• Title/Summary/Keyword: Repair process

Search Result 706, Processing Time 0.028 seconds

The Application of Narrow-Gap Welding Process for SA 106 Gr.C in Nuclear Power Plant (원전 배관용 SA 106 Gr.C의 협개자동용접 적용에 관한 연구)

  • Woo, Seung-Wan;Kwon, Jae-Do;Lee, Choon-Yeol;Kang, Suk-Chull;Shin, Ho-Sang
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.96-101
    • /
    • 2004
  • Conventionally, SMAW process was applied to join pipes of RCL, which caused lot of loss in time and cost due to excessive heat input and defects in joining section. Recently, narrow-gap welding(NGW) process was introduced to overcome the disadvantages of SMAW. However, the application of NGW to nuclear power plant is not yet common because safety of NGW process is not proven. In present paper, the welded coupons are made of carbon steel. They are manufactured under different processes; general welding(GW), post-weld heat treatment(PWHT) after GW, repair welding after GW and PWHT with repair welding after GW in carbon steel. Performed are various mechanical tests investigation of microstructure, hardness test, tensile test at room and high temperature, bending test, impact test and J-R test. It is verified that the mechanical properties of carbon steel are greatly changed after repair welding process due to applied heat flux, and that the effect of PWHT is beneficial.

  • PDF

A Bayesian Inference for Power Law Process with a Single Change Point

  • Kim, Kiwoong;Inkwon Yeo;Sinsup Cho;Kim, Jae-Joo
    • International Journal of Quality Innovation
    • /
    • v.5 no.1
    • /
    • pp.1-9
    • /
    • 2004
  • The nonhomogeneous poisson process (NHPP) is often used to model repairable systems that are subject to a minimal repair strategy, with negligible repair times. In this situation, the system can be characterized by its intensity function. There have been many NHPP models according to intensity functions. However, the intensity function of system in use can be changed because of repair or its aging. We consider the single change point model as the modification of the power law process. The shape parameter of its intensity function is changed before and after the change point. We detect the presence of the change point using Bayesian methodology. Some numerical results are also presented.

Three extended geometric process models for modeling reliability deterioration and improvement

  • Jiang, R.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.1
    • /
    • pp.49-60
    • /
    • 2011
  • The geometric process (GP) has been widely used for modeling failure and repair time sequences of repairable systems. The GP is mathematically tractable but restrictive in reliability applications since it actually assumes that the mean function of inter-failure times sequence asymptotically decreases to zero; and the mean function of successive repair times sequence asymptotically increases to infinity. This is generally unrealistic from an engineering perspective. This paper presents three extended GP models for modeling reliability deterioration and improvement (or growth) process. The extensions maintain the advantage of mathematical tractability of GP model. Their usefulness and appropriateness are illustrated with three real-world examples.

  • PDF

Repair work of Sasungjeon, one of the main building of Jangansa temple, and an attempt to transform the repair system of historic architecture in 1940s (금강산 장안사 사성전 보존 수리공사와 1940년대 수리체제 전환 시도)

  • Seo, Hyowon
    • Journal of architectural history
    • /
    • v.29 no.4
    • /
    • pp.7-16
    • /
    • 2020
  • The purpose of this study is to reveal the development process of modern repair systems in the Korean peninsula. Sasungjeon, one of the main buildings of Jangansa temple located in Geumgangsan, was repaired from 1941 to 1944. It was the very last restoration work of historic wooden architecture performed during the Japanese colonial era. This work was delayed multiple times because of insufficient materials and human resources. The Bureau of Education(學務局), which was in charge of repair work, understood that the problems of the repair system and suggested reorganizing the system as a solution. This study examined the repair work of Sasungjeon as a background of the bureau's suggestion and considered this suggestion as an attempt to transform the repair system.

Reliability analysis of a complex system, attended by two repairmen with vacation under marked process with the application of copula

  • Tiwari, N.;Singh, S.B.;Ram, M.
    • International Journal of Reliability and Applications
    • /
    • v.11 no.2
    • /
    • pp.107-122
    • /
    • 2010
  • This paper deals with the reliability analysis of a complex system, which consists of two subsystems A and B connected in series. Subsystem A has only one unit and B has two units $B_1$ and $B_2$. Marked process has been applied to model the complex system. Present reliability model incorporated two repairmen: supervisor and novice to repair the failed units. Supervisor is always there and the novice remains in vacation and is called for repair as per demand. The repair rates for supervisor and novice follow general and exponential distributions respectively and the failure time for both the subsystems follows exponential distribution. The model is analyzed under "Head of line repair discipline". By employing supplementary variable technique, Laplace transformation and Gumbel-Hougaard family of copula various transition state probabilities, reliability, availability and cost analysis have been obtained along with the steady state behaviour of the system. At the end some special cases of the system have been taken.

