• Title/Summary/Keyword: Road management system

Search Result 733, Processing Time 0.027 seconds

Study about the Evaluation of Bridge Asset Valuation for Maintenance (유지관리를 위한 교량 시설물 자산 평가 방법에 대한 연구)

  • Lee, Dong Hyun;Kim, Joo Yeub;Ji, Seung-Gu;Lee, Sang Soon;Kim, Ji-won
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.13-23
    • /
    • 2012
  • PURPOSES : This study is to improve the highway management and rehabilitation efficiently by method for asset management. METHODS : Based on the literature review, The concept of this paper is to investigate the use of asset values from a Bridge management system to improvement of maintenance system more efficiently. This study is suggested for an evaluation method based on the current bridge condition by Written-down replacement cost of the assets. RESULTS : We suggests the optimization methodology of road asset valuation for budge distribution and performance measure. CONCLUSIONS : We evaluate all of national highway's bridge by the optimization methodology of road asset valuation, and suggest application methods of asset result.

Optimal Road Maintenance Section Selection Using Mixed Integer Programming (혼합정수계획법을 활용한 도로포장 보수구간 선정 최적화 연구)

  • Cho, Geonyoung;Lim, Heejong
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.65-70
    • /
    • 2017
  • PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.

A Methodology for Standard Establishment of Spatial Impact Zone according to Place Names of Road Sign in Urban Regions - Using the Road Sign Management System Database - (도시부 도로표지 안내지명에 따른 공간적 영향권 기준 설정방법에 관한 연구 - 도로표지관리시스템 데이터베이스를 활용하여 -)

  • Jung, In-Taek;Chong, Kyu-Soo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.15 no.6
    • /
    • pp.1-9
    • /
    • 2016
  • Place names of road sign mean various place names being used on road signs for path guidance of drivers such as administrative district, facility, road, etc. It is very important that not only the choice method of place names for connectivity of road signs but standard establishment of spatial impact zone according to place names. However this standard are not established currently, so it is difficult to fix the spatial range for changing place names around the main facility according to the new construction or relocation of main facility in urban region. Considering the use of big data, one of the Government 3.0, we need to utilize actively the road sign management system database. This paper suggested a methodology for standard establishment of spatial impact zone according to place names of road sign in urban regions based on the road sign management system database. To perform a case study, we selected a major facility ("City Hall") which is the most frequently used the place name of road signs and presented standard of spatial impact zone by urban size in 84 cities.

Construction Strategy of Road Imagery Database for the Highway Management System (도로관리통합시스템을 위한 도로영상 데이터베이스 구축 방안)

  • Jeong Dong-Hoon;Sung Jung-Gon
    • Spatial Information Research
    • /
    • v.14 no.1 s.36
    • /
    • pp.1-13
    • /
    • 2006
  • To understand road state more quickly and accurately, KICT(Korea Institute of Construction Technology) executing a project that acquire high resolution color CCD images of the whole national highway every 10m, and offer images to the HMS(Highway Management System). At this time, national highway images of the Kyeonggki-Do, Kangwon-Do and Chungcheong-Do province were linked to the HMS and being offered to user. In this paper, from acquisition using highway photologging vehicle to database construction, the whole image-related data processes are described such as match images with their positions one to one or rearrange data acquired by road line to by management office.

  • PDF

The Method of Creating the Road Network Database for an Integrated Road Management System (도로관리 종합정보 시스템을 위한 도로망 데이타베이스 구축방안)

  • 김충평;이강원;김경희
    • Spatial Information Research
    • /
    • v.3 no.1
    • /
    • pp.55-63
    • /
    • 1995
  • The database design, which logically sets the base structure and orga¬nization of the database, is performed by considering the users requirement, the relations between various data, and the relations between data and application field.The road network data must be created to have geometrical topological structure, because various data elements are needed to recognize the state of each section and to relate between data element. In this study, we propose a method of creating the road network database for an integrated road management system.

  • PDF

A Study on the Implement of Image Recognition the Road Traffic Safety Information Board using Nearest Neighborhood Decision Making Algorithm (최근접 이웃 결정방법 알고리즘을 이용한 도로교통안전표지판 영상인식의 구현)

