• Title/Summary/Keyword: Saving construction expenses

Search Result 10, Processing Time 0.023 seconds

Program development for composition of construction safety management expenses (건설안전관리비 산정 프로그램 개발)

  • Hong, Sung-Man;Lee, Jung-Gi;Park, Peom
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.2
    • /
    • pp.23-32
    • /
    • 2002
  • The small-and-medium sized construction sites are in weak state of safety management because of the variable working environments, the lack of safety techniques and the weak economic conditions, and industrial accidents of these sites were occupied 60% of the total construction accidents. Recently, the safety engineer's number are not to be enough at the small-and-medium sized construction sites. Therefore, the safety engineer's works are addition to more and more. This paper is a development of the integrated program which using composition of construction safety management expenses. It is an management tool which helps to saving time of construction safety engineer. A method of development composition, to used Brain Storming for a place of meeting to construction safety management counselors.

Building Process of Domestic Residential Container Architecture and Suggestions for Vitalization (국내 거주용 컨테이너 건축물의 구축현황과 활성화 방안)

  • Gil, Bit-Na;Kim, Mi-Kyung
    • Korean Institute of Interior Design Journal
    • /
    • v.25 no.6
    • /
    • pp.79-88
    • /
    • 2016
  • The purpose of this study was to suggest ways to vitalize residential container architecture by identifying the building process of domestic residential container architecture and analyzing various problems appeared in the process and status of construction related to planning, design, and construction. Conclusion and suggestions of this study are as follows.; firstly, according to the current situation of domestic residential container architecture, the usage was planned mainly for accommodation. Secondly, For planning background of planning preparation stage, economic benefit for long-term residence individuality and diversity for long short term complex residence were the primary planning backgrounds. Thirdly, for floor planning of planning design stage, space planning for various purposes is necessary as creating inter-space, wide LDK space, and loft by using narrow and long container for the long-term residence. Lastly, For construction stage, ways to reduce personnel expenses are being required by reducing the term of works and simplifying the processing stage by running factory production and field construction in parallel. If reduction method of construction cost through energy saving and mass production system is considered in the future, it would be possible to expand the development to dormitory and community housing for university students who are pressured by housing cost.

Evaluation of Environmental Economics on Dismantling Projects Using LCI DB (LCI DB를 활용한 해체공사 환경경제성 평가)

  • Kwon, Suk-Hyun;Kim, Kyong-Ju;Kim, Byung-Soo;Kim, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.233-238
    • /
    • 2008
  • Korea has a high volume of exhaust in environmental pollutants compared to her economic size, which results from the increase of the ratio in high energy consuming industries. There arises an issue that efficient energy saving is not achieved in the related projects of the construction, which is one of the high energy consuming industries. In addition, such projects of dismantling old and decrepit buildings are frequent in recent years. Given the situation, to obtain much better effects of energy saving, it is necessary to build basic databases and develop utilization plans on energy consumption volume, exhaust volume of pollutants, and environmental expenses that come from the dismantlement stages out of the life cycle of construction projects. Therefore, this study calculates the exhaust volume of environmental pollutants, converts it into environmental expenses by pollutants, and evaluates the environmental economics on the projects of dismantling buildings, utilizing LCI DB that is suggested by Ministry of Knowledge Economy and Ministry of Environment. For this purpose, related data research, the existing literature study, and on-the-spot field investigation were conducted. Based on the results of analysis on the collected data, the environmental economics of the target building was evaluated.

  • PDF

A Review on the Reconstruction of Jeonju Eupsung during the early years of King Young-Joe (영조초년(英祖初年)의 전주읍성(全州邑城) 개축공사(改築工事)에 관한 재고찰(再考察))

