Dynamic risk assessment of water inrush in tunnelling and software development  

Li, L.P. (Geotechnical & Structural Engineering Research Center, Shandong University)
Lei, T. (Geotechnical & Structural Engineering Research Center, Shandong University)
Li, S.C. (Geotechnical & Structural Engineering Research Center, Shandong University)
Xu, Z.H. (Geotechnical & Structural Engineering Research Center, Shandong University)
Xue, Y.G. (Geotechnical & Structural Engineering Research Center, Shandong University)
Shi, S.S. (Geotechnical & Structural Engineering Research Center, Shandong University)
Publication Information
Geomechanics and Engineering / v.9, no.1, 2015 , pp. 57-81 More about this Journal
Abstract
Water inrush and mud outburst always restricts the tunnel constructions in mountain area, which becomes a major geological barrier against the development of underground engineering. In view of the complex disaster-causing mechanism and difficult quantitative predictions of water inrush and mud outburst, several theoretical methods are adopted to realize dynamic assessment of water inrush in the progressive process of tunnel construction. Concerning both the geological condition and construction situation, eleven risk factors are quantitatively described and an assessment system is developed to evaluate the water inrush risk. In the static assessment, the weights of eight risk factors about the geological condition are determined using Analytic Hierarchy Process (AHP). Each factor is scored by experts and the synthesis scores are weighted. The risk level is ultimately determined based on the scoring outcome which is derived from the sum of products of weights and comprehensive scores. In the secondary assessment, the eight risk factors in static assessment and three factors about construction situation are quantitatively analyzed using fuzzy evaluation method. Subordinate levels and weight of factors are prepared and then used to calculate the comprehensive subordinate degree and risk level. In the dynamic assessment, the classical field of the eleven risk factors is normalized by using the extension evaluation method. From the input of the matter-element, weights of risk factors are determined and correlation analysis is carried out to determine the risk level. This system has been applied to the dynamic assessment of water inrush during construction of the Yuanliangshan tunnel of Yuhuai Railway. The assessment results are consistent with the actual excavation, which verifies the rationality and feasibility of the software. The developed system is believed capable to be back-up and applied for risk assessment of water inrush in the underground engineering construction.
Keywords
tunnelling; water inrush; dynamic assessment; software development; engineering application;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Li, L.P., Lei, T., Li, S.C., Zhang, Q.Q., Xu, Z.H. and Zhou, Z.Q. (2014), "Risk assessment of water inrush in karst tunnels and software development", Arabian J. Geosci., 8(4), 1843-1854. DOI: 10.1007/s12517-014-1365-3 (March 25, 2014).   DOI
2 Li, S.C., Xue, Y.G., Zhang, Q.S., Li, S.C., Li, L.P., Sun, K.G., Ge, Y.H., Su, M.X., Zhong, S.H. and Li, X. (2008), "Key technology study on comprehensive prediction and early-warning of geological hazards during tunnel construction in high- risk karst areas", Chinese J. Rock Mech. Eng., 7, 1297-1307.
3 Li, X.P. and Li, Y.N. (2014), "Research on risk assessment system for water inrush in the karst tunnel construction based on GIS: Case study on the diversion tunnel groups of the Jinping II Hydropower Station", Tunn. Undergr. Space Technol., 40, 182-191.   DOI
4 Matthias, S., Niels, P.H., Arild, R. and Harald, B. (2012), "Risk assessment of road tunnels using Bayesian networks", Procedia - Social and Behavioral Sciences, 48, 2697-2706.   DOI
5 Merad, M.M., Verdel, T., Roy, B. and Kouniali, S. (2004), "Use of multi-criteria decision-aids for risk zoning and management of large area subjected to mining-induced hazards", Tunn. Undergr. Space Technol., 19(2), 125-138.   DOI
6 Mohamed, E.T. (2003), "Circular tunnel in a semi-infinite aquifer", Tunn. Undergr. Space Technol., 18(1), 49-55.   DOI
7 Saaty, T.L. (1979), "Applications of analytical hierarchies", Math Comput Simuin, 21(1), 1-20.   DOI
8 Saaty, T.L. (1990), "How to make a decision: the analytic hierarchy process", Eur. J. Oper. Res., 48(1), 9-26.   DOI
9 Shi, S.S., Li, S.C., Li, L.P., Zhou, Z.Q. and Wang, J. (2013), "Advance optimized classification and application of surrounding rock based on fuzzy analytic hierarchy process and Tunnel Seismic Prediction", Automat. Constr., 37, 217-222.
