure the safety of the temporary structure was suggested.

Development of the Automatic Design Program for Scaffolding System of the Membrane LNG Carrier (멤브레인 LNG 운반선용 스카폴딩 시스템의 자동 설계 프로그램 개발)

  • Lee, Hee-Tae;Shin, Sang-Beom;Park, Yun-Ki
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.47 no.2
    • /
    • pp.233-241
    • /
    • 2010
  • Scaffolding system in the membrane LNG carrier is a steel structure composed of various pipe-shaped members connected by specific coupling devices. In this study, the automatic design program for scaffolding system in membrane LNG carrier has been developed. It enables user to arrange members easily considering design constraints and input variables such as size of tank, position of legs, level height and so on. In addition to that, it creates finite element analysis model with loading and boundary conditions automatically and carries out structural analysis. With post processor based a state-of-the-art computer graphics, users can easily check the results of structural analysis and make a report for structural safety of scaffolding system.

Steel Frame Clamp Deformation and Performance Check based on Clamping Orientation (철골용 클램프 시공방향에 따른 변형 및 성능확인)

  • Mo, Seung-Un;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.161-169
    • /
    • 2022
  • The government [3] specifies steel pipe scaffolding as conventional scaffolding and is promoting the installation of system scaffolding, an integrated work platform, and avoidance of the use of steel pipe scaffolding as much as possible. However, in places where equipment cannot enter, such as power plants and plant sites, places the structure is complex, and places where scaffolding cannot be stacked on the ground, there is no choice but to install steel pipe scaffolding. When installing steel pipe scaffolding on an H-beam structure at a high place, the performance of the steel frame clamp is very important in order to form a work space which workers can work safely. In this study, the displacement magnitude and tensile load of members in each installation direction of the clamp for steel frame were verified through performance tests and structural analysis modeling. As a result, it was confirmed that the performance for each installation direction satisfies the safety certification standard tensile load of 10,000N. Although the performance value is satisfactory, deformation of the attachment pressing bolt was verified and was confirmed to have minimal deformation. Thus, to ensure the load is properly to the attachment body, the clamp for a steel frame must be installed in the direction in which the load is transmitted.

A Comparative Study of the Productivity through the Cost of the Precast Span Method(PSM) and Movable Scaffolding System(MSS) -By the Central Example of Company H on the Korea Train Express (KTX) (공사비 비교를 통한 Precast Span Method(PSM) 공법과 Movable Scaffolding System(MSS) 공법의 생산성 연구 -경부고속철도 H사의 사례를 중심으로)

  • Lee Tai Sik;Lee Sung Hyun;Kim Gil Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.535-540
    • /
    • 2001
  • In the early construction phase of the Korea Train Express (KTX), the Movable Scaffolding System (MSS) for the top structure of the bridge was the predominant construction method. But the method had to be changed due to arising problems and an alternative method had to be found. Company H that participated in Korea Train Express construction project achieved excellent results of performance through the introduction of the Precast Span Method (PSM), which has been previously successfully employed in foreign express train projects. This study intends to verify the superior performance of PSM over MSS in the KTX construction process by conducting a comparative analysis on PMS and MSS based on the field experience of company H. This study will not only help to understand PSM, which is expected to expand its future scope of application, but also contribute to solve the problems of PSM that occurred during the construction phase.

  • PDF

A Methodology of the Static Analysis for Scaffolding Structure (가설공사 비계의 정적구조 해석에 관한 연구)

  • 손기상
    • Journal of the Korean Society of Safety
    • /
    • v.8 no.2
    • /
    • pp.16-22
    • /
    • 1993
  • Accidents, especially fatal accidents in construction work are being not reduced, but increased, despite of more concerns of related authority and companies themselves. It is investigated that major reasons of which these accident increase are caused to set up wrong temporary structures : scaffolding with insufficient components or safety guards. Approximately 50% of falling accident, one of three major accidents; falling collapsing of structures or soil, accidents from heavy equipments, are due to defects of temporary structures. Therefore, technical standards for these temporary structures made by the ministry of labour in 1984, should be promptly revised because of its insufficient considerations for structural concepts. A method to effectively ensure the construction safety are shown through an experimental method, mathematical analysis structural planning against overturning and collapsing of scaffold-ing components, consideration of safety factor in loading, formulations of safety structure against falling or dropping from schaffolding.

  • PDF

Automatic design, planning and drawing of scaffolding system for constructions

  • Hara, Takashi;Shimomura, Katsukiyo;Hamano, Keita;Miyake, Shoko
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.179-196
    • /
    • 2019
  • Temporary scaffold systems in the construction site play an important role for ensuring the safety of the workers and for constructing the stable structures. To assemble the scaffold, the pipe scaffolding system, the wedge binding scaffolding system and the particular materials have been utilized. To design the material arrangement of a scaffold, firstly the configuration was determined considering the construction geometry. Then, the strength of the scaffold was confirmed and the quantity of the material was accounted. In this paper, the design method of the temporary scaffold was proposed for intending the semi-automatic procedure. In the proposed design method, the geometric design and the safety requirement were specified by the safety standard and the design flow was followed by the designer's knowledge. The size and the quantities of the materials were calculated by referring to the relation between the scaffold and the constructing structure. In the calculating procedure, three dimensional positions of each scaffold materials were calculated and recorded simultaneously. Then, three dimensional scaffold structural was drawn semi-automatically on the CAD software by using the obtained material sizes, positions and directions. The proposed design method provides us the precise quantities of scaffold materials and enables us to reduce the design effort and the cost estimation processes. In addition, the obtained results can be applied to BIM software after converting to IFC format.

