• Title/Summary/Keyword: Risk management factors

Search Result 2,601, Processing Time 0.035 seconds

A Study on The Determinants of New Product Development Performance (신제품개발성과에 영향을 미치는 요인연구)

  • Lee, Kwang-Soo;Ree, Min-Ho;Ree, Sang-Bok
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2010.04a
    • /
    • pp.310-320
    • /
    • 2010
  • In this study, factors affecting the development of new products and research about the relevance of the factors based on the research model was configured. Existing research and technology commercialization process of discrimination that occur in the importance of risk management and open innovation company's competitive advantage in new product development and affect the reporter know what the effect is used as a control variable effects. Factor in the development of new products through research and innovation capacity and knowledge management activities, the introduction of open innovation and enterprise level ever due to the level of risk management controls and the need for effective research to study the model was proposed.

  • PDF

Market Expansion Strategies for Small or Medium-sized Construction Companies by Developing Quantitative Risk Assessment Model

  • Yoo, Jinhyuk;Koh, Seungyoon;Seo, Induck;Cha, Heesung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.742-743
    • /
    • 2015
  • Korean construction industry has developed with national economy growth for a couple of decades. However, because of slump of real estate, the domestic construction industry was intimidated. In this situation, many construction company has no choice but to go abroad to find construction projects. However, almost small or medium-sized construction companies are very hard to operate their business because they have small funding ability and weak labor power. Therefore, this study aims to propose an assessment tool through analyzing risk factors of overseas construction projects for small or medium-sized companies by examining preceding research and interviewing industry experts. Weights of the risk factors are determined through the surveys of the industry practitioners. All of the data is configured into the assessment tool and this converts the quantitative information which leads to the optimal of strategies choice. This paper provides a quantitative measurement of possible performance and detailed assessment of each itemized risk factors. This assessment tool is qualified for industry experts so that it can safely be applied to the future projects. Ultimately, many small or medium sized construction companies will benefit from the tool proposed in this study to examine the potential of the overseas market expansion.

  • PDF

Risk Identification and Priority Evaluation of Military Facility Relocation by Endowment and Concession Project (기부대양여 사업에 의한 군사시설 이전의 리스크 요인 도출 및 우선순위 평가)

  • Kim, Kukjoo;Ahn, Sungjin;Park, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.3-10
    • /
    • 2020
  • The endowment and concession has been put to practical use for the relocation projects of military Facilities. Yet, in terms of the project implementation, delay of a great deal of the projects is occurring due to related regulations and standards, as well as a lack of mutual understanding between project implementers and military units. This study analyzes the risk factors by identifying and prioritizing the potential risk factors at each stage of project implementation such as the issues that limit project characteristics and implementation. Among the derived risk factors, request exceeding facility standards in the licensing and design phases, opposition to troop relocation in the project approval phase, design change during construction phase in the construction and completion phases, dissenting opinions on endowed/conceded property in the property disposal phase and absence of facility standards in the MOA conclusion phase were found to be the main object of consideration in risk management. This study is expected to provide project managers with a guideline for effectively pursuing the projects, as it provides prioritization and optimization of risk management.

An Empirical Study on the Influence Factors of the Mobile Cloud Storage Service Satisfaction (모바일 클라우드 스토리지 서비스 이용만족에 영향을 미치는 요인에 관한 실증연구)

  • Choi, Kwangdoo;Cho, Insu;Park, Heejun;Lee, Kiwon;Kang, Junmo
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.3
    • /
    • pp.381-394
    • /
    • 2013
  • Purpose: Nowadays, Mobile Cloud Storage services are used widely. For sustainable use of this service, we need to determine what factors affect satisfaction. Therefore, the purpose of this study is to identify the factors that influence satisfaction. Methods: To analyze factors that influence satisfaction, this study sets the factors into three dimensions such as service quality, perceived risk, and individual characteristics and analyze the causal relationship between influence factors and satisfaction through Structural Equation Model. Results: The results of this study are as follows; among service quality, user interface and reliability influenced satisfaction, but adaptability did not have any influence. Perceived risk of illegal access had a negative influence on satisfaction, while perceived risk of privacy leakage did not have significant influence on satisfaction in perceived risk. At last, self-efficacy had a significant influence on satisfaction. Conclusion: We identified the influence factors that influence satisfaction. Our findings will be necessary for Mobile Cloud Storage service providers to strengthen their service.

