• 제목/요약/키워드: Safety manager

검색결과 447건 처리시간 0.031초

Survey of Perception about Security Works (경비업무에 대한 경비요원 인식 조사)

  • Park, Jeong-Hun;Jung, Joo-Sub
    • Korean Security Journal
    • /
    • 제17호
    • /
    • pp.143-155
    • /
    • 2008
  • Purpose of this study is to analyze actual perception of security business of security workers centering on employees working within building and to improve accomplishment of works for security workers. For this, first, activities of security workers are discussed. Second, perception of employees of companies for the necessity of security workers, non-necessity of security workers, qualification requirements of security workers for improving business recognition were established as a framework of the study. Changes for recognition of security works in modern life are a little falling behind compared to unstopping economic development and diversifying job classifications. Even at present, expression of security works is still regarded as manager of facilities or apartments in the past. In other words, it is recognized as a simple change of title and names from apartment guard to security workers. Security works in the modern job classification is settling down as a professional field of facility management and as a part of various controls such as protection and security and its field is also expanding. It is a professional job with the purpose to analyze and prevent diverse criminal actions occurring in the society and also to introduce alternative measures with the role to prevent accidents to be occurred in variety in advance instead of simple working format taking a fixed guard post. Area of security works for the purpose of maximizing necessity of security works shall have equipped with deployment of professional security workers, consideration of business satisfaction of security workers, prevention education for rapidly changing safety accidents, and substantiality in the field. We expect to have more sophisticated area of security works with ceaseless efforts and with instillation of recognition of professionalism by security workers themselves.

  • PDF

4D BIM based Workspace Planning Process in Building Construction Project (4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스)

  • Choi, Byungjoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Hyunsoo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • 제14권5호
    • /
    • pp.175-187
    • /
    • 2013
  • Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.

A Field Survey on Facility Management and Anglers' Requirements at Recreational Sea-fishing Parks (바다낚시공원 시설운영 및 낚시인 요구사항 조사 연구)

  • Kang, Young-Hun;Hong, Sung-Ki;Lee, Han-Seok
    • Journal of Navigation and Port Research
    • /
    • 제39권6호
    • /
    • pp.529-538
    • /
    • 2015
  • This paper was intended to empirically identify problems with recreational sea fishing park facilities installed to help reinvigorate local economy of fishing villages in order to mitigate shortage of fishing facilities amid an increase in sea fishers and spur evolution of sea fishing into a marine leisure activity, on which basis this researcher presented direction for facility planning which is deemed necessary to map out the plan for sea fishing parks, along with measures designed to improve sea fishing park facilities. To analyze the problems related to sea fishing park facilities, we conducted a survey on facility operations involving 9 sea fishing parks and 2 sea ranches and had an investigative interview with facility manager. Moreover, a survey was conducted of fishers in 25 sea fishing places, including sea fishing park, fishing experience village, etc., in order to investigate their demand for facilities. The results of survey suggested that there was a significant demand for expansion of amenities such as safety facilities, toilets, lounge facilities, etc., which can accommodate the increase in the number of people fishing with family. Furthermore, the results showed that there was a huge demand for introduction of facilities aiding leisure activities in addition to facilities for fishing activities including education facilities such as fishing site at the corner exclusive for beginners, experiential facilities, camping site, seaside park, promenade, etc. Thus, sea fishing park should be the complex leisure space with a focus on fishing activities and requires facility configuration and facility planning suited to activity requirements within fishing park.

Systematic Review on Presbycusis Treated by Herbal Medicine Focusing on Kidney Deficiency (노인성 난청의 한약 치료에 대한 체계적 문헌고찰: 신허(腎虛)을 중점으로)

  • Lim, Hui-yeong;Jin, Han-Sol;Ko, Woo-Shin;Yoon, Hwa-Jung
    • The Journal of Korean Medicine Ophthalmology and Otolaryngology and Dermatology
    • /
    • 제34권4호
    • /
    • pp.49-70
    • /
    • 2021
  • Objectives : This study was conducted to approve the effectiveness and safety of herbal medicine on presbycusis with kidney deficiency. Methods : We searched randomized controlled trials(RCTs) on presbycusis patients diagnosed with kidney deficiency through 10 electronic databases from the start to Sep 7, 2021. Study collection and data extraction, and evaluation of risk of bias were conducted by two independent collaborator. The evaluation of the risk of bias in included RCTs was carried out by using Cochrane risk-of-bias tool. And the data synthesis was conducted by using Review Manager(RevMan, ver.5.4). Results : 1. The treatment group which used herbal medicine(HM) alone was more effective than the control group which used only western medicine(WM) on effective rate of hearing loss. 2. In 3 studies comparing the HM-WM combination treatment group with the control groups using the same WM treatment, the effective rate was statistically significantly higher in the HM-WM combination treatment group. 3. Of the 5 studies that reported adverse reactions, one study reported mild nausea and dizziness, but the difference between the HM treatment group and the WM control group was not statistically significant, and no side effects occurred in other 3 studies. 4. In studies comparing HM and WM, the HM treatment group improved hearing loss, whole blood viscosity, serum TNF-𝛼, IL-1𝛽, IL-6, and oxidative stress indicators better than the WM control group, and there was no significant difference. 5. In studies comparing the HM-WM treatment group with the WM control group, the severity of tinnitus, quality of life, and feelings of anxiety and depression were better in the treatment group than the control group. Conclusions : This study shows that the herbal medicine can improve symptoms of presbycusis with kidney deficiency.

