• Title/Summary/Keyword: Research Facility

Search Result 4,470, Processing Time 0.032 seconds

Assessment of TRACE code for modeling of passive safety system during long transient SBO via PKL/SACO facility

  • Omar S. Al-Yahia;Ivor Clifford;Hakim Ferroukhi
    • Nuclear Engineering and Technology
    • /
    • v.56 no.8
    • /
    • pp.2893-2905
    • /
    • 2024
  • Passive safety systems are integrated into the latest generation of Light Water Reactors (LWRs), including small modular reactors. This paper employs the US-NRC TRACE thermal hydraulic code to examine the performance of a passive safety condenser known as SACO, designed to serve as the ultimate heat sink for dissipating decay heat during accident scenarios. The TRACE model is constructed with reference to the PKL/SACO test facility. The safety condenser (SACO) is interconnected with the PKL facility via the secondary side of steam generator 1, effectively serving as a third natural circulation cooling loop during accident scenarios. In the present research, the thermal-hydraulic behavior of the PKL facility is investigated in the presence of the SACO passive safety system during an extended SBO with Loss of AC Power accident scenario. This SBO can be categorized into three distinct phases depending on the activation of the SACO system and the refilling process of the SACO pool. The first phase is depressurizing using primary and secondary relief valves, the second phase is cooling down using SACO system, and the third phase is the refilling of SACO pool. The findings indicate that the SACO system effectively manages to dissipate all decay heat, even though there is temporary evaporation of the SACO water pool. Furthermore, this study provides sensitivity analysis for the assessments of system codes on the selection of maximum time step.

A Study on the Planning of Indoor Environment Factors for Sustainable School Facility (지속가능한 학교시설을 위한 실내환경 계획 요소에 관한 연구)

  • Shin, Dong-Sik;Lee, Jong-Kuk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.10 no.1
    • /
    • pp.34-41
    • /
    • 2011
  • Global environment is getting deteriorated at an alarming rate. Eco-school could be one of the effective solutions to project our environment and a good sample of architecture to economize in total energies, resources and greenhouse gases. In case of our country, the study of eco-school planning is not sufficient compared with other countries, so this paper would be a good study on the indoor environment of the classroom by surveying their opinions and ideas from the group of users in school facility. The result of this study shows that the proper installation of building equipment and nature ventilation system is necessary to provide delightful environment for the students and to save the energy. To ensure that we have adequate saving and protection it is necessary to change the existing appraisal standard.

Development of Repair and Replacement Cost Management System for Public Buildings to Establish Accurate Facility Management Budgets

  • Choi, Min-Chan;Lee, Chun-Kyong;Jung, Tae-Gab;Park, Tae-Keun
    • Architectural research
    • /
    • v.14 no.2
    • /
    • pp.75-83
    • /
    • 2012
  • Buildings that are more than 10 years old generally have considerable repair and replacement costs due to the rapid deterioration of their systems. For public buildings in particular, which have national and social significance, considerable effort is required not only to ensure a long life cycle and safety but also to minimize the overall public expense. Along with increasing repair and replacement requirements, however, there have been problems related to the establishment of an accurate facility management budget. To address these concerns, a repair and replacement cost management system was constructed. This system manages both invested maintenance and forecast costs to establish a reasonable repair and replacement planning process and budget. The effectiveness of the system was verified through a pilot test targeting one of public Corporation (K).

Outside plant Facility Management using Geographic Information System (지리정보시스팀을 이용한 통신선로시설 관리)

  • 최지선
    • Spatial Information Research
    • /
    • v.2 no.1
    • /
    • pp.53-63
    • /
    • 1994
  • Korea Telecom provides a wide range of communicat ion services and plays an important role in bring advanced technologies to the society. Increasing needs for utility management lead up to develop a Telephone Outside plant Management System(TOMS) which combines facility management with Geog¬raphic Information System (GIS). TOMS is a powerful, flexible and effective outside plant facility management system. TOMS provides value added applic¬at ion softwares and easy-to-use user interfaces which make TOMS eas i ly adapted and extended to the individual sites. TOMS is now in use in 30 percent of central offices and will be used nation-wide by 1996.

