• Title/Summary/Keyword: Reducing construction period

Search Result 113, Processing Time 0.039 seconds

A Case Study of Stability of Bridge Abutment Using the Light Banking Material(EPS) (경량성토재(EPS)를 이용한 교량 교대의 안정성 검토)

  • Chang, Yong-Chai
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.5
    • /
    • pp.80-90
    • /
    • 1998
  • The EPS construction method-one kind of the load reducing methods-utilizes the EPS blocks, ultra-light materials whose unit weight is about 1/100 of soils and has been applied to many soft ground sites. It needed 3,000 days to get the 90% degree of the consolidation for the case of 12m high soil embankments on the 30m thick soft clayey foundations. The N value of SPT at this deposit was less than 5. The pack drain was installed to promote the radial consolidations. Although staged embankments were planned, designers failed to get a sufficient stability of the foundation ground. Therefore, the EPS fill method was selected to reduce the load and the construction period. EPS blocks(D-20 model) replaced the upper part of the soil embankments. These complex embankments reduced the ground settlement and the construction period. The possibility of lateral movements of the bridge abutments was checked and the design scheme was reviewed.

  • PDF

TECHNICAL PROPOSAL BASED COST REDUCTION BIDDING SYSTEM FOR SUPPLYING AFFODABLE HOUSING

  • Seunghee Kang;Jeongseok Lee;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1433-1439
    • /
    • 2009
  • Best value is the ultimate goal of the owner and can thus have diverse meanings according to the project characteristic, owner's purpose, user groups' payment capability, etc.. Recently, resettlement problems of the marginalized members in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). It means that a minimized production cost for reducing supply price of housing is a key factor in establishing the best value of the marginalized members. The lowest-price bidding system serves the purpose of ensuring a minimized production cost, but due to the low-cost investments, it creates various problems, such as sloppy construction, lowered quality, an increased LCC, and worsening profitability for builders. Thus, to help them resettle, it is necessary to supply affordable housing geared towards a certain appropriate quality and minimum construction costs. Towards this end, this study aimed to propose a cost reduction bidding system based on a technical proposal. The proposed technical-proposal-based cost reduction bidding system consists of the following components: work-unit-based, project-unit-based, and construction-period-reducing technical proposals. These components are evaluated to select the best bidder for a given project. The technical proposal based cost reduction bidding system proposed herein is expected to provide facilities with appropriate supply prices and appropriate quality levels, to bolster the technological competitiveness of builders.

  • PDF

A Study of Thermal insulation method using extruded and expanded Poly-ethylene panel contacted to the bathroom inner wall facing on the outside (외기와 면하는 욕실 내측벽에 압출 발포폴리스티렌 패널을 사용한 단열시공기술에 관한 연구)

  • Lee Jong-Jin;Oh Chang-Won;Yeo Sung-Yi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.11-16
    • /
    • 2005
  • This study is for the insulation construction of inner wall in a bathroom facing on the outside in the housings. This new dry construction method can be constructed by a dry panel which is bonded tiles on the extruded and expanded poly-ethylene panel in stead of the existing wet construction method. Compared to the existing method, this panel is light movably and is constructed simply. These representative construction merits are getting wide span in a bath due to reducing wall thickness and saving construction period.

  • PDF

Development of Mechanical Construction Method of Road Deck Middle Slab of Double Deck Tunnel in Great Depth (대심도 복층터널 중간슬래브의 기계화 시공법 개발)

  • Lee, Doo Sung;Kim, Young Jin;Kim, Tae Kyun;Kim, Chang Yeong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.3
    • /
    • pp.451-460
    • /
    • 2019
  • It is critical for Korea to make effective use of limited space as it has dense population and high traffic volume compared to its terrestrial area. To resolve this issue, diverse types of underground structures have increasingly been applied so far, and one of the most representative structures is double-deck tunnel. The construction period of the middle slab in the double deck tunnel constructed at the great depth can be considered as an important part after the tunnel lining construction in the whole process. In order to minimize the construction period required for construction of the middle slab in the double deck tunnel, it was proposed a method of the precast intermediate slab. In this study, it is suggested a mechanical construction process with dedicated equipments developed to improve the safety and the workability of erection of the precast middle slab than the current construction method using the existing mobile crane.

