• Title/Summary/Keyword: Safety Planning

Search Result 1,449, Processing Time 0.032 seconds

A Development of Reverse Supply Chain Simulation Model Considering a Recycling (재활용을 고려한 역공급사슬 시뮬레이션 모델 개발)

  • Lim, Seok-Jin;Park, Byung-Tae
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.4
    • /
    • pp.193-199
    • /
    • 2009
  • Recently, an industrial production-distribution planning problem has been widely investigated in Supply Chain Management(SCM). One of the key issues in the current SCM research area is reverse logistics network. This study have developed a simulation model for the reverse logistics network. The simulation model analysis reverse logistics network issues such as inventory policy, manufacturing policy, transportation mode, warehouse assignment, supplier assignment. Computational experiments using commercial simulation tool ARENA show that the real problems. The model can be used to decide an appropriate production-distribution planning problem in the research area.

Distribution Planning for a Distributed Multi-echelon Supply Chain under Service Level Constraint (서비스 수준 제약하의 다단계 분배형 공급망에 대한 분배계획)

  • Park, Gi-Tae;Kwon, Ick-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.3
    • /
    • pp.139-148
    • /
    • 2009
  • In a real-life supply chain environment, demand forecasting is usually represented by probabilistic distributions due to the uncertainty inherent in customer demands. However, the customer demand used for an actual supply chain planning is a single deterministic value for each of periods. In this paper we study the choice of single demand value among of the given customer demand distribution for a period to be used in the supply chain planning. This paper considers distributed multi-echelon supply chain and the objective function of this paper is to minimize the total costs, that is the sum of holding and backorder costs over the distribution network under the service level constraint, by using demand selection scheme. Some useful findings are derived from various simulation-based experiments.

Look-ahead Based Distribution Planning for Capacitated Multi-stage Supply Chains (생산 능력 제한이 존재하는 다단계 공급망을 위한 Look-ahead 기반의 분배계획)

  • Roh, Joo-Suk;Kwon, Ick-Hyun;Kim, Sung-Shick
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.139-150
    • /
    • 2006
  • The aim of this study is to establish an efficient distribution planning for a capacitated multi-stage supply chain. We assume that the demand information during planning horizon is given a deterministic form using a certain forecasting method. Under such a condition, we present a cost effective heuristic method for minimizing chain-wide supply chain inventory cost that is the sum of holding and backorder costs by using look-ahead technique. We cope with the capacity restriction constraints through look-ahead technique that considers not only the current demand information but also future demand information. To evaluate performance of the proposed heuristic method, we compared it with the extant research that utilizes echelon stock concept, under various supply chain settings.

A Study on MES Construction for Automobile Plant in China (중국 자동차 공장의 MES 구축 연구)

  • Lee, Doo-Yong;Zhang, Jing-Lun;Jang, Jung-Hwan;Yoo, Sung-Hee;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.265-270
    • /
    • 2012
  • This paper deals with the application and effects of MES for H automobile plant in China. There existed the production planning and the different work order in PL painting plant, but we can simultaneously prepare the painting parts and parts delivery and assembly according to painting color by introducing MES. We can respond the change of production planning and operate integratively the PL painting, parts storage and parts delivery and then we can results in reasonable logistics. We obtained the exact production information, correct work order, precise delivery order. We obtained not only the improvement of logistics but also the reduction of inventory.

A study on experimental analysis of production speed improvement by waste elimination of middle and small-sized companies (중소기업 낭비제거에 의한 생산속도 향상 실험분석 연구)

  • Lee, Sung-Ill;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.4
    • /
    • pp.131-137
    • /
    • 2016
  • In unlimited competition era changed rapidly, productivity improvement and raw cost reduction by working improvement are very important for the survival of middle and small-sized companies. At this moment, middle and small-sized companies are cleary important in domestic industry. Therefore, this researcher applied TPS(Toyota production system) 7 wastes by experiment planning method for wastes of lots of working processes at the manufacturing site of automobile assembly manufacturing company, D company, analyzed current system of D company applied so as to verify if value creation works and factors were minimized during the production and drew results by analyzing experimental planning for analyzing waste elimination.

A Study on a Maintenance Method Integrating Worker's Safety Aspects (작업자의 안전측면을 통합한 보전방법에 관한 연구)

  • Seo, Kwang-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.3
    • /
    • pp.15-19
    • /
    • 2007
  • This paper proposes a maintenance method to integrate worker's safety concerns into the process activities of the manufacturing system and it is to be considered as a part of the scope of maintenance engineering. The proposed method incorporates worker's health and safety considerations into maintenance engineering in each of the manufacturing process using reliability analysis. It can help to make a better planning and implementation of maintenance activities for the manufacturing system.

Analysis of Safety Decrees for Gas Safety Management System and its Development (주요선진국의 가스기술기준 체제분석 및 제도개선 발전 모형)

  • 김봉진;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.2
    • /
    • pp.51-63
    • /
    • 2001
  • Korea gas industrial because of received LNG in 1987 was converted by the Gas Safety Management System in relation to city gas, LPG and LNG. Gas accident were caused by treatment problem on the supplier and user, on technical and use management mater, on facilities and goods, and included problem with gas safety connection system. This study is present standard application plan of each department to use planning gas technical standard and gas utilization standard of introduction model than statute for change of self-regulation management system and complicated regulation of examination center and order.

  • PDF

A Study on the Methodology for Effective Safety Instruction (효율적인 건설안전 교육방법에 관한 연구)

  • 손기상
    • Journal of the Korean Society of Safety
    • /
    • v.2 no.3
    • /
    • pp.29-35
    • /
    • 1987
  • This study as a series of the previous study, "A Study on the Methodology for Planning Safety Prevention, " is to find out what method will be the best for efficient safety instruction using a questionware with the five questions. Based on the answers from directly working labors, this study has been processed with procedures as follows; 1) Review on general safety instruction. 2) Distribute questionwares to only on-the-job labors. 3) Analyze the results from questionwares. 4) Conclude efficient method from the results analyed.

  • PDF

3-D Temporary Facility Visualization Using BIM(Building Information Modeling) Technology

  • Kim, Hyun-Joo;Ahn, Hong-Seob;Kim, Woo-Young
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.37-42
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. Therefore, it is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop a safety identification system of temporary facilities, this research utilizes the BIM technology in retrieving important information by importing data from BIM models and use it in the safety planning stage.

Integrating Building Information Modeling and Health and Safety for Onsite Construction

  • Ganah, Abdulkadir;John, Godfaurd A.
    • Safety and Health at Work
    • /
    • v.6 no.1
    • /
    • pp.39-45
    • /
    • 2015
  • Background: Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. Methods: In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. Results: The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. Conclusion: From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite.