• Title/Summary/Keyword: Risk management system

Search Result 2,411, Processing Time 0.035 seconds

An Empirical Study on Risk Factors in Information System Project Management (정보시스템 프로젝트의 위험요인에 관한 실증 연구)

  • Cho, Suk-Jin;Lee, Seog-Jun;Hahm, Yu-Keun
    • Asia pacific journal of information systems
    • /
    • v.16 no.3
    • /
    • pp.143-158
    • /
    • 2006
  • Identifying risk factors in software risk management is imperative for project managers. The purpose of this paper is to provide software project risk factors validated by statistical analysis, and thus to help project managers alleviating the possibility of software project failure. Factor analysis with data collected from 264 Korean project managers and consultants identified 12 categories and 46 risk factors. T-test results showed that project managers and participants had statistically different perception on 3 risk factors among those 46 risk factors. We concluded by discussing implications of our findings and future research directions.

Development of Semantic Risk Breakdown Structure to Support Risk Identification for Bridge Projects

  • Isah, Muritala Adebayo;Jeon, Byung-Ju;Yang, Liu;Kim, Byung-Soo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.245-252
    • /
    • 2022
  • Risk identification for bridge projects is a knowledge-based and labor-intensive task involving several procedures and stakeholders. Presently, risk information of bridge projects is unstructured and stored in different sources and formats, hindering knowledge sharing, reuse, and automation of the risk identification process. Consequently, there is a need to develop structured and formalized risk information for bridge projects to aid effective risk identification and automation of the risk management processes to ensure project success. This study proposes a semantic risk breakdown structure (SRBS) to support risk identification for bridge projects. SRBS is a searchable hierarchical risk breakdown structure (RBS) developed with python programming language based on a semantic modeling approach. The proposed SRBS for risk identification of bridge projects consists of a 4-level tree structure with 11 categories of risks and 116 potential risks associated with bridge projects. The contributions of this paper are threefold. Firstly, this study fills the gap in knowledge by presenting a formalized risk breakdown structure that could enhance the risk identification of bridge projects. Secondly, the proposed SRBS can assist in the creation of a risk database to support the automation of the risk identification process for bridge projects to reduce manual efforts. Lastly, the proposed SRBS can be used as a risk ontology that could aid the development of an artificial intelligence-based integrated risk management system for construction projects.

  • PDF

Direction for the management of air pollutants based on health risk in Korea (위해성을 고려한 대기오염물질의 관리 방향)

  • Kim, Young Ju;Kim, Yong Pyo
    • Particle and aerosol research
    • /
    • v.13 no.2
    • /
    • pp.43-52
    • /
    • 2017
  • Policy direction for the management of air quality in Korea has been on the reduction of the average concentrations of the criteria air pollutants such as sulfur dioxide and fine particles. However, recently, risk based management of air pollutants becomes an important issue. In this study, to develop an effective air quality management policy direction in Korea, (1) the fourth Multiple Air Toxics Exposure Study (MATES IV) carried out in the South Coast Air Quality Management District (SQAQMD) in the USA is reviewed and (2) the results are compared with in these in Seoul and (3) policy directions are suggested. It was found that (1) systematic integrated study comprising of measurement, modeling, emission inventory estimation, and risk assessment was essential to estimate the health risk of air pollutants reliably, (2) cancer risk of diesel particle was dominant over other air pollutants, and (3) health risk based emissions were different from amount based emissions. It was suggested that (1) reducing the exposure from hot spots might important to reduce health risk from air pollutants and (2) an integrated air quality management administration system is important for the efficient management of air pollution.

An Exploratory Study for the Evaluation of Risk Factors in Information System Development Using AHP (AHP기법을 활용한 정보시스템 개발 프로젝트 위험요인 평가에 관한 탐색적 연구)

  • Jung Chul-Yong;Son Dong-Ki
    • The Journal of Information Systems
    • /
    • v.15 no.2
    • /
    • pp.77-93
    • /
    • 2006
  • Information system(IS) development projects are mostly unique in terms of the characteristics of projects such as project requirements, customers, project members, and development environment. Therefore, it is very hara by nature, to manage the development process systematically. In addition the long-term enlarged scale projects with more complexity and specificity required have brought in much more risk factors than before. The paper recognized risk factors in IS development projects and measured the importance of those risk factors using the AHP(Analytical Hierarchy Process) method. The results can be used in the risk management of IS development projects.