  • Seo, Chi-Sang;Cho, Hyung-Rai
    • Journal of architectural history
    • /
    • v.16 no.6
    • /
    • pp.27-46
    • /
    • 2007
  • Through reinvestigations of early years of King Young-Joe provincial castles, Jeonju Eupsung, this study seeks to broaden the understanding of castle construction of the later period of Chosun Dynasty. Jeonju Eupsung was established by reform-minded king and his loyalist Cho, Hyun Myung. Their new conceptual framework for reconstruction of Jeonju Eupsung was affected by Yoo, Hyung Won, a realist scholar of 17th century. It is obvious that adopted new administrative systems of financing, building and maintaining of Jeonju Eupsung were based on the his theories of castle. This study demonstrates that Jeonju Eupsung built by Cho, Hyun Myung, during the early years of King Young-Joe were based on those new concepts and systems of the new age. The study shows that the designer of this castle had in mind efficient construction design and execution and effective defense of provincial towns located on flat ground. And, the study explains how those original designer sought higher productivity through greater localization of securing resources and more detailed and improved organization of construction responsibilities. In short, this study seeks to prove that the provincial castles of the early 18th century reflected the new thinking on practicality that was spreading throughout the society of Chosun Dynasty at the time.

  • PDF

Application Effect Analysis of The Modular Construction Method in The Extension Works (저층 교육시설 증축공사에서 모듈러 공법의 적용효과 분석)

  • Kim, Hakcheol;Shin, Dongwoo;Cha, Heesung;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.101-111
    • /
    • 2015
  • The modular construction method has been getting more attention followed by global eco-friendly trend as the domestic construction industry has focused more on remodeling and extension work. The modular construction method is an industrialized construction system which is not likely as the existing construction method it manufactures more than 70% modules at the factory then assembling can be completed in a short amount of time on site. The modular construction method has various strengths; shortening of construction period by on-site work decrease, weight pressure reduction by usage of light steel frames and cost saving by repetitive manufacturing. However, it is currently not expanded due to the existing commercialized construction method. Therefore, this research is in order to help the related authorities make decisions to select the construction method and motivate expansion of modular construction method which can be utilized effectively in the extension works. The intention of this research is to stress differentiation from other construction methods in construction period, construction expenses, labor and forces by comparing and analyzing actual cases, to inform competitiveness of modular construction method by concrete effect analysis and to support adoption of the modular construction method into the domestic industry.

Cooling and Heating Energy Performance and Cost Analysis of Vertical Closed-loop Geothermal Heat Pump Coupled with Heat Storage Tank Compared to Conventional HVAC System (일반공조 시스템 대비 축열조와 연동된 수직밀폐형 지열히트펌프의 냉난방 에너지 성능 및 경제성 분석)

  • Kim, Min-Ji;Do, Sung-Lok;Choi, Jong-Min;Lee, Kwang Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.11
    • /
    • pp.81-87
    • /
    • 2018
  • Among various types of geothermal heat pump systems, Vertical Closed-Loop Geothermal Heat Pump (VGSHP) has received increasing attention due to a variety of advantages such as the potential to be installed in a relatively small space and improved energy efficiency. In this research, the performance of VGSHP system coupled with heat storage tank was evaluated, by analyzing operational behavior of heat storage tank, the variations of heat pump energy performance due to the connection with heat storage tank, part load ratios characteristics of heat pump and the corresponding energy cost, compared to chiller and boiler based conventional system. The results of this study showed that the VGSHP system coupled with heat storage tank showed an energy saving effect of about 18% for cooling and about 73% for heating, and annual heating/cooling energy cost reduction of 43,000,000 KRW ($ 39,000), compared to the conventional air conditioning system. In addition, after considering both energy cost and initial investment cost including equipment, installation and auxiliary device expenses, payback period of approximately 11.8 years was required.

A Study on the Practical Use of the Inn0er Part of a Roof of the New Hanok with a Structural Modification (지붕가구법의 변용을 통한 신한옥 보꾹공간의 활용에 대한 연구)

  • Kim, Hark-Rae
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.14 no.2
    • /
    • pp.1-10
    • /
    • 2012
  • The purpose of this study is to provide the method of saving the construction cost per unit area of the New Hanok using the inner space of a roof as a floor space with a structural modification of it's roof. The proportion of a roof of the Traditional Hanok accounts for about a half of it's elevation, so it is an essential element of it. But, compare to the whole construction cost of the Traditional Hanok, it costs over a half of expenses to build it. Recently, at the traditional building type, it is found that the inner space of a roof of it is used as a floor space with a structural modification of it's roof. It can be divided into two types, the storage type and the living type. The New Hanok at downtown can accommodate various new lifestyle, so the length of it's Yangtong is longer than that of the Traditional Hanok. When we adjust the proportion of the traditional Hanok to the New Hanok, the height of the column and the roof of the New Hanok becomes also higher than those of the traditional Hanok. So, using the upper part of the column and the roof of the New Hanok, we can make the inner space of a roof of the New Hanok as a floor space -like a bed room, tea room, personal work space and a storage- vertically connect with the 1st floor as the main living area. As a result, it is expected to save the unit construction cost of the New Hanok and has an extensity of space when we build the New Hanok at downtown.