Visualizing Method of 4D Object by Weight of Construction Risk Factors (4D객체 활용에 의한 건설공사 리스크 인자별 중요도 시각화 기법연구)

  • Kang, Leen-Seok;Park, Seo-Young;Kim, Chang-Hak;Moon, Hyoun-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.571-573
    • /
    • 2006
  • This study suggests a reasonable method for visualizing risk management level by risk weight linked with 4D model. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks in the construction project. The modules for computerizing in this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The final results include a method for visualizing risk level by each element of the project by using 4D simulation technique. It can be used as a visualized risk management tool instead of current system using numerical data.

  • PDF

Comparison of Six Observational Methods for Assessing Arm- and Hand-intensive Tasks (어깨 및 팔 동작 부하 측정을 위한 관찰적 기법 비교)

  • Dohyung Kee
    • Journal of the Korea Safety Management & Science
    • /
    • v.26 no.2
    • /
    • pp.87-92
    • /
    • 2024
  • This study aims to compare six observational methods for assessing arm- and hand-intensive tasks, based on literature review. The comparison was conducted in viewpoints of body regions, force/external load, motion repetition, other factors including static posture, coupling, duration/break, pace, temperature, precision task, and final risk or exposure level. The number of risk factors assessed was more, and assessment procedure was more complex than the observational methods for assessing whole-body postural loads such as Ovako Working Posture Analysis System(OWAS), Rapid Upper Limb Assessment(RULA), and Rapid Entire Body Assessment(REBA). Due to these, the intra- and inter-reliabilities were not high. A past study showed that while Hand Arm Risk Assessment Method(HARM) identified the smallest proportion of the work tasks as high risk, Strain Index(SI) and Quick Exposure Check(QEC) hand/wrist were the most rigorous with classifying most work tasks as high risk. This study showed that depending on the observational technique compared, the evaluation factors, risk or exposure level, and evaluation results were different, making it necessary to select a technique appropriate for the characteristics of the work being assessed.

The factors to identify high risk family (고위험가족 선별을 위한 위험요인 분석)

  • 방숙명
    • Journal of Korean Academy of Nursing
    • /
    • v.25 no.2
    • /
    • pp.351-361
    • /
    • 1995
  • The main purpose of the study is to identify critical risk factors for development of a family assessment tool to screen high risk family. This study used a conceptual framework of family diagnosis developed by Eui-sook Kim's (1993) and analyzed risk factors to identify the high risk family. As employing a explorative and methodological study design, this study has four stages. 1. In the first stage, 34 family risk factors were identified by doing intensive literature review on conceptual framework of family diagnoses. 2. In the second stage, above risk factors were tested for content validity by consultation with 29 persons in community health nursing, nursing education, family theory, and social work. 3. In the third stage, existing survey data was used for actual application of the identified risk factors. The survey data used for this purpose was previously collected for the community diagnosis in a region of Seoul. At the final stage, through the comparison between high risk and low risk families, initially identified 34 risk factors decreased to 25 risk factors. Among 34 risk factors, six factors did not agree with content of questionnaries sand two factors were not significant in differentiating the high risk family Also, two risk factors showed high correlation between themselves, so only one of those two factors was chosen. As a result, twenty-five risk factors chosen to identify the high risk family are following ; 1. A single parent family due to divorce or death of a partner, or unweded single mother 2. A family with an unrelated household members 3. A family with a working mother with a young child 4. A family with no regular income 5. A family with no rule in family or too strict rules 6. A family with little or no support from other lam-ily members 7. A family with little or no support from friends or relatives 8. A family with little or no time to share with each other 9. A family with family history of hypertension, diabetus, cancer 10. A family with a sick person 11. A family with a mentally ill person 12. A family with a disabled person 13. A family with an alcoholic person 14. A family with a excessive smoker who smokes more than 1 pack / day 15. A family with too much salt intake in their diet. 16. A family with inappropriate management skills for family health 17. A family with high utilization of drug store than hospital to solve the health problems of the family 18. A family with disharmony between husband and wife 19. A family with conflicts among the family members 20. A family with unequal division of labor among family members 21. An authoritative family structure 22. A socially isolated family 23. The location of house is not residential area 24. A family with high risk of accidents 25. The drinking water and sewage systems are not hygienic. The main implication of the results of this study is clinical use. The high risk factors can be used to identify the high risk family effectively and efficiently. The use of high risk factors woule contribute to develop a conceptual framework of family diagnosis in Korea and the list of risk factors need to be revised continuously. Further researches are needed to develop an index of weight of each risk factor and to validate the risk factors.