A Study on 8-Stage Loading Method of the Scaffolding Module for LNG Carriers (LNG 운반선 비계 모듈의 8단 탑재 방안 연구)

  • Shin, Sang-Hoon;Ko, Dae-Eun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.78-85
    • /
    • 2020
  • The scaffolding system, which is a construction workbench of the cargo containment for a membrane LNG carrier, is a large truss structure composed of various members. To shorten the installation period and process of the scaffolding system, it is effective to enlarge the mounting unit from the existing two stages to eight stages. Owing to the increase in lifting load according to the large size of the module, the stresses around the pin and hole will be increased significantly. In this study, a tensile strength test and contact stress analysis were performed to confirm the structural safety. The relatively large hole deformation was observed visually near the average load generated in the vertical pipe at the top through tensile strength tests. A contact stress calculation confirmed the stress distribution around the hole. The contact problem was dealt with in terms of the Herzian contact stress. The possibility of 8-stage loading was examined by comparing the yield strength and contact stresses of failure critical locations. As a result, the 8-stage loading method of the existing scaffolding material was inadequate, and a new loading method with proper safety is proposed.

Automated Safety Planning of Scaffolding-Related Hazards in Building Information Modeling (BIM)

  • Kim, Kyungki;Cho, Yong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.255-258
    • /
    • 2015
  • Scaffolds are frequently used in construction projects. Despite the impact on the entire safety, scaffolds are rarely analyzed as part of the safety planning. While recent advances in BIM (Building Information Modeling) provides opportunity to address potential safety issues in the early planning stages, it is still labor-intensive and challenging to incorporate scaffolds into current manual jobsite safety analysis which is time-consuming and error-prone. Consequently, potential safety hazards related to scaffolds are identified and presented during the construction phase. The objective of this research is to integrate scaffolds into automated safety analysis using BIM. A safety checking system was created to simulate the movements of scaffolds along the paths of crews using the scaffolds. Algorithms in the system automatically identify safety hazards related to activities working on scaffolds. Then, the system was implemented in a commercially available BIM software program for case studies. The results show that the algorithms successfully identified safety hazards that were not noticed by project managers of the projects. The results were visualized in BIM to facilitate early safety communications.

  • PDF

Establishing the Structural Criteria to install Scaffolding-Use Brackets (비계지지브라켓 유형별 구조기준 설정에 관한 실험적 연구)

  • Son, Ki-Sang;Kal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.10 no.4
    • /
    • pp.87-96
    • /
    • 1995
  • It is only three(3) years since we applied brackets for scaffolding in the construction area. Unfortunately, there is no structural criteria on how to install those in the site so far, despite the fact that those brackets have been applied into the site by the firms already. It is shown that resistant capacity of each bracket type has been investigated, analyzed from this experimental study. Accident-concerning data on construction site analyzed by the Ministry of Labor, show temporary structure involves 18.6% of the total industrial accident, which the accidents from scafold-supporting brackets have rate of 42.5% of the ones occurred from the temporary structures. There are two main aspects to be observed : one is how much resistant capacity the brackets have themselves, the other is how exactly to install those without eccentricity. But practically, nobody does check of this bolt-installing conditions in the site and no check of tightening level of nut because there is no available tool to check torque amount for this kind of nut. We just have to rely on scaffolders experience of this tightening. This experiment involves just this variable of tightness at site. Eventually this insufficient tightness causes to collapse those scaffolding structures. The bracket might have less the one than its original capacity due to this insufficient tightness. Three(3) times of PIVOT tests show that fractured condition of two(2) row brackets has occurred mostly at lower bolt due to shear force. Therefore, tightness of bracket-installing bolt, tensile strength of the bolt, shear strength of the bolt, loading condition with equal two point or inequal two point loads, are mainly investigated as variables in this study.

  • PDF

An Experimental Study on the Behavior of Scaffolding System without a Part of Column (부분 무기둥 비계구조 골조 거동에 관한 실험적 연구)

  • Son, Ki-Sang;Jong, Jung Hee
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.4
    • /
    • pp.66-71
    • /
    • 2013
  • There is a critically structural problem of scaffolding system when one of scaffold columns is remove to be used as a gangway for their temporary office in the structure before finishing all such as an apartment or office building. This is not used to checking to structurally checking at a construction site. This study is to find out which system at a site will be more effective and low-cost-high effectiveness of aluminum ladder, timber ladder, ${\phi}$1/2 inch steel pipe truss with a type of concave, convex warren truss ladders. Theses are structurally tested with horizontal set as a truss type with 1.8 meter long. Concentrated load has been loaded at the upper center of the system and checked its strain at the bottom center, using aluminum-use strain gage and steel-use gauge have been attached concave warren truss with diameter 1/2 inch has 14% stronger than convex truss. Convex truss has almost same strength as an aluminum ladder truss, it is found out.