• Title/Summary/Keyword: Reliability of water supply

Search Result 164, Processing Time 0.028 seconds

Evaluation of Supplying Instream Flow by Operation Rule Curve for Heightening Irrigation Reservoir (이수관리곡선에 의한 증고저수지의 하천유지유량 공급 가능성 평가)

  • Lee, Jae-Nam;Noh, Jae-Kyoung
    • Korean Journal of Agricultural Science
    • /
    • v.37 no.3
    • /
    • pp.481-490
    • /
    • 2010
  • Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water levels will be heightened from EL. 100.1 m to EL. 102.1 m, and total storages from 21.75 $Mm^3$ to 26.67 $Mm^3$. The simulation for reservoir inflow was conducted by DAWAST model. The annual average irrigation water was estimated to 33.19 $Mm^3$ supplied to 2,975 ha and the instream flows could be allocated with 0.14 mm/d from October to April with annual average of 2.52 $Mm^3$. The operation rule curve was drawn using inflow, irrigation, and instream flow requirements data. The reservoir water storage was simulated on a daily basis in case of both normal and withdrawal limit operation. In case of normal operation, the annual average irrigation water supply increased from 31.95 $Mm^3$ to 33.32 $Mm^3$, the instream water supply from 2.40 $Mm^3$ to 2.44 $Mm^3$, the water storages from 15.74 $Mm^3$ to 19.88 $Mm^3$, and the water supply reliability from 77.3 % to 81.6 %. In case of operation with withdrawal limit, the amount of instream water supply was 2.52 $Mm^3$ from reservoir regardless of the condition while the water storage increased from 16.77 $Mm^3$ to 20.65 $Mm^3$. The irrigation water supply capacity was appropriate for the case of normal operation with 2 m heightened condition. The present instream water supply capacity was 35,000 $m^3$/d (6.86 $Mm^3$/y) while 42,000 $m^3$/d (8.36 $Mm^3$/y) in 2 m heightened condition in case of withdrawal limit operation.

A Study of Optimal Operation Policy using Risk Evaluation Criteria(I) (for the Daechung Multi-purpose Reservoir) (위험도 평가기준을 적용한 저수지 최적운영방안 연구(I) (대청댐을 중심으로))

  • Park, Myeong-Gi;Kim, Jae-Han;Jeong, Gwan-Su
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.1
    • /
    • pp.37-49
    • /
    • 2002
  • The application of conventional method for optimizing firm water supply and hydro-electric power generation has some limitation during abnormal or extreme drought periods. Hashimoto et al. (1982) suggested there risk evaluation criteria such as reliability, resilience, and vulnerability. These three criteria have been incorporated into a mixed-integer programming model for evaluating the possible performance of water- supply reservoir (Moy et al., 1986; Srinivasan et al., 1999). However, till now, these kind of researches have been conducted only for water-supply reservoir. Therefore there have been no other study for multi-purpose dam including hydro-electric power generation. This study presents an improved formulation of the previous model for evaluating a multi-purpose reservoir system operation considering water supply and hydro-electric power generation. The modified model was applied to the Daechung multi-purpose reservoir system in the Keum river basin to demonstrate the efficiency of the improved formulation.

A decision-centric impact assessment of operational performance of the Yongdam Dam, South Korea (용담댐 기존운영에 대한 의사결정중심 기후변화 영향 평가)

  • Kim, Daeha;Kim, Eunhee;Lee, Seung Cheol;Kim, Eunji;Shin, June
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.3
    • /
    • pp.205-215
    • /
    • 2022
  • Amidst the global climate crisis, dam operation policies formulated under the stationary climate assumption could lead to unsatisfactory water management. In this work, we assessed status-quo performance of the Yongdam Dam in Korea under various climatic stresses in flood risk reduction and water supply reliability for 2021-2040. To this end, we employed a decision-centric framework equipped with a stochastic weather generator, a conceptual streamflow model, and a machine-learning reservoir operation rule. By imposing 294 climate perturbations to dam release simulations, we found that the current operation rule of the Yongdam dam could redundantly secure water storage, while inefficiently enhancing the supply reliability. On the other hand, flood risks were likely to increase substantially due to rising mean and variability of daily precipitation. Here, we argue that the current operation rules of the Yongdam Dam seem to be overly focused on securing water storage, and thus need to be adjusted to efficiently improve supply reliability and reduce flood risks in downstream areas.

The Economic Impacts of Water Supply Constraints During a Drought Using input-output Analysis (가뭄시 용수공급지장으로 인한 경제적 파급효과 분석)

  • Choe, Jang-Hwan;Heo, Eun-Nyeong;Sim, Myeong-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.5
    • /
    • pp.647-658
    • /
    • 2000
  • The purpose of this study is to estimate the forward impact of water supply bottleneck using a supply-side input-output model. The failure cost analysed in this study can be used to estimate the values of the water supply reliability and can provide the bases of policy decision for the effective reallocation when water supply constraint will occur. So the position of water supply in the national economy is identified, and direct and indirect impacts are estimated by means of the interindustry analysis. Also the failure cost index is suggested to determine the prior order of water supply important in drought. By the way, the occurrence of drought having regional properties, the failure cost of the regional level using a national input-output table may be overestimated or underestimated. For the preceding reason, the failure cost estimated by a national input-output table is compared with and analysed to a regional input-output table for Kyung- Nam.g- Nam.

