• 제목/요약/키워드: Runs test

검색결과 214건 처리시간 0.028초

한국형 고속열차 시운전시험데이터 통합관리 프로그램 개발 (Test Database Management Program Development of Hanvit 350)

  • 이태형;박춘수;최성훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1586-1589
    • /
    • 2007
  • A prototype high-speed train system, Hanvit-350, has been developed in Korea since 1996. The train has reached the maximum speed of 352.4km/h during a test run on December 2004. It is presently undergoing various tests to stabilize its performance and to secure reliability. Until now, around 420 runs have been conducted and accumulates 190,000km trial run. The test database management program is developed using existing analysis program, LabVIEW and database program, Microsoft-SQL. The test database management program is used to analysis of test results and will be used to find out the correlation characteristics between parameters.

  • PDF

서울시 도시형 버스의 추행패턴에 관한 연구 (A Study of Driving Pattern of City-bus in the City of Seoul)

  • 정남훈;이우택;선우명호;이영재;엄명도
    • 한국자동차공학회논문집
    • /
    • 제10권2호
    • /
    • pp.55-65
    • /
    • 2002
  • Emission from road traffic is one of the major sources of air pollution, and provides some undesirable effects on the atmspheric environment and human health. In the city of Seoul, the higher portion of diesel vehicles runs compared with that of other countries. Emission from the diesel vehicles is much higher than that of other vehicles. In this study, the driving pattern of city-bus in Seoul is investigated through on-road vehicle test and compared with the test modes of other countries in order to examine appropriateness of the present test mode that is taken in our country.

신경회로망과 유전 알고리즘을 이용한 유전자 추출법과 이의 암 분류법에의 적용 (Gene selection method using neural networks and genetic algorithm and its applications to classification of cancers)

  • 조현성;김태선;전성모;위재우;이종호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 D
    • /
    • pp.2815-2817
    • /
    • 2002
  • Classification method of cancers using cDNA microarrays data was developed using genetic algorithms and neural networks. For gene selection, 2308 genes were ranked using genetic algorithms, and selected by frequency number of selection from 1000 of genetic iterative runs. To calculate fitness values, artificial neural networks are used as classifier. The small, round blue cell tumors (SRBCTs) which is difficult to distinguish via pathological single test was used as test diseases for classification, and the test results showed the 96% of exact classification capability for 25 test samples.

  • PDF

페인팅로보트의 자동궤적계획시스템 개발에 관한 연구 (Development of an automatic trajectory planning system(ATPS) for painting robots)

  • 서석환;우인기;노성기
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1990년도 한국자동제어학술회의논문집(국내학술편); KOEX, Seoul; 26-27 Oct. 1990
    • /
    • pp.394-399
    • /
    • 1990
  • We develop an automatic trajectory planning system (ATPS) for painting robots by proposing a new trajectory planning scheme. The new scheme considers geometric modeling, painting mechanics, and robot dynamics to output an optimal trajectory (in the sense of coating thickness and painting time) based on the CAD data describing the shape of objects, The new scheme is implemented in SUN/4 workstation to develop an ATPS for painting robots. To test the validity of the new scheme and to illustrate the developed system, numerous runs are performed and analyzed.

  • PDF

분산시뮬레이션을 통한 FMS 구축 (Realizing FMS Through Distributed Simulation)

  • 김성식;배경한
    • 대한산업공학회지
    • /
    • 제18권2호
    • /
    • pp.31-42
    • /
    • 1992
  • This paper introduces a distuibuted simulation scheme that is useful in the top-down FMS building approach. In the scheme, we first introduce "FMS Shell" that contains basic functions and structure of FMS's. To test a proposed FMS, appropriate features of the proposed FMS are added to the shell, then distributed simulation is performed with the resulting software. This runs like a real system only without hardware devices. An real application case is stated at later part of this paper.

