• Title/Summary/Keyword: Road Pavement Maintenance

Search Result 159, Processing Time 0.03 seconds

Performance Estimation and Maintenance Method for Road Pavement Sections (국도 포장의 장기 공용성 추정 및 유지관리 방안)

  • Lee, Young-Uk;Do, Myung-Sik;Lee, Jong-Dal;Jang, Min-Keun
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.125-129
    • /
    • 2007
  • In this paper, a PMS(Pavement Management System) application is presented to control the LCC(Life Cycle Cost) of road pavement. The aim of this paper is to provide the decision makers with the planning information regarding maintenance strategies for efficient road pavement management. The validity of PMS application presented in this paper is investigated through case studies for conducted for 22 national highway road sections in Korea.

  • PDF

Optimal Road Maintenance Section Selection Using Mixed Integer Programming (혼합정수계획법을 활용한 도로포장 보수구간 선정 최적화 연구)

  • Cho, Geonyoung;Lim, Heejong
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.65-70
    • /
    • 2017
  • PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.

A Study on Economic Feasibility of Highway Maintenance Considering Carbon Amount by Using KPRP (Korea Pavement Research Program) (탄소량을 고려한 도로 유지보수 경제성에 관한 연구: KPRP (Korea Pavement Research Program) 활용)

  • Nguyen, Dinh Thanh;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.879-890
    • /
    • 2017
  • The US Pavement Design method (AASHTO) and HDM-4, a road pavement maintenance decision system, are not suitable for domestic pavement design, construction and maintenance. KPRP(Korea Pavement Research Program) has been developed to reflect Korea's environmental conditions and vehicle characteristics, thereby, extending pavement life. The main objective of this study is to select the best alternative through Life Cycle Cost $CO_2$ (LCCC) calculations among three representative maintenance strategies using KPRP design software since the environment cost resulting from the extended pavement life will also differ. The analysis of this study illustrates that cumulative carbon emissions for 40 years in alternative 2 (Cutting and Overlaying at Year 30) is the lowest option among them, and the basic cost of $CO_2$ emission by various road maintenance and repair work can be used for suggesting an optimal maintenance strategy for highway agency.

A Study on the Improvement of Pavement for Bus Rapid Transit System in Seoul (서울시 중앙버스전용차로 포장방법 개선방안 연구)

  • Bae, Yoon Shin;Kwon, Wan Taeg;Lee, Sang Yum
    • International Journal of Highway Engineering
    • /
    • v.16 no.4
    • /
    • pp.11-19
    • /
    • 2014
  • PURPOSES: This study is to suggest the improvement for bus rapid transit system in Seoul METHODS: The maintenance cost for bus lane damages and plastic deformations are increased by bus passing speed, heavy bus weight, and climate change (localized torrential downpour, subtropical climate) and the accident risk has been increased. RESULTS: Recent analysis of pavement damage indicates that bus lane damage caused by heavy weight is overwhelming and it is urgent to prepare countermeasures. CONCLUSIONS : Pavement data of bus rapid transit system, bus transit numbers and pavement damage elements were analyzed. By analyzing pavement maintenance, design and construction, the countermeasures for the improvement of bus lane pavement and effective maintenance were suggested.

Development of Pavement Management System for Highway Maintenance (국도유지관리를 위한 포장관리시스템 개발에 관한 연구)

  • Lee, Young-Wook;Do, Myung-Sik;Lee, Jong-Dal
    • International Journal of Highway Engineering
    • /
    • v.9 no.4
    • /
    • pp.159-169
    • /
    • 2007
  • In this paper, a PMS(Pavement Management System) is presented for the public agency who wish to execute rational repair by referring to asset management information regarding road pavement. The aim of the paper is to provide the decision makers with the planning information regarding maintenance strategies for efficient road pavement management. We found that life cycle cost can be minimized and repair cost in each year fluctuates when repeating repair at the IRI management level. The validity of PMS application presented in this paper is investigated through case studies for conducted for 22 national highway road sections in Korea.

  • PDF

A Study on Evaluation of Sidewalk / Roadway Pavement Using Stone Block (스톤 블럭을 이용한 보.차도 포장의 적용성 평가)

  • Yoon, Won-Sub;Kim, Jong-Kook;Park, Sang-Jun;Cho, Chul-Hyun;Chae, Young-Su
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.259-266
    • /
    • 2008
  • Recently, the maintenance period of sidewalk pavement proposed in Ministry of Construction & Transportation to be extended by more than 10 years. Therefore it takes many interests in Durability and the maintenance. Beside sidewalk pavement, block pavement happened problems in parking and road less than 20km/hr about bearing capacity and durability, the maintenance. It interests about importance of environmentally friendly sidewalk pavement. It compared engineering characteristics about strength and durability through general pavement comparison with stone block pavement. It estimate bearing capacity in actual si-tu site and test site. It experimented plate bearing test and field density test. It verified about durability of pavement by construction availability of geosynthetics that is constructed by purpose of filter. Stone block pavement evaluated about application of sidewalk/road pavement on the basis of result.