Developing Trend of High Strength and Good Toughness Linepipe Steel (고강도-고인성 라인파이프강 개발 동향)

  • Yoo, Jang-Yong;Kang, Ki-Bong
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.216-221
    • /
    • 2004
  • Linepipe steels with a low carbon acicular ferrite microstructure have been recently developed to accommodate the current transportation condition of the gas and oil industry, and they are finally applied to West- East pipeline project in China. By adopting acicular microstructure, both better formability and better toughness could be obtained due to low yield ratio and fine grained microstructure. Mechanical properties of pipe are not greatly different from those of base plates or hot coils with a microstructure of acicular ferrite. Merits of introducing higher strength steels are well known, i.e., reducing the gauge of pipe and the material cost, increasing the welding speed and decreasing construction cost because of reducing the construction period. Threfore, gas and oil industry has required higher strength steel than APIX70 grade steel. Under this background, API-X80 steel has been developed and shall be applied to the several projects. In this paper, developing stage of API-X80 steel is also presented and discussed.

  • PDF

Feasibility Study on Leveling Method of Electric Power Load by Applying Thermal Storage Air Conditioning System (축열식 열원시스템 적용에 의한 전력부하 평준화의 경제성 검토)

  • Lee, Chulgoo
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.15 no.1
    • /
    • pp.9-17
    • /
    • 2019
  • Reducing global warming potential has become important, and as one of those methods for reducing it, economic evaluation by applying ice thermal storage air conditioning system was performed. The floor area and height of the subject building was assumed $5,000m^2$ and 20 m. Absorption chillerheater system and air source heat pump system was used for comparing to the subject system, and payback period method was used to perform economic evaluation. Although the running cost of ice thermal storage system is reduced compared to two systems, the ratio is not significant compared to the increase of initial construction expenses, and payback period was calculated to be about 7.7 and 79.3 years. However, the heat storage system should be approached from the viewpoint of long term rather than the economic standard in the present standard.

An study on the Practical Application of Early Strength Concrete for Reduction of Working Period in Apartment (공동주택 공기단축을 위한 조강콘크리트의 현장 적용성 검토)

  • Jung, Yang-Hee;Lee, Jae-Hyun;Kim, Yong-Ro;Keum, Kyoung-Hun;Lee, Won-Am;Kim, Sun-Man
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.421-422
    • /
    • 2010
  • The decision of the form removal time which leads the early assuring strength of the concrete from apartment construction is the fact which is important from reducing the period of works and the economical efficiency side. This study investigates practical application of early strength concrete for reduction of working preiod in apartment construction.

  • PDF

Revitalization Methods of EIFS for High-rise Residential Buildings through Using TACT and Gangform System with Hanging Scaffolding

  • Lee, Sang-Hyun;Yi, June-Seong;Shin, Seung-Woo;Kang, Hae-Min
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.4
    • /
    • pp.407-418
    • /
    • 2011
  • Recently energy management measures at the political level, for the purpose of reducing energy consumption in the building sector, are being actively introduced. As a practical method, the exterior insulation method, which is proven to effective in reducing the energy loss through walls, has been favored. In this study, detailed implementations are suggested to activate exterior insulation system which can improve the housing insulation performance. The newly designed Gang-form system with hanging scaffolding was suggested to revamp constructability for finishing outer wall. The research results are based on a multifaceted analysis of the current problems of exterior insulation systems, and on recommendations proposed by exterior insulation experts in the Charrette discussion. The study has indicates that the customized TACT schedule considering the site condition has shortened the construction period to 5 months from 7.5 months. Through utilizing the suggestions of this study, the prevalence of exterior insulation systems is expected to become widespread.

Economic Analysis of Economic Steel beam method. (ES 빔 공법의 경제성 분석)

  • Choi, Tae-Ho;Woo, Jong-Yeol;Hong, Seong-Wook;Seo, Yong-Chil;Shin, Chan-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.133-136
    • /
    • 2011
  • This study concerned with the steel beam of bonding method and bonded steel beams by this method and both ends of different height, steel beams and steel beams in the center makes the junction. Both ends and the central part of steel beams connecting the lower flange by additional combining steel plates to convey stress, the stress to focus on the beam connections are passed to both ends of steel beams, and strength of beam connections is improved and steel structural beams is proposed to minimize the loss by Incision. If you use the developed method, the construction period is shortened, and reducing the amount of material can decrease the cost and reduction in floor height can be maximized business feasibility.

  • PDF

Evalution of Practial Application of high early Strength Concrete using Early strength type material (조강형 재료를 사용한 초조강 콘크리트의 적용성 평가)

  • Yang, Hoon;Park, Kyu-Yeon;Lee, Sang-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.48-49
    • /
    • 2013
  • This test investigates early strength and durability of concrete using early strength type materials(cement, Polycarboxylate acid). The goal of this test is to secure the strength of 5.0 MPa in 12 hours early age and strength of 14 MPa for 24 hours correspondingly. This type of admixtures, concrete curing temperature, amount of binder and other concrete properties were confirmed by experimental factors. Comparing outcomes from two cases on using early strength type materials and common materials resulted in reducing of costs and shortening of the construction period, that determined the economical benefits of using early strength materials in construction.

  • PDF