A Case Study of Stability of Bridge Abutment Using the Light Banking Material(EPS)

경량성토재(EPS)를 이용한 교량 교대의 안정성 검토

  • 장용채 (한국도로공사 도로연구소 지반연구실)
  • Published : 1998.10.01

Abstract

The EPS construction method-one kind of the load reducing methods-utilizes the EPS blocks, ultra-light materials whose unit weight is about 1/100 of soils and has been applied to many soft ground sites. It needed 3,000 days to get the 90% degree of the consolidation for the case of 12m high soil embankments on the 30m thick soft clayey foundations. The N value of SPT at this deposit was less than 5. The pack drain was installed to promote the radial consolidations. Although staged embankments were planned, designers failed to get a sufficient stability of the foundation ground. Therefore, the EPS fill method was selected to reduce the load and the construction period. EPS blocks(D-20 model) replaced the upper part of the soil embankments. These complex embankments reduced the ground settlement and the construction period. The possibility of lateral movements of the bridge abutments was checked and the design scheme was reviewed.

Keywords