1 |
Bae, D.S., Jeon, Y.L., 1999. Reliability Analysis, ARKHE
|
2 |
Chung, S., Hong, T., Han, S. Son, J. and Lee, S., 2006. Life cycle cost analysis based optimal maintenance and rehabilitation for underground infrastructure management. KSCE J. of Civil Engineering, Vol.10, No.4, 243-253.
DOI
ScienceOn
|
3 |
Do, M.S. and Kim, J.H., 2009. Asset Evaluation Method for Road Pavement Considering Life Cycle Cost, Journal of the Korean Society of Civil Engineers, Vol.29, No.1D, pp.63-72.
|
4 |
Do, M.S., 2010. Estimation of Mean Life and Reliability of Highway Pavement Based on Reliability Theory, Journal of the Korean Society of Civil Engineers, Vol.30 No.5, pp.497-504.
|
5 |
Do, M.S. and Kwon, S.A., 2010. Selection of Probability Distribution of Pavement Life Based on Reliability Method, Journal of the Korean Society of Road Engineers, Vol.12, No.1, pp.61-69
|
6 |
Do, M.S., 2011. Comparative analysis on mean life reliability with functionally classified pavement sections, KSCE Journal of Civil Engineering, Vol.15, No.2 pp.261-270.
DOI
ScienceOn
|
7 |
Gharaibeh, N.G., and Darter, M.I., 2003. Probabilistic analysis of highway pavement life for Illinois, Transportation Research Record 1823, No.03-4294, pp.111-120,
|
8 |
Gourieroux, C., 2000. Econometrics of qualitative dependent variables, Cambridge Univ. Press.
|
9 |
KICT., 2008. 2007 Annual Research Report of the National Highway Pavement Management System.
|
10 |
KICT., 2010. 2009 Annual Research Report of the National Highway Pavement Management System.
|
11 |
Kim, S. and Kim, N., 2006. Development of performance prediction models in flexible pavement using regression analysis method, KSCE J. of Civil Engineering, Vol.10, No.2, pp.91-96.
DOI
ScienceOn
|
12 |
Kobayashi, K., Do, M. and Han, D., 2010. Estimation of Markovian transition probabilities for pavement deterioration forecasting, KSCE J. of Civil Engineering , Vol.14, No.3, pp.343-351.
DOI
ScienceOn
|
13 |
Kwon, S.W., Jung, K.Y., Seo, Y.C., 2002. A Study on Decision Criteria of traffic volumes for Choosing of Modified Asphalt Pavement in Korea National Highway, Journal of the Korean Society of Civil Engineers, Vol.4, No.3, pp.25-33
|
14 |
Lancaster, T, 1990. The eonometric analysis of transition data, Cambridge Univ. Press.
|
15 |
Lee, YJ., Do, M.S., Lim, K.S., Lee, S.H., 2011. Applicability of National Highway Pavement Condition Index and Estimation of Maintenance Demand and Agency Cost, Proceedings of the KSRE Conference 2011, pp.203-207.
|
16 |
Loizos, A. and Karlaftis, M.G., 2005. Prediction of pavement crack initiation from in-service pavements: A duration model approach, J. of the Transportation Research Board, No.1940, TRB, pp.38-42.
|
17 |
Mishalani, R. G., and Madanat, S. M., 2002. Computation of infrastructure transition probabilities using stochastic duration models, J. of Infrastructure Systems, 8(4), pp.139-148.
DOI
ScienceOn
|
18 |
Park, D.H., Lim, J.H., Nam, K.H., 2006. Concept and application of lifetime distribution for Engineers, Youngji Munhwa-sa.
|
19 |
Tsunokawa K. and Ul-Islam, R., 2003. Optimal Pavement Design and Maintenance Strategy for Developing Countries: An Analysis using HDM-4, The Intl. J. of Pavement Engrg, Vol.4. No.4, pp.193-208.
DOI
ScienceOn
|
20 |
Yang, J., Gunaratne, M., Lu, J.J., and Dietrich, B., 2005. Use of recurrent Markov chains for modeling the crack performance of flexible pavements, J. of Transportation Engineering, Vol.131, No.11, pp.861-872.
DOI
ScienceOn
|
21 |
靑木一也.山本浩司.津田尙胤.小林潔司., 2005. 多段階ワイブル劣化ハザドモデル, 土木學會論文集, No.798, VI-68, pp.125-136.
|
22 |
You, P.J., Lee, D.H., 2002. Methodology of a Probabilistic Pavement Performance Prediction Model Based on the Markov Process, Journal of the Korean Society of Civil Engineers, Vol.4, No.4, pp.1-12
|