  • PDF

THE EFFECT OF TYPES OF ORTHODONTIC FORCE ON THE ROOT RESORPTION AND REPAIR IN RAT MOLAR (교정력 양상이 백서의 치근 흡수와 회복에 미치는 효과)

  • Jang, Dong-Soo;Son, Woo-Sung
    • The korean journal of orthodontics
    • /
    • v.24 no.3 s.46
    • /
    • pp.631-648
    • /
    • 1994
  • The purpose of this study was to investigate the effects of different types of orthodontic force on the root resorption and repair in rat molar. 77 rats were divided into three groups; The control group was not equiped with orthodontic appliance between incisor and first molar. The experimental group was subdivided into closed coil spring subgroup and elastic chain subgroup by the application methods of orthodontic force. Initial orthodontic force between incisor and first molar was 100g. Experimental period was 8 weeks; for 4 weeks the appliance was acting and for another 4 weeks, removed. Root resorption and repair in the root of first molar was examined by light microscope for histologic changes and by inductively coupled plasma spectroscopy(ICP) for quantitative changes. The results were as follows: 1. In the closed coil spring subgroup odontoclasts and root resolution were appeared one week earlier. 2. One week after orthodontic force was eliminated the repair response in the resorptive lacuna was seen in both subgroups. Delayed resorption was seen on the periphery of resorptive lacunae whereas reparative response was seen in the center of lacunae. A new resorption was seen one week after orthodontic force was eliminated. Root contour was partially restored by repairing of resorbed root. 3. The weight ratios of calcium and phosphorous to the sample were decreased during resorptive process but increased during repair process in both the orthodontic groups, but not more than the control group. 4. By different types of orthodontic force (closed coil spring or elastic chain) resorption process was affected but repair process was not.

  • PDF

DNA Repair Enhancement by Radioprotective Ginseng Protein Fraction (항 방사선 인삼단백분획의 DNA수복능력 증진효과)

  • Kim, Choon-Mi;Choi, Mi-Kyung
    • YAKHAK HOEJI
    • /
    • v.36 no.5
    • /
    • pp.449-454
    • /
    • 1992
  • The effect of radioprotective ginseng protein fraction on DNA repair capacity was determined by measuring the amount of $^{3}H-thymidine$ incorporated into DNA in the process of repair synthesis for UV damaged DNA. CHO-Kl cells were prepared whose semiconservative replication was inhibited by trimethylpsoralen plus near-UV(PUVA) treatment. When the cells were exposed to UV light alone, the DNA repair capacity was increased at first and then decreased as UV dose increased. However, when the ginseng fraction was treated to the cells, the DNA repair capacity was kept increasing regardless of UV dose increment. When the concentration of protein contained in the added fraction was increased gradually, the repair capacity was also increased almost linearly showing dose-response relationship of the effect. These results suggest that the enhancement of DNA repair capacity of the cell can be one of the mechanisms of radioprotection by the ginseng fraction.

  • PDF

A Study on the Completion procedure of Defect Repair for Apartment Housing (공동주택의 하자보수 종료 절차에 관한 연구)

  • Jun Woo-Taek;Nam Gyoung-Woo;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.283-286
    • /
    • 2002
  • Defect problems happening in the course of stressing quantity expansion of residence supply due to lark in maintenance are intensifying insincerity of construction business resulting from the psychological and economic damage, and there are many quarrel between residence suppliers and consumers. Because an apartment house's qualify is decided by various elements from design, to lotting-out, construction, and after-management, it is limited to express house capacity and standard to appraise defect objectively and quantifiably. The bound of defect and the period of guarantee expressed cleary in regulation of apartment house lack in quantifiable concept, and guarantee of defect is composed of a general concept. Therefore the big difference in opinion about defect and the bound of repair makes repair process slow and only to increase social costs. This research will give residence suppliers and consumers a resonable way to solve repair process during tile obliged period of guarantee since moving into from a process which are design, planing, construction, and after management. Furthermore it will present each business and role to conclude defect repair easily, so I planed to promote maintenance after conclusion of defect repair.

  • PDF

RRAM (Redundant Random Access Memory) Spare Allocation in Semiconductor Manufacturing for Yield Improvement (수율향상을 위한 반도체 공정에서의 RRAM (Redundant Random Access Memory) Spare Allocation)

  • Han, Young-Shin
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.4
    • /
    • pp.59-66
    • /
    • 2009
  • This has been possible by integration techniques such as very large scale integration (VLSI) and wafer scale integration (WSI). Redundancy has been extensively used for manufacturing memory chips and to provide repair of these devices in the presence of faulty cells. If there are too many defects, the momory has to be rejected. But if there are a few defects, it will be more efficient and cost reducing for the company to use it by repairing. Therefore, laser-repair process is nedded for such a reason and redundancy analysis is needed to establish correct target of laser-repair process. The proposed CRA (Correlation Repair Algorithm) simulation, beyond the idea of the conventional redundancy analysis algorithm, aims at reducing the time spent in the process and strengthening cost competitiveness by performing redundancy analysis after simulating each case of defect.

A Genetic Algorithm with a New Repair Process for Solving Multi-stage, Multi-machine, Multi-product Scheduling Problems

  • Pongcharoen, Pupong;Khadwilard, Aphirak;Hicks, Christian
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.3
    • /
    • pp.204-213
    • /
    • 2008
  • Companies that produce capital goods need to schedule the production of products that have complex product structures with components that require many operations on different machines. A feasible schedule must satisfy operation and assembly precedence constraints. It is also important to avoid deadlock situations. In this paper a Genetic Algorithm (GA) has been developed that includes a new repair process that rectifies infeasible schedules that are produced during the evolution process. The algorithm was designed to minimise the combination of earliness and tardiness penalties and took into account finite capacity constraints. Three different sized problems were obtained from a collaborating capital goods company. A design of experimental approach was used to systematically identify that the best genetic operators and GA parameters for each size of problem.