An Analysis of Cost Reduction Potentials for Modular Housing from the Long-term Perspective (장기적 관점에서의 모듈러 주택 공사비 절감기회 분석)

  • Kim, Hu Yong;Ryu, Kuk Mu;Kim, Kyoon Tai;Jun, Young Hun;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.124-134
    • /
    • 2018
  • Despite the many advantages of modular housing, low preference for modular housing for consumers who are familiar with RC structure leads to high construction cost of modular housing. The cost of modular buildings is about 130% of that of RC structures, so it is urgent to secure economical efficiency of modular buildings. Therefore, in this study, after calculating the savings amount of modular housing by type of construction work, economic analysis was conducted from a long - term perspective. In order to carry out the research, the authors compiled and analyzed the material cost, labor cost, and expenses incurred by each type of work by reclassifying the statement of the modular housing into the factory production and the site installation. After that, Pareto diagrams were created to find a core work that is included in the cost ratio of about 80%, and selected it as a cost reduction subject. Based on the assumption that the market size of domestic modular housing is similar to the level of modular advanced countries such as Japan and European countries, six cost reduction methods were set up that reflects the characteristics of the modular construction method and used for the expert interviews. Cost saving potentials in percentage from the interview were converted to the amount of savings that can be achieved by each type of method when applying the method. Finally, the findings of the study are expected to suggest long-term directions for technical development for modular construction and cost savings.

A Study on the Earthwork Volume Computation and Topographic Analysis using DTM Interpolations (DTM 보간기법별 토공량 산정과 지형분석에 관한 연구)

  • Park, Woon-Yong;Kim, Chun-Young;Lee, Hyun-Woo
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.9 no.1 s.17
    • /
    • pp.39-47
    • /
    • 2001
  • DTM(Digital Terrain Model) can play a key rule in a great number of the fields of construction Engineering. One of the most important application fields is to determine volume in that the total construction expenses is usually calculated through this. It therefore is necessary to the study on improving the precise of the determination using DTM on account of saving time and cost. On this study, 1:5000 topographic maps issued by NGI in 15 districts involved in Pusan city was digitalized to generate DTM at first. After this step, not only was the determination of the volume as well as readjusted area and height done for the sake of estimating the changable topography caused by cut & fill volume in future but also provided the model to calculate it as results. In addition, comparison among the interpolations, such as Inverse Distance Method and Nearest Neighbor, was respectively done to look over the differences of the volume estimated from each interpolation and also to find the most suitable method. As a result, the former yielded the largest values of area and the volume while the latter gave the smallest ones. Moreover, the values estimated on this study were closely similar to ones obtained by the government of Pusan.

  • PDF

Economical Feasibility of the Treatment Methods of the Dredged Sediments from Contaminated Agricultural Reservoirs (농업용 저수지 준설토의 처리 공법에 따른 경제성 분석)

  • Oh, Kyoung-Hee;Cho, Young-Cheol
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.10
    • /
    • pp.756-762
    • /
    • 2013
  • The economical feasibility was conducted to find the adequate method to treat the dredged sediments from agricultural reservoirs in a pilot project that had been operated to improve the quality of water and benthic environments by dredging of contaminated sediments. For benefit/cost (B/C) analysis, the net expenses were considered as the costs of project, and the benefits were calculated from the saving of waste-treatment cost through reuse of dredged sediment, the saving of construction cost of settling pond, and the values of retained water by dredging. Although the economic feasibility depended on the sites of operation, the average B/C value of the pilot project was estimated as 1.32, indicating this project is economically feasible. Depending on the treatment methods, the B/C values were in the order of the methods of coagulating sedimentation, machinery dewatering, stabilization through exothermic reaction, and soil improvement and stabilization. The machinery dewatering method is estimated as the most adequate one to treat the dredged sediments because of the minimum riskiness of secondary pollution, the recyclability, and its economic feasibility.