  • Jung Jin-Yong;Kim Dong-Hyun;Lee So-Haeng
    • Management & Information Systems Review
    • /
    • v.4
    • /
    • pp.257-284
    • /
    • 2000
  • According as the drivers increase who have their cars, the comprehensive studies on the automobile for the traffic safety have been raised as the important problems. Visual Recognition System for radio-controled driving is a part of the sensor processor of Unmanned Autonomous Vehicle System. When a driver drives his car on an unknown highway or general road, it produces a model from the successively inputted road traffic information. The suggested Recognition System of the Road Traffic Safety Information Board is to recognize and distinguish automatically a Road Traffic Safety Information Board as one of road traffic information. The whole processes of Recognition System of the Road Traffic Safety Information Board suggested in this study are as follows. We took the photographs of Road Traffic Safety Information Board with a digital camera in order to get an image and normalize bitmap image file with a size of $200{\times}200$ byte with Photo Shop 5.0. The existing True Color is made up the color data of sixteen million kinds. We changed it with 256 Color, because it has large capacity, and spend much time on calculating. We have practiced works of 30 times with erosion and dilation algorithm to remove unnecessary images. We drawing out original image with the Region Splitting Technique as a kind of segmentation. We made three kinds of grouping(Attention Information Board, Prohibit Information Board, and Introduction Information Board) by RYB( Red, Yellow, Blue) color segmentation. We minimized the image size of board, direction, and the influence of rounding. We also minimized the Influence according to position. and the brightness of light and darkness with Eigen Vector and Eigen Value. The data sampling this feature value appeared after building the learning Code Book Database. The suggested Recognition System of the Road Traffic Safety Information Board firstly distinguished three kinds of groups in the database of learning Code Book, and suggested in order to recognize after comparing and judging the board want to recognize within the same group with Nearest Neighborhood Decision Making.

  • PDF

Feasibility Analysis Information Model for Road Construction Projects (도로 프로젝트의 타당성분석 정보모델 구축방안)

  • Yang Jin-Kook;Kim Soo-Yong;An Dong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-384
    • /
    • 2002
  • A road construction project needs a large scale of investment and tine. In this study, we will review some elements of feasibility analysis and derive points of the existing analyses. And we make some suggestions to improve the existing methods. We propose a 'A Feasibility Information System' for road construction projects. The system will be useful to make a feasibility study for road construction project and help us to predict risks in process of the projects.

  • PDF

Analysis of Road Pavement Condition and Structural Improvement Plan (서울시 도로포장 상태에 대한 분석 및 구조적 개선방안)

  • Bae, Yoon-Shin;Shin, Kyoung-Yub
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.2
    • /
    • pp.119-137
    • /
    • 2012
  • In this study, the damages and condition of road pavement were analyzed using pavement management system (PMS) for the structural improvement. Problems of road pavement management were issued by in-depth interview with workers in charge of plant, construction and supervision. By surveying advanced road pavement management, the way how to improve road pavement management in Seoul was discussed. In conclusion, it is necessary to take measures against road heavy traffic and heavy rain in summer. It was found that the problem of early damages of road pavement due to uniform layout with analyzing life cycle cost (LCC). According to the results of survey, it was suggested to strength practical training and to control precisely the temperature of pavement in the process of production and construction.

A Study on the Architecture Design of Road and Facility Operation Management System for 3D Spatial Data Processing (3차원 공간데이터 처리를 위한 차로 및 시설물 운영 관리 시스템 아키텍처 설계 연구)

  • KIM, Duck-Ho;KIM, Sung-Jin;LEE, Jung-Uck
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.4
    • /
    • pp.136-147
    • /
    • 2021
  • Autonomous driving-related technologies are developing step by step by applying the degree of driving. It is essential that operational management technology for roads where autonomous vehicles move should also develop in line with autonomous driving technology. However, in the case of road operation management, it is currently managed using only two-dimensional information, showing limitations in the systematic operation management of lane and facility information and maintenance. This study proposed a plan to construct an operation management system architecture capable of 3D spatial information-based operation management by designing a convergence database that can process real-time big data with high-definition road map data. Through this study, when using a high-definition road map based operation management system for lane and facility maintenance in the future, it is possible to visualize and manage facilities, edit and analyze data of multiple users, link various GIS S/W and efficiently process large scale of real-time data.

The Road Traffic Sign Recognition and Automatic Positioning for Road Facility Management (도로시설물 관리를 위한 교통안전표지 인식 및 자동위치 취득 방법 연구)

  • Lee, Jun Seok;Yun, Duk Geun
    • International Journal of Highway Engineering
    • /
    • v.15 no.1
    • /
    • pp.155-161
    • /
    • 2013
  • PURPOSES: This study is to develop a road traffic sign recognition and automatic positioning for road facility management. METHODS: In this study, we installed the GPS, IMU, DMI, camera, laser sensor on the van and surveyed the car position, fore-sight image, point cloud of traffic signs. To insert automatic position of traffic sign, the automatic traffic sign recognition S/W developed and it can log the traffic sign type and approximate position, this study suggests a methodology to transform the laser point-cloud to the map coordinate system with the 3D axis rotation algorithm. RESULTS: Result show that on a clear day, traffic sign recognition ratio is 92.98%, and on cloudy day recognition ratio is 80.58%. To insert exact traffic sign position. This study examined the point difference with the road surveying results. The result RMSE is 0.227m and average is 1.51m which is the GPS positioning error. Including these error we can insert the traffic sign position within 1.51m CONCLUSIONS: As a result of this study, we can automatically survey the traffic sign type, position data of the traffic sign position error and analysis the road safety, speed limit consistency, which can be used in traffic sign DB.