• Title/Summary/Keyword: Repair Rate

Search Result 762, Processing Time 0.027 seconds

A Repair-Time Limit Replacement Model with Imperfect Repair (불완전 수리에서의 수리시간한계를 가진 교체모형)

  • Chung, Il Han;Yun, Won Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.4
    • /
    • pp.233-238
    • /
    • 2013
  • This article concerns a profit model in a repair limit replacement problem with imperfect repair. If a system fails, we should decide whether we repair the failed system (repair option) or replace it by new one (replacement option with a lead time). We assume that repair times are random variables and can be estimated before repair with estimation error. If the estimated repair time is less than the specified limit (repair time limit), the failed unit is repaired but the unit after repair is different from the new one (imperfect repair). Otherwise, we order a new unit to replace the failed unit. The long run average profit (expected profit rate) is used as an optimization criterion and the optimal repair time limit maximizes the expected profit rate. Some special cases are derived.

A Preliminary Study on the Prediction of School Facilities Repair Frequency and Rate (학교시설 수선주기 및 수선율 예측에 관한 기초적 연구)

  • Jung, Young-Han;Lee, Jae-Sung;Cho, Bong-Ho
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.9 no.2
    • /
    • pp.1-8
    • /
    • 2010
  • This study is to present an engineering solution for the repair frequency and repair rates of a building. The existing data for the repair frequency and repair rates are used to draw the probability distribution for the generalized repair frequency and repair rate in a building. The suggested methodology can be widely used for most buildings to estimate the legal repair frequency and repair rates. Also, the methodology can be applied to resolve the risks on the maintenance costs in LC (Life Cycle) plans or LCC (Life Cycle Cost) analysis. As the future studies, there are the multiple regression analysis including the parameters on incurred costs and the decision methods on efficient repair and replacement.

A Study on Standard Repair Periods, Repair Rates of School Facilities for Revitalizing of the School BTL Project (학교 BTL사업의 활성화를 위한 학교시설의 수선주기와 수선율 및 내용연수 산정에 관한 연구 -서울시내 초·중·고등학교를 중심으로-)

  • Ha, Ho-Sung
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.6 no.1
    • /
    • pp.60-84
    • /
    • 2007
  • This study purpose is seeing that the independent standard sufficiently reflecting the characteristics of the school facility as the basic material needed to calculate the maintenance and repair expenses is needed to make a more realistic and valid qualitative VFM analysis of the school BTL project. this study attempted to develop the standard for the repair cycle and rate and economic year of the school facility. The quantitative VFM analysis should be conducted based on the repair cycle and repair rate proper to the school facility, not the residential space, when calculating the maintenance and repair expenses of the operating expenses of the school facility. An attempt was made to calculate the repair cycle, repair rate and economic life of 114 component materials of the school facility judged to be able to explain the school field best. And it was confirmed that the repair and maintenance expenses more is needed to be set by about 35% than the existing maintenance and repair expenses.

  • PDF

Replacement model under warranty with age-dependent minimal repair

  • Park, Minjae
    • International Journal of Reliability and Applications
    • /
    • v.18 no.1
    • /
    • pp.9-20
    • /
    • 2017
  • In this paper, we consider a renewable repair-replacement warranty strategy with age-dependent minimal repair service and propose an optimal maintenance model during post-warranty period. Such model implements the repair time limit under warranty and follows with a certain form of system maintenance strategy when the warranty expires. The expected cost rate is investigated per unit time during the life period of the system as for the standard for optimality. Based on the cost design defined for each failure of the system, the expected cost rate is derived during the life period of the system, considering that a renewable minimal repair-replacement warranty strategy with the repair time limit is provided to the customer under warranty. When the warranty is finished, the maintenance of the system is the customer's responsibility. The life period of the system is defined and the expected cost rate is developed from the viewpoint of the customer's perspective. We obtain the optimal maintenance strategy during the maintenance period by minimizing such a cost rate after a warranty expires. Numerical examples using field data are shown to exemplify the application of the methodologies proposed in this paper.

  • PDF

A Study on the Reliability of Superconducting Fault Current Limiter and Adjacent Distribution Equipments (초전도한류기와 인근 배전설비의 신뢰도에 관한 연구)

  • Bae, In-Su;Kim, Sung-Yul;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.11
    • /
    • pp.2122-2127
    • /
    • 2009
  • This study presents the failure rate and repair rate of Superconducting Fault Current Limiter(SFCL) and adjacent distribution equipments. When the fault current penetrated SFCL, the supply of electric power to the customers can be partly continued. It is expected that SFCL makes to improve the reliability index of customers. Contrary to the expectations, the series connection between SFCL and distribution system could deteriorate the reliability index. To evaluate the reliability index in the distribution system including SFCL, the failure rate and repair rate of SFCL are required as well as that of distribution equipments. Also, the insertion of SFCL makes to change the failure rate and repair rate of adjacent equipments. This study proposes a method to calculate the failure rate and repair rate of a component combining SFCL and adjacent equipments.

Optimal replacement strategy under repair warranty with age-dependent minimal repair cost

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.2
    • /
    • pp.117-122
    • /
    • 2011
  • In this paper, we suggest the optimal replacement policy following the expiration of repair warranty when the cost of minimal repair depends on the age of system. To do so, we first explain the replacement model under repair warranty. And then the optimal replacement policy following the expiration of repair warranty is discussed from the user's point of view. The criterion used to determine the optimality of the replacement model is the expected cost rate per unit time, which is obtained from the expected cycle length and the expected total cost for our replacement model. The numerical examples are given for illustrative purpose.

