• Title/Summary/Keyword: Road Projects

Search Result 315, Processing Time 0.027 seconds

A Study on the Present Status of Development by Project Types of Environmental Assessment System (환경성평가제도 대상사업 유형별 개발실태 분석 연구 - 경기도의 개발사업을 대상으로 -)

  • Sung, Hyun-Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.6
    • /
    • pp.130-142
    • /
    • 2008
  • The objective of this study is to analyze the types and current status of development projects that underwent environment assessment in recent three years and provide basic data to encourage environment-friendly development projects in the future. This study was conducted by analyzing the pre-environment review reports and environment impact statements of development projects that took place in Gyeonggi province. Key findings are as follows. First, a total of 2,465 development projects spanning $173km^2$ were undertaken in Gyeonggi province in recent three years. This is equivalent to three times of the area of Anyang city. Second, types of development projects were in the order of factories and industrial parks, road construction, town (housing estates) development, sports facilities and waste treatment facilities. Public projects accounted for about 30%, while private investment projects represented 70%, indicating that private sector projects were as twice as high. The findings of this study show that the development density of Gyeonggi-do should be examined as a whole in order to develop a comprehensive, long-term plan and harmonize conservation and development systematically in Gyeonggi-do in a holistic perspective.

DEVELOPMENT OF IDEA HIERARCHY MODEL FOR IDEA GENERATION OF CONSTRUCTION VE

  • Jinkook Yang;Sungwoo Moon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.504-509
    • /
    • 2011
  • Recently, construction projects are very complicated and diverse such as high-rise buildings and big bridges, etc. These complicated projects call for a system which can effectively generate productive ideas and activities. Value Engineering (V.E.) activity within construction projects is a necessity for systematic design management and to improve construction ability. This need in the construction industry has required a regular implementation of VE into construction projects. For this reason; America, South Korea, and some other nations have adopted VE applications which control the baseline investments of the construction projects. The process of VE activity is a preferred system and a reasonable alternative. In particular, idea generation within these projects is an important stage in the VE job plan. In this study, VE idea patterns are extracted through best practice analysis from VE cases of road construction projects. Next, we suggest an idea hierarchy model to be used in conjunction with VE idea patterns. This model is supported by reasonable idea generation in VE activity of construction projects. Finally, this model could possibly be the outcome of successful VE results.

  • PDF

An Empirical Study on Implementation Procedure for Six Sigma Projects in Non-Manufacturing Process (서비스 및 사무관리 분야 6시그마 개선활동 진행절차에 관한 사례연구)

  • Kim, Chae-Soo;Kim, Youn-Geun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.1
    • /
    • pp.56-62
    • /
    • 2006
  • This paper is concerned with a six sigma application to non-manufacturing process. Based on the comparison to manufacturing process, non-manufacturing process has some specific characteristics. The main focus of this study is to introduce an empirical case study on the implementation of DMAIC procedures for non-manufacturing process. We use a simple and practical road map which consists of 13 steps. Some fundamental rules for DMAIC implementation in six sigma projects are also introduced.

A Study of Plans for systemizing Railway System Safety Technology Tree (철도시스템안전 기술트리 체계화 방안에 관한 연구)

  • Hong Seon-Ho;Cho Yeon-Ok
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.623-629
    • /
    • 2005
  • A technical road map is one of critical research methods which include mid/long term strategies and objectives. There are many of projects conducted using this road map. A technical tree is used at the step of planning of the projects. This research was aimed at reviewing previous systems for conducting researches for and a basis required for improving railway safety in the future by finding out inconsistency arising from physical WBS, which is methodology of defining in existing railway technical trees. In the process of this research, we considered differences between systems safety and prevention as well as natures of them using the established technical tree, and set up plans for improving technical tree to secure railway safety as an integrated system.

  • PDF

THE OPPORTUNITIES AND CHALLENGES FOR CONTRACTUAL CONSIDERATION OF CONSTRUCTION-RELATED CARBON EMISSIONS FROM CIVIL INFRASTRUCTURE PROJECTS

  • Changbum Ahn;SangHyun Lee;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.653-658
    • /
    • 2011
  • Construction works of civil infrastructure projects generate a considerable amount of carbon emissions by utilizing a set of energy-intensive equipment and causing traffic congestion. However, the voluntary efforts of the contractor to mitigate these emissions are at an early stage. To address this issue, this paper explores the opportunities to take carbon emissions that would be caused from construction works into consideration in contracting methods and procedures. The opportunities for reducing carbon emissions from construction activities themselves are examined under the framework of Performance Contracting for Construction (PCfC), and carbon emissions from traffic congestion are attempted to be incorporated into the Road User Cost (RUC) calculation. This paper also identifies and discusses major challenges that must be confronted when considering the mitigation of these emissions in contracting methods and procedures.

