1 |
Seo, J. M., et al. Development of Risk Assessment System Model for Shipbuilding Industry, OSHRI Report 2007-57-928, 2007.
|
2 |
Kim, G. H., Kwon, S. M., Lee, K. B., Kim, Y. S., Lee, J. W. and Kang, K. S., The Method of Risk Assessment by AMEA, Journal of the KOSOS, 9(2), 97-111, 2007.
|
3 |
Kim, D. H. and Lee, J. H., Qualitative Assessment for Hazard on the Electric Power Installations of a Construction Field using FMEA, Journal of the KOSOS, 19(4), 36-41, 2004.
|
4 |
Kim, J. G. and Chung, J. H., Risk Assessment System and Its Application for Complex Equipment, Proceedings of the Safety Management and Science 2004 Spring Conference, 2004.
|
5 |
Kim, T. O., et al. Development of the Occupational Safety & Health Management System for Small & Medium Enterprises, OSHRI Report 2007-95-1020, 2007.
|
6 |
Kim, Y. H., Kim, K. S., Yoon, S. R., Um, S. I. and Ko, J. W., Risk Assessment and Application in Chemical Plants Using Fault Tree Analysis, Journal of the Korean Institute of Gas, 1(1), 81-86, 1997.
|
7 |
KOSHIPA, http://www.koshipa.or.kr/, 2011.
|
8 |
KOSHA, 2010 Statistics on Occupational Injuries and Illnesses, KOSHA, 2011.
|
9 |
Lee, J. Y., et al. OSHRI Report 2010-62-868, 2010.
|
10 |
Lee, Y. S., et al. A Study on the Analysis of Effect for the Application of Risk Assessment, OSHRI Report 2007-99-1024, 2007.
|
11 |
Lim, H. K., Lee, K. T., Bae, D. C. and Chang, S. R., Development of a Voluntary Hazard Assessment Model for Small- and Medium-Sized Shipbuilding Plants, Journal of the KOSOS, 26(2), 70-76, 2011.
|
12 |
Park, D. Y., et al. Development and Introduction of an OSH Regulatory Framework Based on Risk Assessment for Korean OSH Regulation Systems and Policy, OSHRI Report 2009-117-1344, 2009.
|
13 |
Park, D. Y., et al. Future Direction and Development on OSH Regulatory Bodies and Administrative Organizations, OSHRI Report 2010-OSHRI-994, 2010.
|
14 |
Chang, S. R., et al. Development of a Self-Audit Model for Hazard Assessment of Shipbuilding Industry, OSHRI Report 2008-101-1256, 2008.
|
15 |
HSE, Five Steps to Risk Assessment, Health and Safety Executive, HSE Books, Sudbury, UK, 1998.
|
16 |
Che, G. S., A Study on the Availability Prediction of Start-up Power Supply in Nuclear Power Plant by FTA Method, The Transactions of Korean Institute of Electrical Engineers, 48A(5), 517-523, 1999.
|
17 |
Chung, J. H., Kim, H. S., Choi, K. S. and Lee, Y. S., A study on the EPS Process of Quantitative Risk Assessment for the Safety Decision Making, Journal of the KOSOS, 14(2), 62-69, 1999.
|
18 |
Hong, S. M., Park, P., Kim, K. H and Sun, S. B., Case Analysis of Risk Assessment for Steel and Iron Works, Proceedings of the Safety Management and Science 2009 Fall Conference, 2009.
|
19 |
HSE, Review of Hazard Identification Techniques, Health and Safety Executive, HSE Books, Sudbury, UK, 2000.
|
20 |
HSE, Marine Risk Assessment, Health and Safety Executive, HSE Books, Sudbury, UK, 2002.
|
21 |
Jang, S. I., Lee, H. C., Jang, J. Y., Cho, J. H. and Kim, T. O., Cost-Benefit Analysis for Safety Management Cost using Quantitative Risk Analysis, Proceedings of the Safety Management and Science 2001 Fall Conference, 2001.
|
22 |
Jeong, B. Y., et al. A Study of Risk Assessment System from an Appraiser Standpoint, Proceedings of the Ergonomics Society of Korea 2007 Spring Conference, 420-424, 2007a.
|
23 |
Jeong, B. Y., et al. Risk Assessment by Accident Types in a Shipbuilding Company, Proceedings of the Ergonomics Society of Korea 2007 Fall Conference, 2007b.
|
24 |
Jeong, B. Y., et al. Development of Risk Assessment Model in the Shipbuilding Industry, Korea Employers Federation, 2008.
|