• Title/Summary/Keyword: Road under bridges

Search Result 53, Processing Time 0.029 seconds

Safety Evaluation of the Settlement Amount of the Bridge Earthwork Transition Area Using the Ground Penetrating Radar in the Soft Ground Section (연약지반 구간에서 지표투과레이더 활용한 교량 접속부 침하량 안전 평가)

  • Jung, Gukyoung;Jo, Youngkyun;Kim, Sungrae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.8
    • /
    • pp.17-22
    • /
    • 2022
  • To reduce the bump of bridge/earthwork transition area caused by the settlement of the soft ground during public use, the road agencies have been continuously overlay or repavement at those areas. In this study, the vehicle-mounted ground penetrating radar with 1GHz air-coupled antenna was used to estimate the settlement amount of those areas for nine bridges built in the soft ground. Results shows that it is possible to effectively measure the thickness of pavement up to a depth of 1 m on an asphalt road with ground penetrating radar technology that can inspect under the road surface. Distinctively deformation of the road surface, the variation in the thickness of the pavement measured at bridge/earth transition areas is equivalent to a minimum of 50 mm and a maximum of 600 mm, and there is a risk of cavity in the ground. The difference in the increased pavement thickness is 50~250 mm for each bridge connection, which may cause the differential settlement. In this study, by using the result of the ground penetration radar, a plan for improving drivability and maintenance of the settlement is suggested and applied to the field.

A Study on the Road Safety under Total Load and ESAL for trucks (대형트럭의 총하중과 축하중이 도로안전에 미치는 영향에 대한 연구)

  • Kim Hanxin;Lee ChangHo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.51-57
    • /
    • 2005
  • There are very large differences on the standards of gross weight and single axle weight for commercial motor vehicles between international and Korean standards. Short Wheelbase Truck are produced and run only in Korea. It has very serious effects on the durabilities of bridges and roads and makes logistic competitive power fall back and overconsuming energy. This paper deals with a comparative study of the international standards with Korean, grasps the drawbacks and makes up the suggestions to strengthen the logistic competitive power of Korea and reduce the maintenance cost for the roads and the consumption of energy.

  • PDF

Reinforcement Location of Plate Girders with Two Longitudinal Stiffeners (플레이트 거더의 2단 수평보강재 보강 위치)

  • Son, Byung-Jik;Lee, Kyu-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.6
    • /
    • pp.93-102
    • /
    • 2009
  • Because steel girder bridge has big slenderness ratio, buckling is very important in design. Local buckling of plate girders having two longitudinal stiffeners in different positions under various load conditions is investigated. Various parametric study according to the change of web height, transverse stiffeners and load conditions are examined. These parametric studies are performed by numerical simulation utilizing finite element method. The objective of this study is to present the rational reinforcement location of two longitudinal stiffeners. The results of analysis are compared to that recommended by korean specifications for road bridges(2003).

A Study on the Road Safety under Total Load and ESAL for trucks (대형트럭의 총하중과 축하중이 도로안전에 미치는 영향에 대한 연구)

  • Jin Han Xin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.3
    • /
    • pp.37-46
    • /
    • 2005
  • There are very large differences on the standards of gross weight and single axle weight for commercial motor vehicles between international and Korean standards. Short Wheelbase Truck are produced and run only in Korea. It has very serious effects on the durabilities of bridges and roads and makes logistic competitive power fall back and overconsuming energy. This paper deals with a comparative study of the international standards with Korean, grasps the drawbacks and makes up the suggestions to strengthen the logistic competitive power of Korea and reduce the maintenance cost for the roads and the consumption of energy.

Application of Personal Digital Assistant (PDA) for Mobile Bridge Management System (MBMS) (PDA를 이용한 무선교량유지관리(MBMS) Application 개발)

  • 이태식;이동욱;이성현
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.3
    • /
    • pp.223-231
    • /
    • 2004
  • The accumulated BMS data have made it easy to make reasonable decision-making for bride maintenance and repair work. In the developing period of BMS, the bridge management was not easy due to the lack of understanding of BMS and low credibility of the data. In recent years, it has been possible to enhance the credibility of the data and to expand the application scopes of BMS with the efforts of Local Road Construction Offices. The reasonable decision making for bridge management can improve the performance of bridges under the practical constraints such as limited budget. It can then result in the reduction of bridge maintenance budget. This study provides the methodology for the application of mobile internet-based KOBMS for bridge management. The data flow for BMS is the most important factor for decision-making on budget allocation, and this study establishes the basic scheme of the data flow for BMS. The implementation of PDA for BMS may suggest a new paradigm of 'Mobile' in the field of construction management.

A Method for the Effective Implementation of a Consignment Contract in Road Constructions (도로 수탁공사의 효과적 수행을 위한 방법론)

  • Bak, Gwon-June;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.153-161
    • /
    • 2010
  • The city planning of a local government is a continuous process that does not end with the creation of a plan but proceeds through decision-making, monitoring and evaluation phases. As a new city planning is changed and confirmed, there is a chance to construct a large scale road that is connected with an under constructed road. In this case, the expansion of the width and length of road, the addition of bridges or tunnels, and the change of the size and location of interchanges lead to many changes on road design and construction. In the past, the consignment contracts for a road construction have been made in limited numbers and for limited civil works. Now, it is growing in numbers and is making for large scale multi-works. However, the standard process and guidelines for the consignment contracts have not been suggested yet, so there is difficulty in performing the consigned road construction effectively. In this paper, the important factors for the consignment contracts are determined by construction document reviews and expert interviews. Based on these results, a standard process for the consigned contracts and a guideline for agreeing on construction cost are suggested. The costs that should be paid by a consignor are also defined.