  • PDF

Forecasting tunnel path geology using Gaussian process regression

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Abdulhamid, Sazan Nariman;Ali, Hunar Farid Hama;Ibrahim, Hawkar Hashim;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.4
    • /
    • pp.359-374
    • /
    • 2022
  • Geology conditions are crucial in decision-making during the planning and design phase of a tunnel project. Estimation of the geology conditions of road tunnels is subject to significant uncertainties. In this work, the effectiveness of a novel regression method in estimating geological or geotechnical parameters of road tunnel projects was explored. This method, called Gaussian process regression (GPR), formulates the learning of the regressor within a Bayesian framework. The GPR model was trained with data of old tunnel projects. To verify its feasibility, the GPR technique was applied to a road tunnel to predict the state of three geological/geomechanical parameters of Rock Mass Rating (RMR), Rock Structure Rating (RSR) and Q-value. Finally, in order to validate the GPR approach, the forecasted results were compared to the field-observed results. From this comparison, it was concluded that, the GPR is presented very good predictions. The R-squared values between the predicted results of the GPR vs. field-observed results for the RMR, RSR and Q-value were obtained equal to 0.8581, 0.8148 and 0.8788, respectively.

A Study on Street Types and Application Patterns in High-Rise Apartment Housing - The Case Study of Prizewinners in the Design Competitions since the 1990s - (고층 아파트 단지의 동선 유형 및 적용 패턴에 관한 연구 - '90년대 이후 공영 아파트 설계 경기 당선안을 중심으로 -)

  • Kim, Hyung-Jin;Kim, Young-Suk;Park, Chan-Kyu
    • Journal of the Korean housing association
    • /
    • v.19 no.6
    • /
    • pp.33-44
    • /
    • 2008
  • The street system in multi-family housing is an important design element to control the circulation of vehicles and pedestrians, and to form the spatial organization of the projects. In particular, in the case of high-rise apartments, the street patterns have an influence on the safety, amenity, and convenience of facilities. Until now, however, the design of street patterns in most high-rise multi-family housing projects has diminished the quality of residential environments because priority of design consideration has primarily been given to planning road ways and parking areas. Nevertheless, the design competitions introduced for the first time in the 1980s have played a significant role in developing fresh ideas and concepts in housing design. Because street patterns have been respectably modified as a result of the generalizing of design competitions, it is important to review the ideas that have been proposed in competitions over the recent past. In this context, this study classified the types of street patterns and analyzed their design characteristics for the proposals of housing design competitions since the 1990s. As a result of this analysis, the road patterns are classified into 4 types: 1) serial type, 2) isolated type, 3) mixed type, and 4) not a road pattern due to the system of connection. In addition, these were further divided into 8 types: 1) loop, 2) ring, 3) penetration, 4) tree, 5) direct entry, 6) ring and penetration, 7) loop and penetration, 8) not a road pattern due to appearance and the collector.

A Study on the Test Bed Evaluation for the Ecological Restoration of Unused Road - Focused on the Experimental Construction Site in Young Dong Province of GyungBu Expressway(Seven years after construction.) - (폐도로 생태복원을 위한 시험시공지 평가 연구 - 경부선 영동군 황간지역 시험시공지에 대한 시공 후 7년 시점의 추적조사 -)

  • Jeon, Gi-Seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.19 no.5
    • /
    • pp.47-57
    • /
    • 2016
  • In the recent years, the incidence of abandoned concrete roads have been increasing rapidly due to road improvements and facilities route construction, these abandoned expressway and unused roads are scattered throughout the country but the management system is not clear, they does not be an effectively managed because there is no maintenance cost. In response to these social concern and expectation, the Korea Expressway Corporation that is management authority of the expressway is developing policy initiatives and various projects to restore the closed road to ecological for eco-friendly projects of the existing expressway. And as part of these projects, Hwanggan IC unmanaged abandoned concrete roads restoration project was done and it was conducting monitoring for ecological restoration that is not one-off but sustainable. After test construction over seven years at the time, test construction of four ways enforced but the boundaries have become blurred over time. And Pinus koraiensis, Callicarpa dichotoma and Sorbaria stellipilla var. typica planted in the site are dominating, else Amorpha fruticosa and Indigofera pseudotinctoria sowed are dominating. Invasive species is that Robinia pseudoacacia was growing in the colony. Over monitoring result time, the vegetation was taking root and the ecosystem was being restore. But the disturbance of vegetation happens due to planting of tree species that doesn't fit in the restoration area and advent of ecosystem Disturbing Species. The study will be providing a basic data that identify change of plant environment by monitoring of the site and soil environment during June to November 2016 and secure an objective evaluation data by analyzing the effects of ecological restoration for revegetation test bed evaluation for ecological restoration of expressway in ecological restoration construction in later.

Proper Estimating Method for Environmental Preservation Cost in Road Projects (도로공사 환경보전비의 적정 산출 방안)

  • Park, Ji-Sun;Lee, Sea-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.3-10
    • /
    • 2012
  • The current enforcement regulation of "Construction Technology Management Act" prescribes calculation standard of environmental preservation cost in construction site. According to this standard, environmental preservation cost is calculated by using the quantity-per-unit costing method or applied fixed rate on direct cost. However, when calculated by using the quantity-per-unit costing method it is few items to put in the budget according to standard of construction estimate and in the case of using the fixed rate on direct cost it is not considering various characteristics of the construction site. Therefore, it is needed a improvement plan of estimating method and management system for environmental preservation cost. In this study, it surveyed the actual state of the environmental preservation cost according to magnitude of project, site location, anti-pollution facilities and etc. over 38 road projects. The research reported in this paper environmental preservation cost was variously distributed over construction sites. Thus it needs to estimating method and management system to consider characteristics of construction site for environmental preservation cost.

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.