Possibility of Risk Accidents and Response Strategies for Participants in Agencies in Charge of Employment for the Elderly: Focusing on occupational risk accidents and COVID-19 risk accidents (노인일자리 전담기관 참여자의 위험사고 발생가능성과 대응 전략: 업무상 위험사고와 코로나-19 위험사고를 중심으로)

  • Park, Jae-Young;Youn, Ki-Hyok;Lee, Jin-Yeol
    • Journal of Internet of Things and Convergence
    • /
    • 제8권6호
    • /
    • pp.65-73
    • /
    • 2022
  • This study identified the level of awareness of dangerous accidents by empirically analyzing the possibility of hazardous accidents at work and the possibility of dangerous accidents due to COVID-19 targeting the participating seniors who are active in the Senior Club, an organization dedicated to job placement for the elderly. The purpose of this study is to provide basic data for preparing measures to improve risk accidents that may occur in organizations in charge of job placement for the elderly and to suggest countermeasures to prevent dangerous accidents. For this purpose, data were collected from the elderly participating in 16 senior clubs in Busan, and 425 of the collected 430 were ultimately used. As a result of this study, first, it was found that the elderly who participated in a job-dedicated institution for the elderly generally perceived the possibility of occupational risk accidents and risk factors due to COVID-19 to be low. Second, it was found that there was a statistically significant difference in the probability of occurrence of hazardous accidents at work according to demographic characteristics during the participation period, and the probability of occurrence of dangerous accidents with COVID-19 was found to have statistically significant differences in the classification and age of the participating elderly. Based on the results of this study, the project manager suggested creating a safety accident management record sheet, preparing a risk management manual, and establishing a risk management system reflecting the individual characteristics of the participants.

A Planning Framework of BIM-based Work-Type Packaging for Educational Facility Maintenance (교육시설 유지관리 BIM 기반 공종 패키지 플래닝 프레임워크)

  • Bae, Chang-Joon;Park, Sang-Hun;Yoon, Sun-Jae;Lee, Mi-Young;Koo, Kyo-jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제21권12호
    • /
    • pp.200-210
    • /
    • 2020
  • The maintenance of educational facilities was assembled in 12 project classifications of the Educational Improvement Program. The priorities were decided by the evaluation scores derived from the condition investigation, and maintenance works were budgeted in the order of priorities. These priorities were a schedule for conducting maintenance and an important criterion for obtaining a construction order. Several restrictions in the condition investigation exist, which derives budgets and conducts maintenance separately based on the priorities. An educational facility manager has a restriction in quantity take-off, which results in an incorrect budget. Discomfort would occur in an educational environment, and a period of infringing safety would increase. This study proposes applying a BIM in the condition investigation and the planning framework for work-type packaging. A BIM supports a budget calculation and derives evaluation scores by linking a repair and an inspection result. The work-type packaging algorithm divides a budget allocation range and derives the result of a grouped work-types applied in an equivalent space and element. As a result of applying cases, it could shorten the duration by approximately 37.4%. Its usability in selecting a grouped work-type was evaluated through an assessment with workers.

Evaluating the Efficiency of Personal Information Protection Activities in a Private Company: Using Stochastic Frontier Analysis (개인정보처리자의 개인정보보호 활동 효율성 분석: 확률변경분석을 활용하여)

  • Jang, Chul-Ho;Cha, Yun-Ho;Yang, Hyo-Jin
    • Informatization Policy
    • /
    • 제28권4호
    • /
    • pp.76-92
    • /
    • 2021
  • The value of personal information is increasing with the digital transformation of the 4th Industrial Revolution. The purpose of this study is to analyze the efficiency of personal information protection efforts of 2,000 private companies. It uses a stochastic frontier approach (SFA), a parametric estimation method that measures the absolute efficiency of protective activities. In particular, the personal information activity index is used as an output variable for efficiency analysis, with the personal information protection budget and number of personnel utilized as input variables. As a result of the analysis, efficiency is found to range from a minimum of 0.466 to a maximum of 0.949, and overall average efficiency is 0.818 (81.8%). The main causes of inefficiency include non-fulfillment of personal information management measures, lack of system for promoting personal information protection education, and non-fulfillment of obligations related to CCTV. Policy support is needed to implement safety measures and perform personal information encryption, especially customized support for small and medium-sized enterprises.

