• 제목/요약/키워드: Required

검색결과 49,102건 처리시간 0.071초

게이트밸브의 성능평가를 위한 실험적 연구 (Experimental Study for Performance Evaluation of Gate Valve)

  • 조택동;양상민
    • 대한기계학회논문집B
    • /
    • 제31권10호
    • /
    • pp.884-888
    • /
    • 2007
  • It is necessary to evaluate periodically the performance of the AOV(air-operated valve) which is used for controlling flow and pressure in nuclear power plant. The required thrust for actuating valve and available thrust of actuator are calculated with conditions of flow through a valve in this study and operating performance is analyzed through comparing two thrusts. In general, differential pressure is increased according to increase the flow rate and differential pressure affects the required thrust of valve. We found the fact that it is possible not to close the valve perfectly because required thrust becomes bigger than available thrust of actuator.

각형강관을 이용한 슬림플로어 시스템의 층고절감효과 비교 (Comparing floor height reduction effect of slim floor system with square steel pipe)

  • 조윤진;임홍철;김대유;류승일;김도균
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.56-57
    • /
    • 2017
  • In recent years, new construction methods have been required to reduce the construction cost and increase the available area in an environment where construction work is frequently performed in a narrow urban area like Korea. As a result of these studies, slim floor composite beam has been suggested. Slim floor composite beam can reduce required depth because web of steel beam is embedded in the slab, so it is effective to reduce floor height and increase the available area. The purpose of this study is the floor height reduction evaluation by comparing system consisting of reinforced concrete, steel, and slim floor using square-shape steel pipe. After doing structural design for a typical plan, checked effectiveness by comparing each design plan. It is proven that slim floor composite beam can reduce required depth effectively comparing required materials of other system.

  • PDF

틸트로터 무인기의 요구능력 효과도 분석 (Effectiveness Analysis for Required Capabilities of Tilt-rotor UAV)

  • 이기영
    • 한국항공운항학회지
    • /
    • 제21권2호
    • /
    • pp.15-20
    • /
    • 2013
  • In order to set up the optimal required capabilities to satisfy a variety of domestic and foreign demands for the Tilt-rotor UAV, MOE(Measure of Effectiveness) hierarchy was designed through an expert discussion, and the weight of the MOE was determined by utilizing AHP method. The independent MOE assessment on the required capabilities was accomplished for the current configuration, available alternatives and foreign competitive UAVs. Finally the cost-effectiveness for the alternative and competition UAV was analyzed.

육상교통 항법을 위한 네트워크기반 위성항법보정 시스템의 구성 (Configuration of Network Based GNSS Correction System for Land Transportation Navigation)

  • 손민혁;손은성;이은성;허문범;남기욱
    • 한국항공운항학회지
    • /
    • 제21권4호
    • /
    • pp.17-26
    • /
    • 2013
  • In this paper, a configuration procedure of a transportation infrastructure system for GNSS based very precise real-time positioning is proposed. This infrastructure system consists of several receiving station, a central station, and communication sub-systems. The required performance, design, implementation and verification of each sub-system are explained respectively. The required performance can be broken down into accuracy, integrity, stability, processing time. The design of the each sub-system is performed in accordance with the required performance and each sub-system is built with regard to the design. Lastly the implemented system is verified in comparison with the required performance.

CDMA 이동통신시스템에서 멀티미디어 트래픽의 요구 신호 전력 특성 (Characteristics of the Required Signal Power for Multimedia Traffic in CDMA Systems)

  • 강창순
    • 한국통신학회논문지
    • /
    • 제27권6B호
    • /
    • pp.593-600
    • /
    • 2002
  • The reverse link signal power required for multimedia traffic in multipath faded single-code (SC-) and multi-code CDMA (MC-CDMA) systems is investigated. The effect of orthogonality loss among multiple spreading code channels is herein characterized by the orthogonality factor. The required signal power in both the CDMA systems is then analyzed in terms of the relative required signal power ratio of data to voice traffic. The effect of varying system parameters including spreading bandwidth, the of orthogonality factor, and the number of spreading codes are examined. Analytical results show that MC-CDMA users transmitting only a single traffic type require significantly more power than SC-CDMA users with only a single traffic type. On the other hand, MC-CDMA users transmitting multimedia traffic require power levels approximately identical to SC-CDMA users with multimedia traffic. The results can be used in the design of radio resource management (e.g., power allocation) scheme for wireless multimedia services.