  • PDF

Repair Rate of Composite Resin Restorations in Permanent First Molar in Children Under 12 Years Old (12세 이하 아동의 제1대구치 복합레진 수복의 재수복률에 관한 연구)

  • Jeong, Yunyeong;Nam, Okhyung;Kim, Misun;Lee, Hyo-seol;Choi, Sungchul
    • Journal of the korean academy of Pediatric Dentistry
    • /
    • v.45 no.3
    • /
    • pp.370-377
    • /
    • 2018
  • Although the frequency of composite resin restoration in children is gradually increasing, there are insufficient researches about the rate of composite resin repair in children. The purpose of this study was to evaluate the repair rate of composite resin restorations in the permanent first molar in children under 12 years old. This study retrospectively analyzed 169 children treated with composite resin restoration in the permanent first molar from May 2014 to April 2015. According to the location of the tooth, the repair rate was higher in the mandible than maxilla and in the left than right. In the classification of restoration, the repair rate was the highest in the class II cavity, and the repair rate was the lowest in the restoration of the occlusal surface only. Repair rate in two years was 14.8%, and repair hazard ratio decreased with age. The most common reason of composite resin restoration replacement was the secondary caries (74.1%). Within the limits of study, the repair rate of children was higher than that of adult due to the characteristics of children. Therefore, dentists should understand these characteristics and try to reduce the repair rate of composite resin composite restorations.

A Comparative Study of Surgical Treatment in the Ruptured Achilles Tendon: Minimal incision and Open repair (아킬레스건 파열의 수술적 치료 비교: 최소 절개 봉합술과 관혈적 봉합술)

  • Kong, Gyu-Min;Gwak, Heui-Chul;Kim, Jeon-Gyo
    • Journal of Korean Foot and Ankle Society
    • /
    • v.16 no.3
    • /
    • pp.181-189
    • /
    • 2012
  • Purpose: The purpose of this study was to compare and analyse the clinical outcomes of minimal incision repair and open repair in ruptured Achilles tendon. Materials and Methods: We retrospectively analyzed the outcomes of 10 patients with minimal incision repair (group 1) and 19 patients with open repair (group 2) from February 2007 to June 2011. The postoperative clinical evaluations were done by Arner-Lindholm scale, AOFAS score, overall patient's satisfaction and cosmetic satisfaction of scar. Results: There was no statistical difference between two groups in Arner-Lindholm scale, AOFAS score, overall patient's satisfaction (p=1.21, 0.87, 1.07). There was statistically high rate of cosmetic satisfaction in group 1(p<0.001). There were no complications in group 1. Complications occurred in three patients (deep infection, rerupture, deep vein thrombosis) of group 2. Conclusion: Treatment of minimal incision repair in Achilles's tendon ruptures showed high rate of cosmetic satisfaction and low rate of complication's, but there were no significant differences with open repair in other clinical outcomes. The minimal incision repair could be recommended as one of the effective treatment for the Achilles's tendon ruptures.

An Empirical Study on the Repair Rate of Domestic Gas Boiler within Warranty Period(I) (가정용(家庭用) 가스 보일러의 보증기간내(保證期間內) 수리율(修理率)에 관(關)한 실증적(實證的) 연구(硏究)(I))

  • Han, Jae-Hoon;Kim, Bong-Sun
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.1
    • /
    • pp.139-146
    • /
    • 2014
  • As Crosby notes, the most companies spend 15 to 20% of their sales dollars on quality costs. Generally the most effective way to manage quality costs is to avoid having defects in the first place. In this paper we have studied about the repair(service) problem of domestic gas boiler within warranty period. We develop a system, which man could find the cause of the problem at an early stage and could devise a countermove to the problem under supposing that the service(repair) rate follows exponential distribution and the product is manufactured lot-for-lot continually. Using the developed early sensing system. it is expected to improve the reliability of the product, to save expenses of company and to improve customer's satisfaction. And the system will be expended to incorporate information technology, which can detect the repair rate automatically.

Evaluation of Performance on Repair Materials for Creek Concrete Structures (콘크리트 복개구조물용 보수재료의 성능 평가)

  • Lee, Chang-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.1
    • /
    • pp.205-212
    • /
    • 2002
  • The deterioration rate of concrete structures in urban area is accelerated due to rapid urbanization and environmental pollution. Repair materials and methods newly introduced in Korea should be investigated whether they are appropriate for the urban environment in Korea. The creek concrete structures are exposed in severe environmental condition than others. Based on these background in mind, the study is focused on evaluation of performance on repair materials used to rehabilitate creek concrete structures. To evaluate the performance of repair materials, four kinds of repair materials were selected based on polymer emulsion. This experimental study was conducted on fundamental performance such as setting time, compressive strength, bending strength, bonding strength, thermal expansion coefficient, and durability performance such as chloride diffusion, carbonation, chemical attack, and steel corrosion rate. On the basis of this study, the optimal repair material which is proper to the environment condition can be selected and service life of creek concrete structures can be extended. As a result, the life cycle cost can be reduced and the waste of material resources will be cut down.