  • PDF

A study on the Impact of Project Logistics Riskon Overseas Plant Business Performance (프로젝트 물류 리스크가 해외 플랜트 사업성과에 미치는 영향에 관한 연구)

  • Eun-Jin Park;Jin-Ho Oh;Keun-Sik Park
    • Korea Trade Review
    • /
    • v.45 no.2
    • /
    • pp.191-209
    • /
    • 2020
  • Project logistics is becoming increasingly important in overseas plant projects. Efficient logistics risk management is needed to reduce construction period and reduce costs. However, Korean construction firms bid unconditionally without sufficient experience and analysis on overseas plants contract, companies are gradually losing profitability on projects due to not considering profitability. Despite the significant effects on the profitability of Korean construction companies, and although these companies still continue to bid on overseas plant projects, policies to manage project logistics risks for safe transport and compliance with the contracted building schedule in the long term is still lacking. Hence, this study investigates the risk factors related to project logistics and to analyze the effect of project logistics risk on overseas plant business performance. We conducted a survey of project-related workers. The results of the analysis are as follows: First, among the logistics risk factors, overseas platform business people recognize operational risk and financial risk factors, which have a positive effect directly on overseas plant performance. Second, the ability to manage project logistics risks can have a significant impact on the success or failure of overseas plants. Finally, if logistics risk factors are managed on the basis of the research results confirmed through empirical analysis, it is possible to carry out more efficient and effective management of the project, which implies that this will have a positive effect on overseas plant business performance.

A Model of Risk Management Plan in the Development Phase of Urban Regeneration Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.11 no.2
    • /
    • pp.35-42
    • /
    • 2009
  • Recently, intensive urban redevelopment concentrated on new towns has reduced the number of settled population, and weakened various functions such as commercial, culture, education and welfare in old towns, and made the stagnation and declination of the entire or some parts of old towns. Urban regeneration project means renewing cities' functions in terms of physical, environmental, social, cultural, industrial and economic aspects or revitalizing the existing functions through improvement project in the entire or part of a city, which is now drawing keen attention from the public. However, urban regeneration project is huge in scale, needs long construction period and various complex facilities, and also characterized by complicated relations with many stakeholders. Due to such characteristics, there are many risks in the project. Therefore, systematic risk management is absolutely necessary to efficiently manage various risk factors inherent in urban regeneration project. The purpose of this research proposes a basic model to establish risk management plan and work process in order to help project participants to perform risk management more systematically and rationally in the development phase of urban regeneration project.

Development of Risk Analysis Method for Railway Facility Management (철도시설물 관리를 위한 리스크 분석기법 적용 방법론 연구)

  • Kang, Leen-Seok;Park, Seo-Young;Youn, Seon-Mi;Kim, Hyun-Soo
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.341-344
    • /
    • 2006
  • Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a web-based analysis system. In the first place for those researches, this study analyzes the present condition of risk management in the railway facility construction industry. Finally, this study defines risk management procedures as preparation, identification, analysis, response and risk analysis method to manage potential risks in the railway construction project.

  • PDF