Flexural Reliability Assessment of PSC-I Girder Rail Bridge Under Operation (사용중 PSC-I 거더 철도 교량의 휨모멘트에 대한 신뢰도 분석)

  • Kim, Ki Hyun;Yeo, Inho;Sim, Hyoung-Bo
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.187-194
    • /
    • 2016
  • It is necessary to determine reliability indexes of existing railway bridges prior to setting up a proper target reliability index that can be used to introduce a reliability based limit state design method to design practice. Reliability is evaluated for a six PSC-I girder railway bridge, which is one of many representative types of double-track railway bridges. The reliability assessment is carried out for an edge girder subjected to bending moment. In the assessment, the flexural resistance and the fixed-load effect were obtained using existing statistical values from previous research on the introduction of limit state design to road bridge design. On the other hand, the live-load effect was determined using statistical values obtained from field measurement for the Joong-ang corridor, on which heavy freight trains are frequently passing. The reliability assessment is performed by AFOSM(Advanced First Order Second Moment method) for the limit state equation, and a sensitivity analysis for the reliability is performed for each factor of the load and resistance effects.

Studies on Debris Flows by Heavy Rainfall in Osaek Area in July 2006 (2006년 7월 집중호우로 인한 오색천 유역의 토석류 발생과 그 특성)

  • YANG, Heakun;PARK, Kyeong
    • Journal of The Geomorphological Association of Korea
    • /
    • v.15 no.2
    • /
    • pp.25-35
    • /
    • 2008
  • Typhoon Ewiniar and Bilis followed by heavy rainfall in July 2006 triggered massive slope failures and debris flows along the Osaek valley within Seoraksan National Park. Since national road 44 is constructed along the fault-line, the susceptibility of hazard in the area is very high. Debris flows in Osaekcheon are mobilized from landslides near the ridgelines and peaks when heavy rainfall elevates pore pressure and adds weight to the hillslopes, causing failure. Stream flows falling onto the existing colluvium or channel-margin deposits also trigger debris flows. Steep slopes constructed along the road and thin regolith in the slope is the main reason for the landslide in the upper stream. In middle reaches of stream, under-fit drainage utilities and narrow bridges cause the overflow, this then triggers debris flow. Overflowing and erosion in the channel margin deposits is main reasons for the debris flow. The intensities and frequencies of heavy rainfall are certain to increase, so early warning and management system for the landslide-related hazard is urgently needed.

Structural evaluation of Aspendos (Belkis) Masonry Bridge

  • Turker, Temel
    • Structural Engineering and Mechanics
    • /
    • v.50 no.4
    • /
    • pp.419-439
    • /
    • 2014
  • In this study, the structural performance of a seven span masonry arch bridge was evaluated. Investigations were performed on Aspendos (Belkis) Masonry Arch Bridge which was located on road of Aspendos Acropolis City in Antalya, Turkey. The old bridge was constructed in the early of fourth century AD, but it was exposed to the earthquakes in this region and the overloading by the river water. The old bridge was severely damaged and collapsed by probably an earthquake many years ago and a new bridge was then reconstructed on the remains of this old bridge by Seljuk in the 13th century. The bridge has also been affected from overflowing especially in the spring of each year, so some protective measures should be taken for this monumental bridge. Therefore, the structural performance under these loading has to be known. For this purpose, an initial finite element model was developed for the bridge and it was calibrated according to ambient vibration test results. After that, it was analyzed for different load cases such as dead, live, earthquake and overflow. Three load combinations were taken into account by deriving from these load cases. The displacements and the stresses for these combination cases were attained and compared with each other. The structural performance of Aspendos Masonry Arch Bridge was determined by considering the demand-capacity ratio for the tensile stress of the mortar used in Aspendos Masonry Arch Bridge. After these investigations, some concluding remarks and offers were presented at the end of this study.

Impact factors of an old bridge under moving vehicular loads

  • Liu, Yang;Yin, Xinfeng;Zhang, Jianren;Cai, C.S.
    • Structural Engineering and Mechanics
    • /
    • v.46 no.3
    • /
    • pp.353-370
    • /
    • 2013
  • This paper presents a new method to study the impact factor of an old bridge based on the model updating technique. Using the genetic algorithm (GA) by minimizing an objective function of the residuals between the measured and predicted responses, the bridge and vehicle coupled vibration models were updated. Based on the displacement relationship and the interaction force relationship at the contact patches, the vehicle-bridge coupled system can be established by combining the equations of motion of both the bridge and vehicles. The simulated results show that the present method can simulate precisely the response of the tested bridge; compared with the other bridge codes, the impact factor specified by the bridge code of AASHTO (LRFD) is the most conservative one, and the value of Chinese highway bridge design code (CHBDC) is the lowest; for the large majority of old bridges whose road surface conditions have deteriorated, calculating the impact factor with the bridge codes cannot ensure the reliable results.