Non-Value Adding Activities in South African Construction: A Research Agenda

  • Emuze, Fidelis;Smallwood, John
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권3호
    • /
    • pp.38-44
    • /
    • 2011
  • The central issue in this particular research is the seemingly inadequate achievement of optimum performance in the construction process, either with respect to value for money for the client and the entire construction supply chain or value in terms of the utility derived from built assets in spite of efforts by government and governmental bodies such as the Construction Industry Development Board (cidb) to increase industry performance. Therefore, based upon an extensive review of related literature, the paper reports on effects and causes of non-value adding activities in the construction industry in general, and South African construction in particular. The research findings indicate that activities that can be referred to as non-value activities are not only prevalent, but they can also be held responsible for performance related issues in terms of cost, time, quality and health and safety (H&S) in construction; and the exploration of pluralism in the research methodology may result in a robust model based upon the system dynamics approach.

중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안 (A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises)

  • 오요셉;김보현;백재용;정소영;최영재
    • 산업공학
    • /
    • 제25권2호
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.

한의학정보화 현황분석과 이에 따른 미래전략 연구 (A Study of Strategy According to the Analysis of Present State in Korea Medicine Information)

  • 송미영;김철
    • 한국한의학연구원논문집
    • /
    • 제12권2호통권17호
    • /
    • pp.47-62
    • /
    • 2006
  • This research is intended to analyze the necessity of the integrated organization for the performance in order to the extension of scale and the systematic promotion concerning to the Korean medicine informational project, and to research the promotional method of Korean Medicine information through the constitution of organization for preparing the informational basic. There are three main important subjects to be done in this research project. The initial issue is to devise a comprehensive and systematic plan of Korean medicine information according to the Korean Medicine Rearing Raw('03. 8). Furthermore, it is necessary to reinforce the integrated informational ability of Organizations concerning to the Korean Medicine. Finally, with the above works accomplished, the overall standard of Korean Medicine Information should be settled. Initially, we compose an advisory committee of the Korean Medicine Information in the first year. The members of the committee include the informational coordinates of related government agencies, the experts in Korean Medicine Information, and specialists in the domains of computer science and information. In the next phase, we derive the promotional strategy for 'Center for Korean Medicine Information'. In other words, by means of analyzing the current issues and outstanding problems of on-going research projects and environments, the ultimate directions of the whole activities are established. Also, we build the medium and long-range road map of Korean Medicine Information Research by setting strategy for the policy projects related to the area. With the various research activities in this project, we can achieve the following practical strategic benefits. Firstly, we can lay a foundation for the Korean Medicine Information by establishing the fundamental plan for 'Korean Medicine Information Center'. Secondly, information strategic projects about 'Korean Medicine Information Center'. Secondly information strategic projects about 'Korean Medicine Information Development' can be performed in more systematic fashion and promoted by stages. Finally, by confirming the contents of the Korean Medicine of KMS system, we invent an opportunity of new project in the field of the Korean Medicine Information by means of practicing and managing the 'korean Medicine Information Custom Service'.

  • PDF

중대형 망원경을 이용한 관측연구 현황 (SURVEY ON THE OBSERVATIONAL RESEARCH ACTIVITIES USING MID-TO-LARGE SIZE TELESCOPES)

  • 우종학
    • 천문학논총
    • /
    • 제25권4호
    • /
    • pp.107-112
    • /
    • 2010
  • By joining the Giant Magellan Telescope (GMT) project, Korean astronomers will get 10% of the GMT time, starting in the late 2010s. To prepare the GMT era, it is important to evaluate the current observational research activities. We surveyed the research programs performed by domestic astronomers during 2007A - 2010A period, using optical/near - IR telescopes with a medium to large aperture mirror (larger than 4 m). We describe the method and criteria of the survey, and present the results of the analysis based on the collected data.

S&T Collaboration in Developing Countries: Lessons from Brazilian Collaboration Activities with South Korea

  • Fink, Daniel;Hameed, Tahir;So, Minho;Kwon, Youngsun;Rho, Jae Jeung
    • STI Policy Review
    • /
    • 제3권2호
    • /
    • pp.92-110
    • /
    • 2012
  • An active policy role is suggested for collaboration that will enhance national level Science and Technology (S&T) capabilities. In contrast, some studies see a limited role of policy support for collaborative S&T research at the individual level (including research groups or institutional levels) due to their self-organizing nature. Two views on S&T collaboration look at different levels but existing research largely ignores the context of developing countries. This paper shows how S&T collaborations between Brazil and Korea have developed over the past two decades. The paper indicates the gaps between initiation and the actual establishment of collaborative research at national and individual levels, differences in the focus areas of research, differences in resources and project planning, and the nature of collaborations. Collaborative research activities at the national level were initiated before the individual level but activated later than the individual level; in addition, the focus areas of research were laid down earlier at the national level with individual collaborations focused on different areas. Project types remained different at each level (i.e. top-down and bottom-up) or with a slightly changing mix. This study suggests appropriate policy measures (such as the timely and effective information collection of activities at different levels and proactive coordination) that could reduce the gaps in the timing and alignment of research areas. This paper also alludes to an evolutionary model to develop S&T collaboration among developing countries.