10 Wang, Y., Yang, W.F., Li, M. and Liu, X. (2012), "Risk assessment of floor water inrush in coal mines based on secondary fuzzy comprehensive evaluation", Int. J. Rock Mech. Min. Sci., 52, 50-55.   DOI
11 Xu, Z.H., Li, S.C., Li, L.P., Chen, J. and Shi, S.S. (2011), "Construction permit mechanism of karst tunnels based on dynamic assessment and management of risk", Chinese J. Geotech. Eng., 33(11), 1714-1725.
12 Yoo, C., Jeon, Y.W. and Choi, B.S. (2006), "IT-based tunnelling risk management system (IT-TURISK) - Development and implementation", Tunn. Undergr. Space Technol., 21(2), 190-202.   DOI
13 Zhang, Q.S., Li, S.C., Hang, H.W., Ge, Y.H., Liu, R.T. and Zhang, X. (2009), "Study on risk evaluation and water inrush disaster preventing technology during construction of karst tunnels", J. Shandong Univ. (Eng. Sci.), 39(3), 106-110.
14 Einstein, H.H. (1996), "Risk and risk analysis in rock engineering", Tunn. Undergr. Space Technol., 11(2), 141-155.   DOI
15 Beard, A.N. (2010), "Tunnel safety, risk assessment and decision-making", Tunn. Undergr. Space Technol., 25(1), 91-94.   DOI
16 Bukowski, P. (2011), "Water hazard assessment in active shafts in upper silesian coal basin mines", Mine Water Environ., 30(4), 302-311.   DOI
17 Choi, H.H., Cho, H.N. and Seo, J.W. (2004), "Risk assessment methodology for underground construction projects", J. Construct. Eng. Manage., 130(2), 258-272.   DOI
18 Ding, L.Y. and Zhou, C. (2013), "Development of web-based system for safety risk early warning in urban metro construction", Automat. Constr., 34, 45-55.   DOI
19 Duddeck, H. (1996), "Challenges to tunnelling engineers", Tunn. Undergr. Space Technol., 11(1), 5-10.   DOI
20 Eskesen, S.D., Tengborg, P., Kampmann, J. and Veicherts, T.H. (2004), "Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2", Tunn. Undergr. Space Technol., 19(3), 217-237.   DOI
21 Fouladgar, M.M., Yazdani-Chamzini, A. and Zavadskas, E.K. (2012), "Risk evaluation of tunneling projects", Arch. Civil Mech. Eng., 12(1), 1-12.   DOI
22 Jiang, A.N., Wang, S.Y. and Tang, S.L. (2011), "Feedback analysis of tunnel construction using a hybrid arithmetic based on Support Vector Machine and Particle Swarm Optimisation", Automat. Constr., 20(4), 482-489.   DOI
23 Karwowski, W.A. (1986), "Applications of approximate reasoning in risk analysis", In: Applications of Fuzzy Set Theory in Human Factors, (Waldmar and Anil Mital Ed.), Elsevier, New York, NY, USA, pp. 227-243.
24 Kong, W.K. (2011), "Water ingress assessment for rock tunnels: A tool for risk planning", Rock Mech. Rock Eng., 44(6), 755-765.   DOI
25 Li, L.P. (2009), "Study on catastrophe evolution of karst water inrush and its engineering application of high risk karst tunnel", Ph.D. Dissertation; Shandong University, Jinan, China.