  • PDF

An Experimental Study of Spray Nozzle Desalination Facility (담수화 설비 스프레이 노즐에 대한 실험적 연구)

  • SHIN HYUN-KYOUNG;JOO HYUN-TAE;PARK MIN-HO;PARK KYOUNG-MIN;KIM JIN-YOUNG;LIM JIN-YOUNG
    • Journal of Ocean Engineering and Technology
    • /
    • v.20 no.1 s.68
    • /
    • pp.26-31
    • /
    • 2006
  • Experimental research was undertaken to develop a domestic spray nozzle used on equipment for desalination. First, we made a test set-up in order to confirm nozzle efficiency of spray and distribution under different pressure conditions. Then, we found a maximum spray condition after verifying reliability of this facility. An optimum arrangement of the nozzle, based on the test result, was made using CATIA V5 and EXCEL.

Development of On-line/Off-line Light Facility Management Program (온라인/오프라인 조명시설 관리 프로그램의 개발)

  • Jeon, Chang-Dae;Chang, Byong-Kun
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.11a
    • /
    • pp.91-95
    • /
    • 2004
  • This paper concerns developing a real time on-line light facility management system using internet and building a database system for control box and street light. Also, we designed the system to minimize the disparity with the conventional management system by referring to a old management ledger format. Thus, the proposed method may enable the system manager to administer the light facility efficiently and to reduce the manpower cost, and time economically.

  • PDF

Preliminary Analysis of Solid Waste Management System for Seoul City by a Mixed Integer Programming Model (혼합 정수 계획 모형을 활용한 서울시 폐기물 관리 시스템 예비 분석)

  • Kim, Jae-Hee;Kim, Sheung-Kown
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.72-75
    • /
    • 2001
  • This paper presents a sophisticated mixed-integer linear programming model that may help regional decision-maker to develop long term plan of solid waste management The model revises Ni-Bin Chang(1996)'s integrated waste management models to fit Korean solid waste management system We apply this model to evaluate impact of facility sharing and coordinated operation among three self-governing districts in Seoul city Our study results indicate that facility sharing and coordinated operation among districts eliminate unnecessary landfilling and facility expansion.

  • PDF

Heuristics for the Access Network Design Problem in UMTS Mobile Communication Networks (UMTS 이동통신망의 액세스망 설계 문제의 해법에 관한 연구)

  • Kim, Hu-Gon;Chung, Yong-Joo;Paik, Chun-Hyun
    • Korean Management Science Review
    • /
    • v.27 no.3
    • /
    • pp.1-14
    • /
    • 2010
  • In this paper we study the access network design problem in Universal Mobile Telecommunication Systems (UMTS) networks. Given the location of radio base stations (node-Bs), their traffic demands, and the candidate facility centers for locating radio network controllers (RNCs), the problem is to determine the configuration of access network, including the number and location of facility centers, the number of RNCs in each facility center, and the links between RNCs and node-Bs, with the objective being to design such a network at the minimum cost. We provide a mathematical formulation of the problem with constraints on RNC and node-B capacities, along with a lower bounding method. We develop a heuristic algorithm with two different initial solution methods designed to strengthen the solution quality. The computational efficacy of their procedures is then demonstrated on a number of test problems.

A Study on Facility Layout for Optimamization of Material Flow System (물류시스템 최적화를 위한 설비배치에 관한 연구)

  • Park, Se-Joon;Lee, Young-Hae;Hur, Sun;Lee, Moon-Hwan;Yu, Ji-Yong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.162-165
    • /
    • 1998
  • We consider a facility layout problem for optimized material flow system design in the automated production system design. Existing facility layout algorithm have a weak point that arranged facilities have irregular shape or don't preserve their own shape and size. The proposed algorithm give a layout which is minimize total material handling cost and maximize space utility under preserving each facilities' own shape and size.

  • PDF

Optimal location of overwork-allowed facilities subject to choice of various equipment modes

  • Kwon, Min-Kyu;Sung, Chang-Sup
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.11a
    • /
    • pp.332-335
    • /
    • 2006
  • This paper considers a facility location problem, which is concerned with locating facilities on a supply chain network and installing the associated equipments at the facilities to meet a given set of demands. The objective function is to minimize the sum of setup cost (facility opening cost and equipment installation cost), operation cost, and distribution cost. For the equipments, various choices of equipment modes need to be determined. Moreover, in the problem, overwork is allowed each facility but at expensive operation cost. The proposed problem is characterized as being NP-hard problem, so that a heuristic algorithm is derived. In order to evaluate the performance of the proposed algorithm, computational experiments with various numerical instances are conducted.

  • PDF