• Title/Summary/Keyword: SUPER-TALL BUILDING CONSTRUCTION

검색결과 66건 처리시간 0.02초

초고층 건축물 전력관리 시스템에 BIM 적용을 위한 기초적 연구 (A Fundamental Study on Applying BIM to Power Manage System of Super Tall Buildings)

  • 조찬원;권순호;이운재;노태임;옥종호
    • 한국CDE학회논문집
    • /
    • 제17권2호
    • /
    • pp.140-148
    • /
    • 2012
  • This study aims to provide power monitoring system for super tall buildings with 3D BIM (Building Information Modeling) technology. In order to realize this subject, standard specifications for BIM objects and attributes were studied through analyzing processes and elements of electrical utilities for power management systems applied for super tall buildings. These standard BIM specifications could be used by designers, contractors and facility operators, and thus could be helpful to realize BIM information sharing between multiple disciplines and construction phases. And further study has been suggested to develop standard specification and applications from this study.

Wind-induced vibration fragility of outer-attached tower crane to super-tall buildings: A case study

  • Lu, Yi;Zhang, Luo;He, Zheng;Feng, Fan;Pan, Feng
    • Wind and Structures
    • /
    • 제32권5호
    • /
    • pp.405-421
    • /
    • 2021
  • To gain insight into the wind-induced safety concerns associated with attached tower cranes during the construction of super-tall buildings, a 606 m level frame-core tube super-tall building is selected to investigate the wind-induced vibration response and fragility of an outer-attached tower crane at all stages of construction. The wind velocity time history samples are artificially generated and used to perform dynamic response analyses of the crane to observe the effects of wind velocity and wind direction under its working and non-working resting state. The adverse effects of the relative displacement response at different connection supports are also identified. The wind-resistant fragility curves of the crane are obtained by introducing the concept of incremental dynamic analysis. The results from the investigation indicate that a large relative displacement between the supports can substantially amplify the response of the crane at high levels. Such an effect becomes more serious when the lifting arm is perpendicular to the plane of the connection supports. The flexibility of super-tall buildings should be considered in the design of outer-attached tower cranes, especially for anchorage systems. Fragility analysis can be used to specify the maximum appropriate height of the tower crane for each performance level.

비정형 초고층 건물의 골조공사를 위한 가변형 테이블폼 (A Variable Table Form for Concrete Structural Frame Work of Irregular-Shaped Tall Buildings)

  • 임현수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.35-36
    • /
    • 2011
  • Recently, an irregular-shaped super tall building has been increased, aiming toward landmarks of cityscape. However, the complex floor plan derived from an irregular shape requires considerable resources including time, cost, and effort to meet complex structural framework. Based on the motivation, the study proposes a table-form system that is variable slab form appropriate to an irregular shaped floor through improving limitations of an existing table-form system. The variable table-form is expected to reduce construction resources and improve constructability on an irregular floor plan of super tall buildings as well.

  • PDF

Form Follows Function - The Composite Construction and Mixed Structures in Modern Tall Buildings

  • Peng, Liu
    • 국제초고층학회논문집
    • /
    • 제3권3호
    • /
    • pp.191-198
    • /
    • 2014
  • The tall building and super tall building has been a common building type in China, with multiple functions and complex geometry. Composite construction is broadly used in tall building structures and constitutes the mixed structure together with concrete and steel constructions. The mixture of the constructions is purposely designed for specific area based on the analysis results to achieve the best cost-effectiveness. New types of composite construction are conceived of by engineers for columns and walls. Material distribution is more flexible and innovative in the structural level and member level. However the reliability of computer model analysis should be verified carefully. Further researches in the design and build of composite construction are necessary to ensure the success of its application. Composite or Mixture Index is suggested to be used as a performance benchmark.

Significant Progress in Construction Equipment of Super High-Rise Building

  • Zhang, Kun;Wang, Hui;Wang, Kaiqiang;Cui, Jian;Chen, Bo;Li, Di
    • 국제초고층학회논문집
    • /
    • 제7권3호
    • /
    • pp.243-253
    • /
    • 2018
  • The construction of rapid developing super high-rise buildings constantly faces great challenges and the innovation of construction equipment is a focus of these challenges. In this paper, three new inventions including the operation platform, tower crane and hoist are put forward around two of the most important issues of super high-rise building construction: vertical transportation and operation environment. Study background, composition of the equipment, working principles and key technologies are introduced in sequence. In the end, the paper summarizes the main problems in the further development of construction equipment.

