• 제목/요약/키워드: Risk assessment system

검색결과 1,362건 처리시간 0.028초

철도 위험도평가 전산시스템(RAIMS)의 설계 및 개발에 관한 연구 (A Study on the Development of Railway Risk Assessment Information Management System)

  • 박찬우;곽상록;박주남;왕종배
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.1059-1064
    • /
    • 2006
  • Risk assessment of a railway system should be periodically conducted managing a large amount of accumulating accident/incident data and scenarios, which generally requires enormous time and efforts. Therefore, special information management system is essential for railway risk assessment, where data needed for decisions on managing the railway safety could be promptly supported. In this study, we develop the framework of a railway risk assessment information management system (RAIMS). The RAIMS is composed of two main modules: 1) hazard data processing module; 2) and risk assessment module. Hazard data could be turned into risk information using these two modules. The RAIMS will be useful in finding hazard conditions, quantitatively assessing the risk, and providing pertinent risk measures, eventually serving to prevent railway accidents and reduce severities of railway accidents.

  • PDF

침몰선박의 관리를 위한 위해도 평가시스템 개발 (Development of the Risk Assessment Systems for Management of Sunken Ships)

  • 최혁진;류재문;김홍태;이승현;강창구
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제8권4호
    • /
    • pp.193-202
    • /
    • 2005
  • 본 논문에서는 침몰선박이 보유하고 있는 모든 위해요인을 체계적으로 규명하고, 위해요인으로 인한 손실정도를 정량적으로 산출하여 효과적이고 일관된 침몰선박 관리와 과학적이고 경제적인 침몰선박 처리 의사결정에 활용할 수 있는 침몰선박 위해도 평가모델 및 정보시스템의 개발내용을 소개하고자 한다.

  • PDF

사업장 위험성평가에 관한 법제의 비교법적 고찰 (A Comparative Study on the Legal System for Risk Assessment in the Workplace)

  • 정진우
    • 한국산업보건학회지
    • /
    • 제31권4호
    • /
    • pp.304-316
    • /
    • 2021
  • Objectives: By comparing and analyzing the legal system for risk assessment in South Korea with other advanced countries, the study is designed to identify the key elements of risk assessment and seek improvement measures while focusing on solutions to the execution of risk assessment violations. Methods: The study started with an awareness of the need to improve the legislation on the risk assessment of businesses in Korea. In order to reflect this problem consciousness in Korea's industrial safety and health legislation, risk assessment legislation in Japan, Britain, Germany, and Korea was analyzed in comparative terms through the literature. Results: Unlike the other advanced countries, the concept of risk assessment is defined in Korea in a broad sense that includes measures to reduce risk, and risk assessment in the manufacturing and design stages is not institutionalized. In the case of worker participation, there is a problem regarding effectiveness. It is problematic that compared to the other foreign countries there is a possibility that general risk assessment will be neutralized because it is recognized as a uniform general risk assessment for a particular risk assessment, as well as inadequate risk assessment. Conclusions: The areas diagnosed with problems compared to the legislation in other advanced countries should be improved by revising laws and administrative rules and supplementing the explanatory guidelines, etc. by referring to the legislation of these countries. In particular, the issue of enforcement for violations of risk assessment must be improved in order to ensure the effectiveness of risk assessment.

유해해양생물 위해성평가 제도의 문제점 및 개선방안 연구 (A study on the risk assessment system for the harmful marine species: the legal problems and solutions)

  • 이창수;모영동
    • 환경생물
    • /
    • 제38권4호
    • /
    • pp.691-704
    • /
    • 2020
  • 해양수산부는 사람의 건강과 재산을 위협하는 유해해양생물을 관리하기 위한 목적으로 17종의 유해해양생물을 지정했다. 유해해양생물의 지정 및 관리에 있어 2015년 11월 고시를 제정하고, 2019년 '해양생태계 교란종 및 유해해양생물의 지정 및 관리에 관한 지침(이하, 훈령)'을 개정하였다. 이 연구는 두 가지 목적을 가지고 있다. 첫째, 해양수산부가 운영하는 유해해양생물의 위해성평가제도의 도입에 대한 국민의 인식을 제고할 필요가 있다. 둘째, 현행 유해해양생물 지정 및 관리체계를 검토하여 현행 제도를 개선하고 정책제안을 제공하는 것이다. 이를 위해 본 연구에서는 유해해양생물의 위해성 위험 평가 제도'를 '위험'과 '평가'의 두 가지 정의로 검토하였다. 현 위해성평가 절차에 대한 본고의 검토 결과는 정성적 위해성평가 요소의 보완이다. 비록 정성적 평가기준이 가미되어 있지만, 현 위해성평가 절차는 정량적 위해성평가에 충실한 제도로 정성적 위해성평가 요소가 보완되었을 때 정량적 위해성 평가가 가지는 단점을 극복할 수 있을 것으로 보인다.

Risk of Material Misstatement in the Stage of Audit Planning: Empirical Evidence from Vietnamese Listed Enterprises

  • NGUYEN, Hoan;NGO, Thi Kieu Trang;LE, Thi Tam
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권3호
    • /
    • pp.137-148
    • /
    • 2020
  • The purpose of this study is to investigate factors influencing risk assessment of material misstatement in Vietnamese enterprises listed on stock market. Expert interview method was conducted to discover the scales for three variables including information system, trademark, and risk assessment of material misstatement. Survey method was used to examine the impacts of eight factors on risk assessment of material misstatement. Data is collected from 317 auditors who have excellent experience in auditing financial statements of companies listed on stock market. Then, data is processed by descriptive statistics, reliability analysis, factor extracted analysis, correlative regression analysis, and analysis variance of residual change. The research findings showed that business characteristic, stakeholder pressure, and economic environment have positive relationships with risk assessment of material misstatement. Three variables including operation control and monitor, control environment, and information system negatively affect to risk assessment. Specially, business characteristic and information system, which are elements in internal control, have strongest impact on risk assessment. One the other hand, assessment of internal control plays an important role not only in the audit plan stage but also throughout the stages of the audit implementation and ending. Therefore, appropriate solutions are proposed to carry out all audit stages.