Development of Quality Evaluation and Management System for Assembled Temporary Equipment - Focused on Steel Pipe Scaffolding, System Scaffolding and Support - (조립 가설기자재 품질평가 및 관리 시스템 개발 - 강관 비계, 시스템 비계, 시스템 동바리를 중심으로 -)

  • Jang, Ji young;Lee, Ji yeon;Kim, Ha yoon;Lee, Jun ho;Kim, Jun-Sang;Kim, Jung-Yeol;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • 제23권5호
    • /
    • pp.43-55
    • /
    • 2022
  • Since assembled temporary equipment is widely used for construction work that should be carried out before this construction begins, it is essential to secure quality during assembly and prevent safety accidents caused by assembled temporary equipment after installation. However, it was investigated that most construction site managers are not aware of its importance, such as recognizing the quality management of assembled temporary equipment as a task of managing temporary structures that are dismantled after installation for this construction. The quality management work of assembled temporary equipment at the construction site is carried out in different ways for each construction site because there is no formalized procedure and the subject of performing. In addition, it is analyzed that the manager of the general construction company inspects and reflects the parts that need to be inspected without evidence, so transparency is not guaranteed and the result leads to a serious disaster. Therefore, the purpose of this study is to establish a document preparation-oriented system that provides systematic quality evaluation and management procedures for securing the quality of assembled temporary equipment, develops a checklist for quality evaluation and management, and supports history management on the web.

The Effect of Taeksa-tang for Dyslipidemia: A Systematic Review and Meta-Analysis (이상지질혈증에 대한 택사탕(澤瀉湯)의 효과 : 체계적 문헌 고찰 및 메타 분석)

  • Yeong-seo Lee;Tae-young Huh;Kyoung-min Kim
    • The Journal of Internal Korean Medicine
    • /
    • 제44권3호
    • /
    • pp.485-505
    • /
    • 2023
  • Objective: The purpose of this study is to assess the effectiveness and safety of using Taeksa-tang for dyslipidemia through a systematic review and meta-analysis of randomized controlled trials (RCTs). Methods: The search was conducted using keywords such as "dyslipidemia", "hyperlipidemia", "taeksa tang", "zexie tang", and "takusha to" in 12 databases (Pubmed, Cochrane, Embase, ScienceDirect, CNKI, Wanfang, CiNii, RISS, KISS, ScienceON, OASIS, and DBpia) on April 13, 2023. There were no limits on the publication period and language. Cochrane's risk of bias (RoB) was used to evaluate the quality of the studies. A meta-analysis was conducted according to the outcome measurements such as total effective rate (TER), total cholesterol (TC), triglyceride (TG), HDL-cholesterol (HDL-C), LDL-cholesterol (LDL-C), and adverse effects, using the Review Manager web. Results: A total of 9 RCTs were selected. In evaluating the RoB, 2 studies mentioning the random sequence generation, 1 study conducting double blindness, and 8 studies without missing values were evaluated as low risk, while 1 study without mentioning the random sequence generation was evaluated as high risk. All other parts were evaluated as unclear risk. The treatment group (Taeksa-tang or Taeksa-tang-gagam) showed more statistically significant effects compared to the control group (Western medicine or Chinese patent medicine) in TER (RR : 1.24, 95% CI 1.15 to 1.34, P<0.00001), TC (MD : -1.12, 95% CI -1.68 to -0.56, P<0.0001), TG (MD : -1.08, 95% CI -1.65 to -0.51, P=0.0002), HDL-C (MD : 0.63, 95% CI 0.34 to 0.93, P<0.0001), LDL-C (MD : -0.81, 95% CI -1.10 to -0.53, P<0.00001). In addition, the treatment group showed lower adverse effects compared to the control group (RR : 0.30, 95% CI 0.12 to 0.74, P=0.008). Conclusion: This study suggests that Taeksa-tang is effective and safe to use for treating dyslipidemia. However, due to the low quality of the included studies, more clinical studies need to be conducted in the future to increase the possibility of clinical use.

On-site Inventory Management Plan for Construction Materials Considering Activity Float Time and Size of a Stock Yard (공정별 여유시간과 야적장 규모를 고려한 건설자재의 현장 재고관리 방안 연구)

  • Kim, Yong Hwan;Yoon, Hyeong Seok;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • 제43권1호
    • /
    • pp.79-89
    • /
    • 2023
  • The inventory of many materials requires a large storage space, and the longer the storage period, the higher the potential maintenance cost. When materials are stored on a construction site, there are also concerns about safety due to the reduction of room for movement and working. On the other hand, construction sites that do not store materials have insufficient inventory, making it difficult to respond to demands such as sudden design changes. Ordering materials is then subject to delays and extra costs. Although securing an appropriate amount of inventory is important, in many cases, material management on a construction site depends on the experience of the site manager, so a reasonable material inventory management plan that reflects the construction conditions of a site is required. This study proposes an economical material management method by reflecting variables such as the status of the preceding and following activities, site size, material delivery cost, timing of an order, and quantity of orders. To this end, we set the appropriate inventory amount while adjusting related activities in the activity network, using float time for each activity, the size of the yard, and the order quantity as the main variables, and applied a genetic algorithm to this process to suggest the optimal order timing and order quantity. The material delivery cost derived from the results is set as a fitness index and the efficiency of inventory management was verified through a case application.