• Title/Summary/Keyword: Remote power management

Search Result 182, Processing Time 0.026 seconds

A Study on the Design of Advanced Digital Kwh-Meter for the Remote Management of Distribution System (배전원격관리를 위한 차세대 디지털 적산전력계 설계)

  • Ko, Yun-Seok;Lim, Chul-Sy;Lee, Kwan-Ho;Yun, Sang-Moon;Seo, Seong-Jin
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.238-240
    • /
    • 2002
  • This paper proposes an advanced digital kwh-meter, which records voltage management data, load management data as well as the existing kwh data. This meter supports the requests from DRMS (Distribution Remote Management System) which include kwh meter reading, voltage management data reading, and load management data reading request, it can enhance greatly the economics of the existing remote meter reading system. Also it can improve highly the quality of power supplied to the electric customer by minimizing the voltage management cost and by enhancing the efficiency of load management.

  • PDF

Development of Automatic Water Level Measurement System for the Irrigation Reservoir - Study on Low Power and Remote Controlled Water Level Measurement System - (농업저수지 자동 수위관측기 개발 - 저전력 원격제어 수위관측기 중심 -)

  • Kim, Jin-Taek;Joo, Uk-Jong;Choi, Seung-Chul
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.491-494
    • /
    • 2003
  • An Automatic Water Level Measurement System has been developed in this study. It has the characteristics that it use lower power and solar power and it has the ability of sending data and remote-controlled by wireless MODEM this system was set up in the experimental site and was tested. Also, the management system for the water level data has been developed and will be used by instruments administrating reservoirs.

  • PDF

Design of DRMS(Distribution Remote Management System) Based on Advanced Digital Kwh-Meter (차세대 디지털 적산전력계에 기반한 배전원격관리 시스템 설계)

  • Ko, Yun-Seok;Lee, Kyung-Ho;Yun, Sang-Moon;Seo, Seong-Jin;Lim, Chul-Su;Kim, Yun-Jib
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.241-243
    • /
    • 2002
  • This paper proposes a DRMS(Distribution Remote Management System) based on the advanced digital kwh-meter. The proposed URMS is designed so as to be able to collect the voltage management data, the load management data as well as the used kwh data from advanced kwh-meter remotelly. It makes the integrated management of distribution system possible and enhances highly the economics of the existing remote meter-reading system based on the only used kwh-data. Also it can improve highly the quality of power supplied to the electric customer by minimizing the volt age management cost and by enhancing the efficiency of load management.

  • PDF

An Integrated Emergency Call System based on Public Switched Telephone Network for Elevators

  • Lee, Guisun;Ryu, Hyunmi;Park, Sunggon;Cho, Sungguk;Jeon, Byungkook
    • International journal of advanced smart convergence
    • /
    • v.8 no.3
    • /
    • pp.69-77
    • /
    • 2019
  • Today, most of elevators have an emergency call facility for emergency situations. However, if the network installed in the elevator is also out of power, it cannot be used for the elevator remote monitoring and management. So, we develop an integrated and unified emergency call system, which can transmit not only telephone call but also data signals using PSTN(Public Switched Telephone Network) in order to remote monitoring and management of elevators, even though a power outage occurs. The proposed integrated emergency call system to process multiple data such as voice and operational information is a multi-channel board system which is composed of an emergency phone signal processing module and an operational information processing module in the control box of elevator. In addition, the RMS(remote management server) systems based on the Web consist of a dial-up server and a remote monitoring server where manages the elevator's operating information, status records, and operational faults received via the proposed integrated and unified emergency call system in real time. So even if there's a catastrophic emergency, the proposed RMS systems shall ensure and maintain the safety of passengers inside the elevator. Also, remote control of the elevator by this system should be more efficient and secure. In near future, all elevator emergency call system need to support multifunctional capabilities to transmit operational data as well as phone calls for the safety of passengers. In addition, for safer elevators, it is necessary to improve them more efficiently by combining them with high-tech technologies such as the Internet of Things and artificial intelligence.

Development of ADWHM(Advanced Digital Watt-Hour Meter) for Remote Management of Distribution Systems (배전원격관리를 위한 차세대 디지털 적산전력계 개발)

  • 고윤석;윤상문;서성진;강태규
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.6
    • /
    • pp.316-323
    • /
    • 2004
  • This paper develops an ADWHM(Advanced Digital Watt-Hour Meter) which integrates and implements the voltage management data record function and the load management data record function in the electronic watt-hour meter. ADWHM is developed based on PIC16F874 which is 8bit micro-controller of RISK type for the easy of programing and maintenance, and electronic power signal processing module is located at front of it to reduce the computing load of processor. Also, a 16kbyte EEPROM is used to record the voltage management data and load management data for a week as well as watt-hour data and USART communication mode is used to transfer data from ADWHM to PC. The accuracy of the voltage and unt measuring for ADWHM is verified by identifying the LCD display values of the ADWHM after the voltage signals of id levels from digital function generator is applied to PT(Potential Transformer) and CT(Current Transformer) output under state which it is separated from real power line. On the its basic functions such as watt-hour data recording function, voltage management data recording function and load management data recording function was verified by showing data for three days among the collected data to PC by RS232C communication from ADWHM which was connected to real power lines for a week.