  • PDF

Estimation of Performance and Pavement Life using National Highway Pavement Condition Index (NHPCI 지표를 활용한 공용성 추정과 수명 산정)

  • Do, Myung-Sik;Lee, Yong-Jun;Lim, Kwang-Su;Kwon, Soo-Ahn
    • International Journal of Highway Engineering
    • /
    • v.14 no.5
    • /
    • pp.11-19
    • /
    • 2012
  • PURPOSES: The new methodology is proposed for estimation of long-term performance and pavement life based on the national highway database in Daejeon area. Furthermore, this study tried to verify the applicability of performance estimation using NHPCI (National Highway Pavement Condition Index) on tendency of pavement deterioration as time goes by under Korean road environments. METHODS: Reliability theories are applied to estimate the mean life and to determine the appropriate distribution using 3 levels of traffic loads (high, medium, low) based on maintenance and rehabilitation history data for 15 years. RESULTS: As a result, Lognormal distribution is suitable for explanation of pavement lifetime in Daejeon area regardless of traffic loads. In addition, we found that the results of mean life and maintenance timing based on NHPCI for the pavement sections of 3 levels of traffic loads are available. CONCLUSIONS: Based on this study, it was found that mean life of high, medium and low levels of traffic loads are about 8.1 years, 12.2 years and 12.7 years, respectively. Higher level of traffic loads shorten the pavement mean life.

Estimation of Road Pavement Roughness using DGPS (DGPS 기법을 이용한 노면 평탄성 산정)

  • 이종출;하대환;서정훈;박규열
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.04a
    • /
    • pp.71-76
    • /
    • 2004
  • Development of industry is increased Traffic Volume and have brought increase of road. As a result, Maintenance-management expense of the whole road is rapidly increase. Operation of PMS (Pavement Management System) need that it is efficiently for maintenance-management the whole road network Into budget limited. PMS is effective management through Investigation of roughness, crack, plastic deformation, etc of road. Advanced nation recognizes necessity of maintenance-management of road, progress to investigation and research. Our country is lacking that systematic pms's application and research. Therefore, this research estimated using of surveying method of DGPS that roughness of road for investigation-step of PMS. At the future, this paper may contribute in research of automatic surveying system for road surface.

  • PDF

The development of pavement section and thickness design guidelines for rural access roads (부체도로 포장의 단면 설계 지침 개발 연구)

  • Hwang, Sung-Do;Kwon, Soo-An;Lee, Moon-Sup;Kim, Dam Ryung;Lee, Sang Yum
    • International Journal of Highway Engineering
    • /
    • v.19 no.2
    • /
    • pp.113-126
    • /
    • 2017
  • PURPOSES : This study proposes standards for rural access road pavement section and thickness design considering existing access road construction conditions; the study also proposes a complementary policy that can be used for design convenience. METHODS : Various literature review and case studies had been performed in terms of rural access road section and thickness design, both domestically and internationally, and this was followed by domestic rural access road field surveys. KPRP and KENLAYER were used to analyze the commonalities and predict the remaining life. Data on real cost is used to select an appropriate construction method through economic analysis. RESULTS : The economic efficiency of concrete pavement ($15{\times}15$) was the highest in terms of economic efficiency of performance life and traffic volume. In the case of asphalt pavement, it is considered that the most economical method is to implement micro-surfacing method four times as a preventive maintenance method (once every 10 years and 4.5 years for asphalt concrete pavement and MS construction method, respectively). Repairable asphalt pavement is advantageous for areas where heavy vehicles are expected to pass. In the case of other general areas, it is considered economical to place concrete ($15{\times}15$) pavement. However, as analytical results on its performance life are unavailable, it is to be considered for study in the future. CONCLUSIONS : This study proposed interim design guidelines based on various domestic and international design guidelines and case studies. However, in order to develop the final design criteria applicable to the field, it is necessary to (a) estimate the bearing capacity of the lower level of the pavement at various sites, (b) estimate the daily traffic volume, (c) implement advanced low-cost pavement technologies, and (d) propose maintenance standards and techniques for long-term performance.

Estimation of a Level of Service and Cost of Service Function for Road Pavements for Performance Management in the Public Sector (공공부문 성과관리를 위한 도로포장의 서비스수준과 서비스비용 함수 추정)

  • HAN, Daeseok;LEE, Suhyung;LEE, Sang Hyuk;YOO, In-kyoon
    • International Journal of Highway Engineering
    • /
    • v.18 no.4
    • /
    • pp.9-18
    • /
    • 2016
  • PURPOSES : This study aimed to evaluate the performance of pavement management works and to develop a function for estimating the level of service (LOS) and cost of service (COS) for the systematic and quantitative management of pavement performance in the public sector. METHODS : The International Roughness Index (IRI) was used as the performance index for pavement management. Long-term pavement performance data for a period of 7 years (2007-2014) collected by the National Highway Pavement Management System and historical maintenance budget data published by the South Korean government were used to develop the LOS-COS function. Based on the function, a model for estimating the appropriate budget as well as the network conditions was suggested. RESULTS : There was high degree of correlation between pavement performance and the investment level (R = - 0.74). The developed LOS-COS function suggested that the unit cost to improve the network IRI to 1 m/km was 32.6 billion KRW. Further, the maintenance costs normalized with respect to the LOS levels were LOS-A = 88.2 billion KRW, LOS-B = 55.6 billion KRW, and LOS-C = 23.0 billion KRW. CONCLUSIONS : This study proposes a simple way of developing a LOS-COS function. It also shows how to develop a network budget demand and condition estimation model using the LOS-COS function. In addition, it is the first attempt to evaluate the road maintenance budget in South Korea. It is expected that these results will help in the negotiations between the road managers and budget makers.