Impact of Balance between Productivities on Repetitive Construction Projects

  • Shim, Euysup;Yoo, Wi Sung
    • 한국건축시공학회지
    • /
    • 제13권4호
    • /
    • pp.360-371
    • /
    • 2013
  • Fast delivery of construction projects provides more value to project owners. Batch production, which is production not in single pieces, but in batches, is a common approach in repetitive construction projects such as multi-unit residential building construction projects. In batch production, the use of a small batch size allows the early start of subsequent activities, and thus can lead to early completion of projects. In addition to batch size, balance between productivities in construction activities can affect project duration. However, the impact of the balance between productivities with regard to their order on project duration has not been studied. The main goal of this study is to test a hypothesis, which is that the order of construction activities' unbalanced productivities affects the amount of time reduction that can be achieved by using a small batch size. A computer-based simulation model was developed, and five different cases were simulated to test the hypothesis. The conclusion of the simulation result is that the order of productivities does not affect the time reduction achieved by using a small batch size. It is expected that the findings of this study can help general contractors make decisions in terms of batch size.

국내 SI 프로젝트 수행환경 진단 및 위험관리 방안 연구 (A Study on SI Project Environment and Risk Management Practice)

  • 김현수
    • 경영과학
    • /
    • 제16권1호
    • /
    • pp.203-218
    • /
    • 1999
  • This study presents a diagnosis of SI project environment and risk management practices in Korea. In particular, the stability of project environment, required skills for project managers, risk factors and usefulness of risk management activities are surveyed and analysed. Factor analysis and correlation analysis are performed to investigate any significant relationships among various risk management factors. The results indicate that SI project environment is not stable in Korea, and risk management can be a primary project management tool to deal with the situation. The results also that there's little significant difference in understanding not only between the clients and developers, but alto between the experienced managers and less experienced managers.

  • PDF

비용, 일정 및 기술적 성과를 고려한 통합 계획수립 프로세스 구현 방안 (Integrated Planning Process Implementation Method Based on the Cost, Schedule, and Technical Performance)

  • 유이주;박영원
    • 한국군사과학기술학회지
    • /
    • 제10권3호
    • /
    • pp.100-108
    • /
    • 2007
  • The purpose of the research is to propose an integrated project planning process and its implementation method. Although there is increasing interest in the application of the Earned Value Management(EVM) method in the project management area, the progress and maturity of the technical performance have not been included in assessing the Earned Value. The main concept of the planning process is to use cost, schedule, as well as the technical performance in the assessment of the Earned Value Management for Military R&D project management practices. The resulting process can enhance the efficiency of the project work by eliminating the currently duplicated activities between traditional project planning process and the newly implemented Earned Value Management process and by shortening the early planning process duration of projects adopting EVM practices.

Applying the ADDIE Instructional Design Model to Multimedia Rich Project-based Learning Experiences in the Korean Classroom

  • LEE, Youngmin
    • Educational Technology International
    • /
    • 제7권1호
    • /
    • pp.81-98
    • /
    • 2006
  • The purpose of this study was to apply the ADDIE instructional design model to develop multimedia rich project-based learning methods for effective instruction in a Korean mechanical engineering high school. This study was conducted as action research based on a high school situation. The study included 40 participants in a class purposively selected from 52 classes at 2080 student high school. Data were collected through observations, surveys and artifacts. Results indicated the multimedia rich project-based learning allowed students to take part in learning activities and there was close cooperation with and among group members to create better products. Also, the flexibility in the project-based learning environment allowed the participants to make decisions about their abilities, resources, and plans. Recommendations and implications for teacher educators as well as in-service and pre-service teachers are also presented.

재택근로와 가족자원경영학의 과제 (Home-Based Work and the Tasks of Family Resource Management)

  • 김외숙
    • 가족자원경영과 정책
    • /
    • 제2권2호
    • /
    • pp.83-92
    • /
    • 1998
  • The purpose of this study is to review the concept of home-based work, introduce the activities of American home economists on home-based work and propose the tasks of family resource management for home-based work. Home-based works is defined as the work which generates income at home and classified 3 types: home-based business, employed home-based work and homework. The activities of American scholars are reviewed focusing on the Coorperative Regional Research Project, NE-167, entitled "At-Home Income Generation: Impact on Management, Productivity and Stability in Rural/Urban Families"and the participants of the project. Finally the tasks of family resource management are pursued in terms of research, education and service.d service.