• Title/Summary/Keyword: Risk management system

Search Result 2,373, Processing Time 0.042 seconds

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF

A Development of Integrated Risk Management Model of Large Construction Projects (건설분야 통합 리스크관리에 관한 구성 모델)

  • Kim Chang-Hak;Park Seo-Young;Kang In-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.101-108
    • /
    • 2004
  • The results of the study include a computerized system and a systematic Process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks In the construction project. The modules for computerizing this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The method logy for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

  • PDF

A Study on Application of Fatigue Risk Management System for Pilot to Fly Longer Hours (장시간 체공 항공기 조종사의 피로위험관리 적용 연구)

  • Kim, Dae Ho;Lee, Jang Ryong
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.27 no.2
    • /
    • pp.47-53
    • /
    • 2019
  • The development of the aviation industry and the changes in the military operation mission environment are demanding more long - distance operation (long - time flight), and such a flying environment is a risk factor for fatigue - related accidents. For the aviation related organizations such as ICAO and FAA, fatigue risk management system (FRMS) are applied along with flight time restriction regulations to prevent fatigue related accidents. The most important process in FRMS is fatigue risk management. Fatigue risk management systematically manages fatigue through scientific fatigue risk data collection and fatigue risk assessment. The purpose of this study is to applicate the assessment of scientific fatigue risk management to pilots of airplanes engaged in long flight. We reviewed the current state of risk management and FRMS through previous research. We also developed fatigue risk management indicators and examined the validity of internationally recognized fatigue risk data collection methods and fatigue risk assessment tools. There are 134 mission (flight) data used for development. In order to verify the indicators, the fatigue risk score between the items was assigned through pair-wise comparison. In addition, the verify test results were normalized.

A Study on the System of Risk Management in the Int'l Trade by Internet Network (인터넷무역위험(貿易危險)의 관리체계(管理體系)에 관한 고찰(考察))

  • Ha, Kang-Hun
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.15
    • /
    • pp.239-261
    • /
    • 2001
  • There are many kinds of risk in int'l trade by internet network, such as credit risk, mercantile risk, contingency risk, exchange risk, physical risk and the risk on internet network. Especially, risk management against credit risk and the risk on internet network are very important. The former is conventional but more important these days. The latter is a new risk that has been incurred owing to the int'l trade by internet network. The system of risk management against the former are firstly, to surely research credit of counterpart by internet, secondly, to certify the entity by password or fingerprint, thirdly, to pay the price under a letter of credit, fourthly, to use the system of int'l trade such as bolero, trade card, finally, to use the authority of electronic trade services. The system of risk management against the latter are firstly, to install the firewall on the own computer network, secondly, to entrust the management own computer network to the network security services firm, thirdly, to electronically communicate with counterpart through the certification authority, finally, to insure against the own network risk with the security insurance company.

  • PDF

A Study on the Conceptual model of Enterprise Risk Management System (전사적 Risk Management System의 개념적 모형에 관한 연구)

  • Yoon, Seung-Ok;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.2
    • /
    • pp.113-121
    • /
    • 2012
  • The important elements and conditions to improve corporate competitiveness are customer development, new product development, sales increase, net profit increase, and other factors. Even if those competitiveness elements are well prepared, obstacles may exist. In this paper, we examined the risk, the deadliest obstacle that can affect corporate. We selected the risk factors that exist in functional categories in the system connected complicatedly and variously by organizational value chain of corporate, and examined the conceptual model of Enterprise Risk Management System based on the precedent studies.

Research on Risk-Based Piping Inspection Guideline System in the Petrochemical Industry

  • Tien, Shiaw-Wen;Hwang, Wen-Tsung;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • v.7 no.2
    • /
    • pp.97-124
    • /
    • 2006
  • The purpose of this research is to create an expert risk-based piping system inspection model. The proposed system includes a risk-based piping inspection system and a piping inspection guideline system. The research procedure consists of three parts: the risk-based inspection model, the risk-based piping inspection model, and the piping inspection guideline system model. In this research procedure, a field plant visit is conducted to collect the related domestic information (Taiwan) and foreign standards and regulations for creating a strategic risk-based piping inspection and analysis system in accordance with the piping damage characteristics in the petrochemical industry. In accordance with various piping damage models and damage positions, petrochemical plants provide the optimal piping inspection planning tool for efficient piping risk prediction for enhancing plant operation safety.

Development of A Computerized Risk Management System for International EPCS Projects

  • Yoo, Wi Sung;Kim, Woo-young;Sung, Yookyung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.614-615
    • /
    • 2015
  • In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.

  • PDF

A Development of Integrated Prototype Model for Risk Management of Construction Projects (건설공사의 리스크관리를 위한 통합전산모형 구축)

  • Kim, Chang-Hak;Park, Seo-Young;Kang, In-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.469-480
    • /
    • 2006
  • The results of the study include a computerized system and a systematic process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks in the construction project. The modules for computerizing in this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The methodology for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

An Integrated Model of EMS and RMS (환경 경영시스템과 리스크 경영시스템의 통합)

  • Kim Jong-Gurl;Kim Chang-Soo
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2004.04a
    • /
    • pp.321-325
    • /
    • 2004
  • Many companies consider environment management system as the main back-bone system. Also, risk management is considered as hot issue in world wide leading companies. In view of efficiency , it is necessary to combine or integrate the environment management system and the risk management system. In this paper, we aim to propose an approach to integrate the environment management system(ISO 14001) and the risk management system (JIS Q 2001).

  • PDF

A Development of the Risk Identification Checklist through the Re-establishment of Risk Breakdown Structure of Construction Project (건설사업 위험분류체계의 재정립을 통한 위험인지 체크리스트 개발)

  • Chu Hae-Keum;Kim Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.109-117
    • /
    • 2003
  • The construction project is largely exposed to much more risk events over the project life cycle due to its complexity and size than the other industries. Therefore, the construction risk management process to identify and response the risk events is not only performing acutely but also proceeding systematically. The risk identification phase in the risk management process is to identify various risk events and define its characteristics. At this phase, the risk identification system is very useful tool to identify every possible risk events in the project. This study shows some problems of the existing risk identification system and proposes the modified risk identification system based on the project phases and the contract bodies, and also suggests partial but more enough detailed risk checklists to be implemented in the actual risk identification phase than any other existing risk breakdown systems to be examined at this study.