  • PDF

구역화를 이용한 디지털 격자지형데이터의 단순화 알고리즘 (A Digital Terrain Simplification Algorithm with a Partitioning Method)

  • 강윤식;박우찬;양성봉
    • 한국정보처리학회논문지
    • /
    • 제7권3호
    • /
    • pp.935-942
    • /
    • 2000
  • In this paper we introduce a fast simplification algorithm for terrain height fields to produce a triangulated irregular network, based on the greedy insertion algorithm in [1,4,5]. Our algorithm partitions a terrain height data into rectangular blocks with the same size ad simplifies blocks one by one with the greedy insertion algorithm. Our algorithm references only to the points and the triangles withing each current block for adding a point into the triangulation. Therefore, the algorithm runs faster than the greedy insertion algorithm, which references all input points and triangles in the terrain. Our experiment shows that partitioning method runs from 4 to more than 20 times faster, and it approximates test height fields as accurately as the greedy insertion algorithms. Most greedy insertion algorithms suffer from elongated triangles that usually appear near the boundaries. However, we insert the four corner points into each block to produce the base triangulation of the block before the point addition step begins so that elongated triangles could not appear in th simplified terrain.

  • PDF

연장급전 전압강하 계산을 위한 전기철도 급전 시뮬레이터의 검증에 관한 연구 (A Study on Verification of PowerRail based on Voltage Drop under Extended Feeding Condition)

  • 김주락
    • 전기학회논문지
    • /
    • 제64권2호
    • /
    • pp.331-337
    • /
    • 2015
  • The power flow analysis of electrified railway is required complicated calculation, because of variable load. Train runs trough rail supplied by electric power therefore, the load value in electrified railway system fluctuates along time. The power flow algorithm in electrified railway system is different from general power system, and the power flow simulation is peformed by the particular simulation software. Powerail is simulation software for analysis of traction power supply system developed by KRRI, in 2008. This consists of load forecasting module, including TPS and time scheduling, and power flow module. This software was verified by measured current under normal feeding condition, however, has not been verified by voltage on the condition of extended feeding. This paper presents the verification of PowerRail based on voltage drop under extended feeding condition. This is performed by comparing simulation result with field test. Field test and simulation is done in commercial railway line.

무선통신을 이용한 실시간 고속열차 모니터링 시스템 개발 (Development of realtime high-speed train monitoring system using wireless communications)

  • 이태형;박춘수;한영재;최성훈;김석원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1691-1693
    • /
    • 2007
  • Establishing the realtime remote monitoring system of the moving test train is the important issue for the railway systems that provide comfort travel to the passengers. But it is not easy to transmit train's test data to remote site because the train runs tunnels. In this paper, we introduce the realtime monitoring system using wireless communication system which is installed in the test train. This system can provide both correct positions of unstable track and train's running status such as speed, kilopost and acceleration.

  • PDF

무선데이터통신을 이용한 한국형 고속열차 원격 모니터링 시스템 개발 (Development of Hanvit 350 remote Monitoring System using Wireless Data Communications)

  • 이태형;박춘수;한영재;최성훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1590-1593
    • /
    • 2007
  • Establishing the remote monitoring system of the moving test train is the important issue for the railway systems that provide comfort travel to the passengers. But it is not easy to transmit train's test data to remote site because the train runs tunnels. This paper represent the development results of Hanvit 350 remote monitoring system using wireless data communication system which is installed in the test train. This system can provide both correct positions of unstable track and train's running status such as speed, kilopost and acceleration.

  • PDF

시제고속열차의 신뢰도 목표 설정 및 평가 방안 (Reliability Target and Assessment of a Prototype High-Speed Train)

  • 박춘수;최성훈;이태형;김기환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1-6
    • /
    • 2007
  • A train is subject to a series of reliability-related tasks through its entire life cycle. Among them the reliability demonstration is required for commercial trains and the test is performed during the commissioning period or the early stage of the commercial operation. On the other hands various test are carried out for prototype trains and hence their operational condition is quit different from that of the commercial trains. One should take account of these differences when reliability assessment is needed for the prototype trains. This paper presents a procedure and an analysis method to evaluate reliability of a prototype train. Reliability data have been obtained through test runs of the HSR-350x and operational conditions for the KTX and HSR-350x have been analyzed to compare the reliability targets of the prototype train.

  • PDF