Design and Implementation of Optimal Control Algorithms for Building Energy Management (빌딩 에너지 관리 최적화 알고리즘 설계 및 구현)

  • Jin Jung-Hwa;Chung Sun-Tae
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.16 no.10
    • /
    • pp.969-976
    • /
    • 2004
  • Building energy saving is one of the most important issues in these days. Energy saving control strategies should be developed properly to achieve the saving. One of such area we could apply is the HVAC (Heating, Ventilation and Air-Conditioning) system. Through the optimal control algorithm for building energy management system (EMS), you can not only save the cost of building energy, but also protect HVAC system components against the unexpected condition. In order to verify the effectiveness of building energy saving, field test was accomplished for several months at 'A' building. And to get the measured data, remote control was used. If the remote control is used in BAS (Building Automation System), control and monitoring can be done for all of the building systems, such as HVAC, power, lighting, security and fire-alarm etc. anywhere any time. Using the remote control, Control and monitoring is possible for the testing system without going there. As the results of field test, we could reduce $5{\sim}10\%$ of the building energy cost.

Remote On-line Determination of the Load Rate Limit of Generation in AGC (AGC 운용에 있어서의 원격 On-line 최대 증감발율 취득 기법)

  • Kwon, Soon-Man;Jeon, Dong-Hoon;Moon, Won-Yong;Kim, Suk-Joo
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.119-121
    • /
    • 2000
  • The possibility of a remote on-line determination of the maximum load rates that are basically set at generation plants is investigated in automatic generation control (AGC) system. Energy management system (EMS) generates a test input to a remote power plant to get the samples of the generator output. Then from the samples it can be attempted to determine an approximate value of the load rate limit set by the operator. It is shown in computer simulation that in actual power plants the limit can be approximately determined from the input-output characteristics of the plants for a unit-step input.

  • PDF

Implementation of Control System for Remote Load using Power line Communication (전력선 통신을 이용한 원격 부하제어 시스템의 구축)

  • Kim Ho;Lee Won-Sun;Jeon Hee-Jong;Park Jong-chan
    • Proceedings of the KIPE Conference
    • /
    • 2002.07a
    • /
    • pp.685-688
    • /
    • 2002
  • This paper deals with new scheme of remote load control management system with communication from RCU to controller using power line Power line communication is useful for economical data link but various problems and limitations are caused in using power lines for communications channel. A power line is not so good in the commercial electrical power, and its load noise and high frequency noise are so much. To decrease these noise, we used the FSK(Frequency Shift Keying) modulation method. The experimental results show that the proposed system in this paper is compatible with the conventional system with low cost and the feasibility is very high for new or remodeling plant.

  • PDF

Low-Cost, Low-Power, High-Capacity 3R OEO-Type Reach Extender for a Long-Reach TDMA-PON

  • Kim, Kwang-Ok;Lee, Jie-Hyun;Lee, Sang-Soo;Lee, Jong-Hyun;Jang, Youn-Seon
    • ETRI Journal
    • /
    • v.34 no.3
    • /
    • pp.352-360
    • /
    • 2012
  • This paper proposes a low-cost, low-power, and high-capacity optical-electrical-optical-type reach extender that can provide 3R frame regeneration and remote management to increase the reach and split ratio with no change to a legacy time division multiple access passive optical network. To provide remote management, the extender gathers information regarding optical transceivers and link status per port and then transmits to a service provider using a simple network management protocol agent. The extender can also apply to an Ethernet passive optical network (E-PON) or a gigabit-capable PON (G-PON) by remote control. In a G-PON, in particular, it can provide burst mode signal retiming and burst-to-continuous mode conversion at the upstream path through a G-PON transmission convergence frame adaptor. Our proposed reach extender is based on the quad-port architecture for cost-effective design and can accommodate both the physical reach of 60 km and the 512 split ratios in a G-PON and the physical reach of 80 km and the 256 split ratios in an E-PON.

Implementation of a DCS Terminal Remote Monitoring System using Wire and Wireless Communication (유무선 통신을 이용한 DCS 터미널 원격 감시 시스템 구현)

  • Baek, Yeong-Tae;Lee, Se-Hoon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.12 no.3
    • /
    • pp.267-275
    • /
    • 2007
  • In this paper, we designed and implemented DCS terminal remote monitoring middleware for real-time auditor and management terminal status signal with relay and fuse status at power management room. The middleware consist of four component as event analyzer, event manager, service manager and user interface. We expected economic effects extend relay life-time that pre-detected errors and prevented relay fault.

  • PDF