열차제어시스템 안전성 확보를 위한 리스크 평가 방법 분석 (Risk Assessment Method for Guaranteeing Safety in the Train Control System)

  • 조현정;황종규;윤용기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.870-877
    • /
    • 2006
  • Recently, failures of equipments are linked directly to extensive damages of human lives or financial losses from the increasing uses of train control equipments utilizing computers. Then safety activities have to progress for guaranteeing safety during the system life-cycle. In this paper, we examine the methods for risk analysis and assessment of safety activities and propose optimized one method for risk assessment. There are original risk assessment methods; risk graph and risk matrix method under the qualitative analysis, IRF(Individual Risk Formula) calculations and statistical calculations method under the quantitative analysis. Best-Practice(BP) risk analysis method is proposed for combining advantages of the qualitative and the quantitative analysis. In the comparison of risk graph and risk matrix method for safety estimation, BP method has no applications published up to now, but we can expect that this method will be utilized widely for the risk assessment due to various strong points.

  • PDF

Dynamic risk assessment of water inrush in tunnelling and software development

  • Li, L.P.;Lei, T.;Li, S.C.;Xu, Z.H.;Xue, Y.G.;Shi, S.S.
    • Geomechanics and Engineering
    • /
    • 제9권1호
    • /
    • pp.57-81
    • /
    • 2015
  • Water inrush and mud outburst always restricts the tunnel constructions in mountain area, which becomes a major geological barrier against the development of underground engineering. In view of the complex disaster-causing mechanism and difficult quantitative predictions of water inrush and mud outburst, several theoretical methods are adopted to realize dynamic assessment of water inrush in the progressive process of tunnel construction. Concerning both the geological condition and construction situation, eleven risk factors are quantitatively described and an assessment system is developed to evaluate the water inrush risk. In the static assessment, the weights of eight risk factors about the geological condition are determined using Analytic Hierarchy Process (AHP). Each factor is scored by experts and the synthesis scores are weighted. The risk level is ultimately determined based on the scoring outcome which is derived from the sum of products of weights and comprehensive scores. In the secondary assessment, the eight risk factors in static assessment and three factors about construction situation are quantitatively analyzed using fuzzy evaluation method. Subordinate levels and weight of factors are prepared and then used to calculate the comprehensive subordinate degree and risk level. In the dynamic assessment, the classical field of the eleven risk factors is normalized by using the extension evaluation method. From the input of the matter-element, weights of risk factors are determined and correlation analysis is carried out to determine the risk level. This system has been applied to the dynamic assessment of water inrush during construction of the Yuanliangshan tunnel of Yuhuai Railway. The assessment results are consistent with the actual excavation, which verifies the rationality and feasibility of the software. The developed system is believed capable to be back-up and applied for risk assessment of water inrush in the underground engineering construction.

Establishing the Method of Risk Assessment Analysis for Prevention of Marine Accidents Based on Human Factors: Application to Safe Evacuation System

  • Fukuchi, Nobuyoshi;Shinoda, Takeshi
    • Journal of Ship and Ocean Technology
    • /
    • 제4권4호
    • /
    • pp.19-33
    • /
    • 2000
  • For the prevention of marine accidents based on human factor, the risk assessment analysis procedure is proposed which consists of (1) the structural analysis of marine accident, (2) the estimation of incidence probability based on the Fault Tree analysis, (3) the prediction of ef-fectiveness to reduced the accident risk by suitable countermeasures in the specified functional system, and (4) the risk assessment by means of minimizing of the total cost expectation and the background risk. As a practical example, the risk assessment analysis for preventing is investigated using the proposed method.

  • PDF

지하공간의 위험성평가 시스템에 관한 연구 (A Study on the Risk Assessment System of the Underground Space)

  • 박종근;노삼규;서영민
    • 한국화재소방학회논문지
    • /
    • 제16권2호
    • /
    • pp.70-74
    • /
    • 2002
  • 지하공간 중 지하가의 사고·사례와 문헌 연구 및 6개의 지하가 실태를 조사하여 검토하였다. 그리고 운영·관리 단계에서 위험 요인을 도출하여 화재안전대책의 평가요소 및 화재위험성평가 시스템을 제시하였다.

GIS기반을 이응한 도심지 터널굴착에 따른 인접 구조물 손상평가 시스템 개발 (Development of GIS Based Risk Assessment System for Adjacent Structures Due to Tunnelling-Induced Ground Movements in Urban)

  • 윤효석;박용원;오영석;김제규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.493-500
    • /
    • 2001
  • The construction of bored tunnels in soft ground inevitably causes ground movements. In the urban environment these may be of particular significance, because of their influence on buildings, other tunnels and services. The prediction of ground movements and the assessment of the potential effects on the structures is therefore an essential aspect of planning, design and construction of a tunnelling project in the urban environment. In this study, to minimize the effect of tunnelling-Induced ground movements on the adjacent structures, a system for tile settlement risk management was developed. The GIS based risk assessment system for adjacent structures developed in this study consists of several modules such as building information module, settlement evaluation module, potential risk assessment module for adjacent structures, and analysis module for monitoring data. This system focuses on controlling and managing construction processes that may lead to settlement In the surrounding buildings and can contribute to producing the optimum technical and economic design.

  • PDF