Design of initial support required for excavation of underground cavern and shaft from numerical analysis

  • Oh, Joung;Moon, Taehyun;Canbulat, Ismet;Moon, Joon-Shik
    • Geomechanics and Engineering
    • /
    • 제17권6호
    • /
    • pp.573-581
    • /
    • 2019
  • Excavation of underground cavern and shaft was proposed for the construction of a ventilation facility in an urban area. A shaft connects the street-level air plenum to an underground cavern, which extends down approximately 46 m below the street surface. At the project site, the rock mass was relatively strong and well-defined joint sets were present. A kinematic block stability analysis was first performed to estimate the required reinforcement system. Then a 3-D discontinuum numerical analysis was conducted to evaluate the capacity of the initial support and the overall stability of the required excavation, followed by a 3-D continuum numerical analysis to complement the calculated result. This paper illustrates the application of detailed numerical analyses to the design of the required initial support system for the stability of underground hard rock mining at a relatively shallow depth.

Required ties in continuous RC beams to resist progressive collapse by catenary action

  • Alrudaini, Thaer M.S.
    • Structural Engineering and Mechanics
    • /
    • 제78권4호
    • /
    • pp.403-411
    • /
    • 2021
  • Ties are mandated by many design guidelines and codes to prevent the progressive collapse of buildings initiated by local failures. This study develops a model to estimate catenary/cable action capacity and the required ties in continuous reinforced concrete beams to bridge above the potential failed interior columns. The developed model is derived based on virtual work method and verified using test results presented in the literature. Also, parametric investigations are conducted to estimate the required ties in continuous reinforced concrete beams supporting one-way slab systems. A comparison is conducted between the estimated tie reinforcement using the developed model and that provided by satisfying the integrity provisions of the ACI 318-14 (2014) code. It is shown that the required tie reinforcements to prevent progressive collapse using the developed model are obviously larger than that provided by the integrity requirements of the ACI 318-14 (2014) code. It has been demonstrated that the increases in the demanded tie reinforcements over that provided by satisfying ACI 318-14 (2014) integrity provisions are varied between 1.01 and 1.46.

Estimating the Physical Demand of Waterproofing Worker

  • Lim, Tae-Kyung;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.101-103
    • /
    • 2015
  • Scientific methods that measure the physical demand requirements of a construction operation have not been arrived at maturity in construction community. It is attributed to the difficulty involved in performing controlled experiments on the operation and its' volatile jobsite environment. This paper presents a method that measures the physical demand requirement of the waterproofing activity and verifies the differences between various operations (e.g., a primer painting and a polyurethane coating) consisting of the activity. Two hypotheses, which are involved in the operations, are summarized as follows: [Hypothesis 1] when one performs the same amount of work; the one's average heart rate required for the polyurethane coating operation is higher than that required for the primer painting operation. [Hypothesis 2] when one performs the same amount of work, the one's break time required for the polyurethane coating operation is longer than that required for the primer painting operation.

  • PDF

Cost Normalization Procedure for Phase-Based Performance Measurement

  • Choi, Jiyong;Yun, Sungmin;Oliveira, Daniel;Mulva, Stephen;Kang, Youngcheol
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.72-76
    • /
    • 2015
  • Capital project benchmarking requires an effective cost normalization process to compare cost performance of projects accomplished in different time and location. Existing cost normalization approaches have been established based on the assumption that all required information for cost normalization is fully identified once a project is completed. Cost normalization, however, is sometimes required to evaluate phase-level outcomes of an ongoing project where the required information is not fully available. This paper aims to provide a cost normalization procedure for phase-based performance assessment. The procedure consists of three normalization steps: currency conversion, location adjustment, and time adjustment considering various scenarios where the required information is not fully identified. This paper also presents how the cost normalization procedure has been applied to the 10-10 Performance Assessment Program, which is a phase-based performance assessment system developed by the Construction Industry Institute (CII). Both researchers and industrial professionals can apply the cost normalization procedure to studies and practices regarding to cost estimation, feasibility analysis, and performance assessment.

  • PDF

가압가스 온도에 따른 극저온 추진제탱크 가압가스 요구량 (Required Pressurant Mass for Cryogenic Propellant Tank with Pressurant Temperature Variation)

  • 권오성;김병훈;조인현;고영성
    • 한국항공우주학회지
    • /
    • 제38권12호
    • /
    • pp.1202-1208
    • /
    • 2010
  • 추진제가 배출되는 동안 발사체 추진제탱크의 압력을 유지하기 위해 필요한 가압가스의 요구량을 예측하는 것은 가압시스템의 설계를 위해 반드시 필요하다. 추진제탱크로 유입되는 가압가스의 온도는 가압가스의 요구량에 가장 큰 영향을 미치는 요소로서, 저장탱크의 무게, 열교환기의 크기 등 가압시스템의 개발에 있어 중요한 설계기준이 된다. 이에 극저온 추진제탱크 내에 저장된 추진제를 가압하여 배출하는 실험을 수행하였고, 가압가스 온도 조건에 따른 가압가스 요구량과 얼리지 온도분포를 측정하였다. 그 결과 가압가스의 온도가 높을수록 요구량 자체는 감소하였지만, 이상적인 가압가스 요구량 대비 실제 필요량의 비율은 증가하였다.