Investigation of the SHM-oriented model and dynamic characteristics of a super-tall building

  • Xiong, Hai-Bei;Cao, Ji-Xing;Zhang, Feng-Liang;Ou, Xiang;Chen, Chen-Jie
    • Smart Structures and Systems
    • /
    • 제23권3호
    • /
    • pp.295-306
    • /
    • 2019
  • Shanghai Tower is a 632-meter super high-rise building located in an area with wind and active earthquake. A sophisticated structural health monitoring (SHM) system consisting of more than 400 sensors has been built to carry out a long-term monitoring for its operational safety. In this paper, a reduced-order model including 31 elements was generated from a full model of this super tall building. An iterative regularized matrix method was proposed to tune the system parameters, making the dynamic characteristic of the reduced-order model be consistent with those in the full model. The updating reduced-order model can be regarded as a benchmark model for further analysis. A long-term monitoring for structural dynamic characteristics of Shanghai Tower under different construction stages was also investigated. The identified results, including natural frequency and damping ratio, were discussed. Based on the data collected from the SHM system, the dynamic characteristics of the whole structure was investigated. Compared with the result of the finite element model, a good agreement can be observed. The result provides a valuable reference for examining the evolution of future dynamic characteristics of this super tall building.

Information-based Smart Construction Management of High Rise Building Under the Complex Surrounding Environment in City Core Area

  • Liang, Haoqing;Li, Jian;Song, Weiqing
    • 국제초고층학회논문집
    • /
    • 제10권3호
    • /
    • pp.203-210
    • /
    • 2021
  • With the development of urbanization, the increasing of buildings density in urban core areas result in the complexity of construction environment. High-rise landmark building is always preferred in the construction of urban core areas. Super high-rise buildings construction are facing construction management difficulties due to the complex working conditions and enormous building system, especially with the complex surrounding environment of the urban core area, the construction management of super high-rise buildings in the area requires higher, refined and detailed standard. Based on a super high-rise project in a core area of Shanghai which has 370 m building height and 772,643 m2 building area, with complex surrounding environment, narrow construction site and many super-high-altitude crossing works. With the application of BIM technology, the Internet of Things, the LAN communication and other various intelligent mechanical equipment, information management systems, the efficiency and refinement of construction management are improved, ensuring the smooth implementation of the project while effectively controlling the impact on the surrounding environment.

The Structural Engineering Design and Construction of the Highest Occupiable Skybridge in the World: The Address Jumeirah Resort, Dubai, UAE

  • Hadow, Zaher;Dannan, Yamen
    • 국제초고층학회논문집
    • /
    • 제11권1호
    • /
    • pp.61-68
    • /
    • 2022
  • The Address Jumeirah Resort is a mixed-use 77-story tower reaching a height of 301 meters with a slenderness ratio of 13.5:1. The development is situated in the Jumeirah Beach District and accommodates 217 key five-star hotel suites, 478 residential apartments, 444 serviced-branded apartments, retail shops, ballrooms and entertainment facilities around the premises. The building has over 242,000 m2 of usable area. The project is an award-winning development that broke multiple Guinness records. The focus of the paper is to present the challenges faced in the structural design and construction of the super tall tower and the highest occupiable skybridge in the world.

The Research and Application of Innovative High Efficient Construction Technologies in Super High Rise Steel Structure Building

  • Dai, Lixian;Liao, Biao
    • 국제초고층학회논문집
    • /
    • 제3권3호
    • /
    • pp.205-214
    • /
    • 2014
  • The super high rise building construction is characterized by a large quantity of engineering works and structural components, high demanding of construction technology and complex cross operations. As the height of super high rise building increases, the construction difficulties increase, it is challenging the steel structural building construction technology. In this paper, the key technologies in the construction of Chinese modern super high rise steel structure building have been studied. The innovative tower crane supporting frame suspension disassembly technology has been developed to allow the crane supporting frame to turnover in the air without occupying materials stockyard. A new self-elevating platform technique which is capable of striding over structural barriers has been developed. This new technology allows the platform to be self-elevated along variable cross section column with a maximum 600 mm size change. A new automatic submerged arc welding technology has also been developed to ensure the process continuity and quality stability of welding job on the construction site.

프로젝트 공사기간과 연계된 극 초고층 타워크레인 최적화 선정에 관한 연구 (An Analysis Of Optimized Super Tall Building Tower Crane Selection Which Related With Project Construction Period)

  • 조지훈;조흥구
    • 한국건축시공학회지
    • /
    • 제9권6호
    • /
    • pp.131-139
    • /
    • 2009
  • 극 초고층 공사에서 합리적인 타워크레인 선정이 필수적이나 현장 실적 자료의 부족과 주관적인 경험에 의한 계획 수립, 체계적인 기준 부재 등으로 계획상 오류나 비효율성이 크다. 특히 극 초고층의 특성 중의 하나인 높이에 따른 영향 요소들에 대한 분석이 미비하여 단순히 장비의 기계적 특성을 가지고 양중 시간을 예측하고 있는 실정이다. 본 연구에서는 양중 계획 시 담당자가 활용하기에 용이하고 체계적인 양중 분석이 가능한 시스템을 개발 하였으며, 현존 최고층인 버지 두바이의 자료를 활용하여 가변형 통계 모델을 개발하였다. 또한 층당 적정 공기 여부를 선정한 장비를 바탕으로 검토 및 의사결정을 가능하게 함으로써 극 초고층 공기 산정 방법의 패러다임을 전환 시켰다는 의미도 있다.