• Title/Summary/Keyword: Risk management System

Search Result 2,381, Processing Time 0.03 seconds

Risk Assessment in the Shipbuilding Industry: Present and the Future

  • Jeong, Byung-Yong;Kim, Woo-Jin;Jeong, Ye-Seul
    • Journal of the Ergonomics Society of Korea
    • /
    • v.31 no.1
    • /
    • pp.143-149
    • /
    • 2012
  • Objective: The aim of this study is to gain an overview of the risk assessment and management system in the shipbuilding industry. Background: The use of risk assessment techniques has grown significantly in recent years. Method: Various references have been reviewed to evaluate risk assessment and management policy. Results: Adapting the risk assessment system has become an important approach not only to prevent industrial accidents but also to enhance the efficiency of works for shipbuilding workers. Conclusion: Risk assessment is an approved technology for operators to address larger hazards, and to ensure risks have been reduced to appropriate levels cost effectively. Application: These results can be used to provide baseline information for risk assessment and management policy.

A Study on the Control of Hazard Facilities Management system in Urban area by utilizing GIS (지리정보시스템(GIS)을 이용한 도심지 내의 위해시설 관리시스템 구축에 관한 연구)

  • Ham, Eun-Gu;Roh, Sam-Kew
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.5 no.4 s.19
    • /
    • pp.9-15
    • /
    • 2005
  • This research developed the RMIS(Risk Management Information System) which focus on works of risk management fields required of apply of a space information, and focus on the DB to establish and apply the space information efficiently with research scope on the LPG refueling station in city. On the basis of the RMIS, this research provides the baseline to lead on an efficiency of safety inspection of LPG refueling station, advance risk assessment, and efficient making decision of an accident correspondence assessment with interlocking the GIS representing risk through the automation of a quantitative risk assessment standardize requirement to control at real-time. The RMIS development process is as follows. firstly, Relational Database(RDB) was developed by using fundamental data both On-site and Off-site relating data as peforming risk assessment on the LPG refueling station in city. Second, the risk management integral database system was developed to monitor and control the risk efficiently for user with using the Visual Basic Program. Third, through interlocking the risk management integral database system and the GIS(Falcon-map) was suggested the decision making method. Represented results through out the RMIS program development are as follows. Firstly, the RMIS was established the mutual information to advance management the risk efficiently for user and inspector with using the risk management data. Second, as this study managed risk for on-site and off-site separately and considered effect for inside and outside of facility, constructed the basis on safety management which can respond to major accident. Third, it was composed the baseline to making decision that on the basis of user interface.

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

Analysis of risk factors for safety accidents for fisher onboard aquaculture fisheries management vessel (양식어업 어장관리선에 승선하는 어선원의 안전사고 위험요인 분석)

  • Seung-Hyun LEE;Su-Hyung KIM;Kyung-Jin RYU;Yoo-Won LEE
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.60 no.2
    • /
    • pp.170-178
    • /
    • 2024
  • This study aimed to quantitatively analyze the risk using data from 329 safety accidents that occurred in aquaculture fisheries management vessels over the recent five years (2018-2022). For quantitative risk analysis, the Bayesian network proposed by the International Maritime Organization (IMO) was used to analyze the risk level according to the fishing process and cause of safety accidents. Among the work processes, the fishing process was analyzed to have the highest risk, being 12.5 times that of the navigation, 2.7 times that of the maintenance, and 8.8 times that of the loading and unloading. Among the causes of accidents, the hull and working environment showed the highest risk, being 1.7 times that of fishing gear and equipment, 4.7 times that of machinery and equipment, and 9.4 times that of external environment. By quantitatively analyzing the safety accident risks for 64 combinations of these four work processes and four accident causes, this study provided fundamental data to reduce safety accidents occurring in aquaculture fisheries management vessels.

Risk Management and Assessment Methodology in System Design (위험관리 프로세서와 평가의 새로운 접근)

  • 조희근;박영원
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.2 no.2
    • /
    • pp.197-208
    • /
    • 1999
  • Recently, risk management is a very important issue in many industrial applications. This paper describes a general structure for risk management and suggests a new risk assessment methodology. In risk management applications of financial or insurance industries, there are many methodologies developed for practical use. However, areas for improvement exist to facilitate the application of the methods. Two major risk assessment methodologies have been developed and widely applied in system engineering. One is in its original development application from aerospace and defense industry, and the other was developed in applied software engineering. In a large and complicated system development application, an effective risk management can reduce total development cost as well as uncertainty in achieving project goals of schedule and performance.