  • PDF

The development of CAMBRA; Updated CRA (Caries management by risk assessment (CAMBRA)의 발전; CRA 업데이트)

  • Lee, Su-Young
    • Journal of Korean society of Dental Hygiene
    • /
    • v.21 no.4
    • /
    • pp.321-336
    • /
    • 2021
  • The aim of this study was to investigate the caries management by risk assessment (CAMBRA) development process and the latest updated caries risk assessment for the domestic settlement of the CAMBRA program and the activation of dental clinics. A system for CAMBRA was published in California Dental Association (CDA) in 2007. To investigate whether CAMBRA can be successfully implemented outside a university setting, a practice-based research network (PBRN) was created in the San Francisco Bay Area. Based on the CAMBRA-PRAN clinical studies, the caries risk assessment (CRA) tool was updated for patients aged 6 through adults in 2019. The CAMBRA system is expected to be widely and actively used in the dental field in Korea to contribute to oral health care.

Development of Risk Analysis Method for Railway Facility Management (철도시설물 관리를 위한 리스크 분석기법 적용 방법론 연구)

  • Kang, Leen-Seok;Park, Seo-Young;Youn, Seon-Mi;Kim, Hyun-Soo
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.341-344
    • /
    • 2006
  • Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a web-based analysis system. In the first place for those researches, this study analyzes the present condition of risk management in the railway facility construction industry. Finally, this study defines risk management procedures as preparation, identification, analysis, response and risk analysis method to manage potential risks in the railway construction project.

  • PDF

A Study on IT Based Risk Management System Development for Business Continuity Management : Centering on Cases at Automobile Manufacturing Industry (비즈니스 연속성 확보를 위한 IT 기반 위험관리체계 구축 연구 : 자동차 제조 산업 사례를 중심으로)

  • Lee, Joontaik;Kim, Yanghoon;Na, Youngsub;Chang, Hangbae
    • The Journal of Society for e-Business Studies
    • /
    • v.18 no.2
    • /
    • pp.69-79
    • /
    • 2013
  • Management activities of Business was globalization and had changed to a global management. Under these circumstances, business management factors and the environment has changed rapidly. Accordingly, the number of risk categories in business has increased. Especially in recent years, the convergence of industry with IT has a pivotal role in the industry's business processes. However, information systems in the Internet environment increased the efficiency of business management. Also, it increased the degree of risk and the occurrence ripple effects. In this study, we proposed risk management framework for ensuring business continuity management in information system based automobile manufacturing industry. In detail, we analysis business process in automotive manufacturing industry and identify information assets and we analysis and assess the risk.

RISK ASSESSMENT USING BIM BASED SAFETY MANAGEMENT SYSTEM

  • Hongseob Ahn;Hyunjoo Kim;Wooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.107-110
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, falsework (temporary structures) in construction projects is fundamentally important. However, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. It is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop the safety assessment system, this research utilizes the BIM technology and collects important information by importing data from BIM models and use it in the planning stage.

  • PDF

A Proposal of Risk Management Framework for Design as a Secure Power Control System (안전한 전력 제어시스템 설계를 위한 위험관리 프레임워크 제안)

  • Park, Jun Yong;Shin, Sumin;Song, Kyoung-Young
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.26 no.2
    • /
    • pp.425-433
    • /
    • 2016
  • In smart grid, enhancement of efficiency and interoperability of electric power system is achieved through the connection with outer network, and this induces that power grid system is threatened increasingly, becomes the main target of cyber terrorism, and is sincerely required to design the secure power system. Although SSDLC(Secure System Development Life Cycle) is used for risk management from the design phase, traditional development life cycle is somewhat limited for satisfaction of information security indicator of power control system. Despite that power control system should reflect control entities of information security considering its own characteristics, validation elements are insufficient to apply into real tasks based on existing compliance. To make design of diagnostic model and assessment process for power control system possible and to give a direction for information security and present related indicator, we propose the new risk management framework of power control system which is applied operational security controls and standard architecture presented by IEC 62351 TC 57 with enterprise risk management framework.

A Basic Study for Selecting the Project Risk Management Check List (PRM(Project Risk Management) 체크리스트 항목 선정을 위한 기초연구)

  • Bang, Hong-Song;Kim, Jin-Kuk;Choi, Byung-Ju;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.99-100
    • /
    • 2017
  • In today's builders PRM(Project Risk Management) for Risk Management to fill out the competitive advantage, by and return it safe and take. But PRM has different standards for each construction company and can also see that even the list. In this study, consideration existing research through PRM by developing a list of check list to proceed to the basic research to help. In this study, PRM by creating a basis of the check list disclosed to the frame of reference. The results of this study by PRM of the check list for field application management system to provide a basis to build.

  • PDF