  • PDF

Water Recources Evaluation using Network Optimization Model (Network Optimization Model을 이용한 수자원 평가)

  • Lee, Gwang-Man;Lee, Jae-Eung;Sim, Sang-Jun;Go, Seok-Gu
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.2
    • /
    • pp.143-152
    • /
    • 1999
  • South-eastern part of Kyungbuk Province is suffering from lack of suitable water development sources due to geographic condition and insufficient water sources condition. In order to find an appropriate solution, extensive studies are carried out such as investigation of new dam sites, regional water supply system, modification of existing water supply system, rehabilitation of old water resources structures and development of off-stream reservoirs. The network optimization model is applied for evaluation of the newly suggested water development alternatives. The results show that if water supply system is constructed until 2011, the reliability of water supply to Pohang and Kyungju region will be more than 95% and the network optimization model can be used to analyse the management of water resources system considering water rights or priority orders.

  • PDF

Water Supply Performance Assessment of Multipurpose Dams Using Sustainability Index (지속가능성지수를 이용한 다목적댐의 용수공급 이행도 평가)

  • Lee, Gwang-Man
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.5
    • /
    • pp.411-420
    • /
    • 2014
  • The water resources sustainability is becoming an important issue in consideration of hydrologic uncertainty by global warming and climate change. This study is to assess the water supply performance for the major multipurpose dams using sustainability index. Parameters, mostly utilized in water resources system assessment, are selected in respect of applicability and flexibility, and those parameters are used as a variable of the composite index. In practice, the composite index including reliability, resiliency, vulnerability and maximum deficit are applied to 15 multipurpose dams and 4 major basins. And to conclude, Daechungdam in the Geum river basin and Imhadam, Hapchondam and Namgangdam in the Nakdong river basin show low sustainability comparing with other dams. The Nakdong river basin needs to develop alternatives to improve water supply stability because it indicates the most poor sustainability level.

Application of HACCP principles to MAR-based drinking water supply system (MAR기반 음용수 공급 시스템에의 HACCP 원리 적용)

  • Ji, Hyon Wook;Lee, Sang-Il
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.30 no.5
    • /
    • pp.533-543
    • /
    • 2016
  • Supplying clean and safe water to people is facing both quantitative and qualitative challenges. Due to climate change, access to freshwater becomes increasingly difficult, while pollution from various sources decreases the public trust in water quality. Managed aquifer recharge (MAR) which stores and uses surface water in aquifer is receiving attention as a new technology to secure freshwater. Recently, there is a global expansion in the attempt to combine general purification plants and hazard analysis and critical control point (HACCP) which manages all the process from raw material to consumer for food safety. This research is about an attempt to apply HACCP to the drinking water supply process using MAR to secure both quantity and quality of drinking water. The study site is a MAR plant being constructed in the downstream area of the Nakdong River Basin, South Korea. The incorporation of HACCP with MAR-based water supply system is expected to enhance the safety and reliability of drinking water.

Demonstration study on Desalination System using Solar energy (태양에너지 해수담수화시스템 실증)

  • Kim, Jeong-Bae;Joo, Hong-Jin;Yoon, Eung-Sang;Joo, Moon-Chang;Kwak, Hee-Youl
    • Journal of the Korean Solar Energy Society
    • /
    • v.27 no.4
    • /
    • pp.27-33
    • /
    • 2007
  • In this research, to develop the practical application system of fresh water generation system with plate-type fresh water generator using low pressure evaporation method is the main object, and to do that, this study used the evacuated solar collector with operating range of about $50-85^{\circ}C$ as thermal energy source and solar photovoltaic as electric energy source. To achieve that object, this study set up the demo-plant, then estimated and analyzed the usefulness, the safety, and the reliability through pre-tests during short time ahead of the long-time operation. This study showed that the pumps, which are including sea water supply, ejector, hot water supply, and fresh water pumps, were operated one after another. And, the fresh water yield was closely related with the solar irradiance and lower supply temperature of hot water was revealed more reasonable for the solar energy desalination system. That is due to the insufficient area than the solar collector area being required that was estimated through the performance tests of the fresh water generator.

The Study of Thyristor Valve Water Cooling Control Systems (대전력 반도체 정류기 수냉식 냉각 설비 냉매 온도 제어시스템에 관한 연구)

  • 임익헌;류호선
    • Proceedings of the KIPE Conference
    • /
    • 1999.07a
    • /
    • pp.230-233
    • /
    • 1999
  • The design and implementation of thyristor water cooling control systems in considered in this pape Coolant water is pumped through the thyristor heat sinks where heat is transferred from the thyristo to the water. This water is then pumped through outdoor air-to-water heat exchangers where heat I transferred to the outside air. Since the water must be pure, it is filtered and de-ionized. Also the water temperature must be below dew-point temperature. Redundant pumps, outdoor heat exchangers, power supply system, controller monitoring system are provided for system reliability and availability.

  • PDF

A Study for Storage Reallocation of Multipurpose Reservoir(II) - Conservation Storage Analysis (다목적댐 용량 재할당에 대한 연구(II)- 이수용량 분석)

  • Yi, Jae-Eung;Kwon, Yong-Ik
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.4
    • /
    • pp.283-292
    • /
    • 2004
  • In the past, it was unnecessary to consider the reallocation of reservoir storage because new reservoir construction was relatively not difficult. However, it became necessary since it is so difficult to construct new reservoirs in these days. In this study, the change of the water supply capability is evaluated through conservation storage drawdown frequency analysis, hydropower analysis, reliability, resiliency and vulnerability analyses for Geum River basin. As a result, it is confirmed that water supply capability of Daechung reservoir can be increased by reallocating flood control storage to conservation storage.