  • PDF

Risk-Taking Decisions with Major IS Investment;System Downsizing Case

  • Shim, Seon-Young;Lee, Byung-Tae
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.339-344
    • /
    • 2007
  • In the cut-throat competitive environment of business, large-scale IS investment is becoming inevitable strategic necessity for gaining competitive advantage. However. it bears great deal of risk over all the associated processes so that the investment decisions need to be taken in a greatly careful manner. Nonetheless, Korean organizations are prominently showing risk taking behaviors regarding major is investment, in terms of system downsizing. Although decision theory argues decision makers' rational choice of options through the assessment of risk and benefit, the notable trend toward system downsizing in Korea defies common understandings on IS project risk. Furthermore, it encourages us to investigate many impenetrable characteristics underlying organizational risk taking decisions with IS investment. We found out that there is Significant effect of IS decision makers' risk propensity when they make system downsizing decisions. Moreover. we Identified that IS decision makers do not get a strong pressure of cost savings and have tendencies to mimic competitor's decisions.

  • PDF

A Study on the Development of Railway Risk Assessment Information Management System (철도 위험도평가 전산시스템(RAIMS)의 설계 및 개발에 관한 연구)

  • Park, Chan-Woo;Kwak, Sang-Log;Park, Joo-Nam;Wang, Jong-Bae
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1059-1064
    • /
    • 2006
  • Risk assessment of a railway system should be periodically conducted managing a large amount of accumulating accident/incident data and scenarios, which generally requires enormous time and efforts. Therefore, special information management system is essential for railway risk assessment, where data needed for decisions on managing the railway safety could be promptly supported. In this study, we develop the framework of a railway risk assessment information management system (RAIMS). The RAIMS is composed of two main modules: 1) hazard data processing module; 2) and risk assessment module. Hazard data could be turned into risk information using these two modules. The RAIMS will be useful in finding hazard conditions, quantitatively assessing the risk, and providing pertinent risk measures, eventually serving to prevent railway accidents and reduce severities of railway accidents.

  • PDF

Contemplation of Risk Management for Internet Banking System

  • Seo, Jang-Hoon;Park, Myeong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.2
    • /
    • pp.41-51
    • /
    • 2003
  • Next Generation internet banking service for important role of banking business competitive power separates service function of individual banking and should equip various service that coincides in each special qualities these are customer management, portfolio management, global corporation support etc. The past few years have been characterized by rapid changes in technology and the introduction of corporate and retail banking services through the Internet. the integration of e-banking platforms with legacy systems and the increasing dependence of banks on third party information service providers, all dramatically amplify the magnitude of risks to which banks are exposed. Risk management disciplines have not evolved at the same speed and many institutions, especially the smaller ones, have not been able to incorporate Internet banking risk controls within their existing risk management structures. This article provides an overview of the various risks which are heightened with Internet banking, and a holistic approach to managing these risks. In addition, the presentation will explain the different risk areas and the controls to be adopted to mitigate these risks.

The clinical application of dental caries management based on caries risk assessment and activation strategies (임상가를 위한 특집 3 - 우식위험도 평가에 근거한 치아우식증 관리의 임상적용 사례 및 활성화 방안)

  • Yoon, Hong-Cheol;Choi, Youn-Hee
    • The Journal of the Korean dental association
    • /
    • v.52 no.8
    • /
    • pp.472-477
    • /
    • 2014
  • The new paradigm of dentistry require the detection of caries in their earlier stages. To achieve this, a high technology detection device and systematic and organized caries management system are needed. Caries management by risk assessment (CAMBRA) model is representative caries management system that satisfied new paradigm. Dental caries prevention and treatment according to CAMBRA model is patient-centered, risk-based, evidence-based practice. Therefore, individual caries management such as CAMBRA should be performed through accurate assessment of caries disease indicators and comprehensive assessment of caries risk factors and protective factors. Based on the CAMBRA better effectiveness of comprehensive dental caries management including non-surgical treatment will be accomplished.

Visualizing Method of 4D Object by Weight of Construction Risk Factors (4D객체 활용에 의한 건설공사 리스크 인자별 중요도 시각화 기법연구)

  • Kang, Leen-Seok;Park, Seo-Young;Kim, Chang-Hak;Moon, Hyoun-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.571-573
    • /
    • 2006
  • This study suggests a reasonable method for visualizing risk management level by risk weight linked with 4D model. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks in the construction project. The modules for computerizing in this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The final results include a method for visualizing risk level by each element of the project by using 4D simulation technique. It can be used as a visualized risk management tool instead of current system using numerical data.

  • PDF