Development of Mechanical Construction Method of Road Deck Middle Slab of Double Deck Tunnel in Great Depth  

Lee, Doo Sung (HongG Technical Research Institute)
Kim, Young Jin (HongG Technical Research Institute)
Kim, Tae Kyun (HongG Co.Ltd.)
Kim, Chang Yeong (Korea Institute of Civil Engineering and Building Technology)
Publication Information
KSCE Journal of Civil and Environmental Engineering Research / v.39, no.3, 2019 , pp. 451-460 More about this Journal
Abstract
It is critical for Korea to make effective use of limited space as it has dense population and high traffic volume compared to its terrestrial area. To resolve this issue, diverse types of underground structures have increasingly been applied so far, and one of the most representative structures is double-deck tunnel. The construction period of the middle slab in the double deck tunnel constructed at the great depth can be considered as an important part after the tunnel lining construction in the whole process. In order to minimize the construction period required for construction of the middle slab in the double deck tunnel, it was proposed a method of the precast intermediate slab. In this study, it is suggested a mechanical construction process with dedicated equipments developed to improve the safety and the workability of erection of the precast middle slab than the current construction method using the existing mobile crane.
Keywords
PSC middle slab; Installation equipment; Double deck tunnel; Reducing construction period; Construction;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Kim, B. Y., Lee, D. S., Choi, W. S. and Kim, K. Y. (2016a). "An experimental study on precast road deck slab of double deck tunnel in great depth under fatigue loads." Proc. of 2016 KSCE Conf., KSCE, pp. 89-90.
2 Kim, B. Y., Lee, D. S., Kim, T. K. and Kim, Y. J. (2016b). "An experimental study for the improvement of construction speed on PC and steel bracket." Proc. of 2016 KSCE Conf., KSCE, pp. 91-92.
3 Kim, B. Y., Lee, D. S., Kim, T. K. and Kim, Y. J. (2017). "A experimental study on the structural performance of precast bracket under precast road deck slab of double deck tunnel." J. Korean Soc. Civ. Eng., KSCE, Vol. 37, No. 4, pp. 647-658.   DOI
4 Kim, B. Y., Lee, D. S., Kim, T. K., Bae, C. K. and Kim, J. G. (2016c). "The experimental study on transverse field connection method of precast road deck slab of double deck tunnel in great depth." Proceeding of the Korea Concrete Institute Conf., KCI, Vol. 28, No. 1, pp. 125-126.
5 Kim, C. Y. and Hwang, S. P. (2019). "Technology status and application of double deck tunnel in great depth." Journal of the Korea Road Association, Vol. 153, pp. 20-27.
6 Lee, D. S., Kim, B. Y. and Kim, T. K. (2017a). "Development of construction method for reducing construction duration of road deck middle slab of double deck tunnel in great depth." Proc. of 2017 KSCE Conf., KSCE, pp. 5-6.
7 Lee, D. S., Kim, B. Y., Bae, C. G. and Hur, J. H. (2017b). "The experimental study on transverse field joint method of precast road deck slab of double deck tunnel in great depth." Journal of the Korea Concrete Institute, KCI, Vol. 29, No. 1, pp. 23-32.   DOI
8 Lee, D. S., Yoo, W. K., Kim, Y. J. and Kim, T. K. (2018). "Development of mechanical construction method of road deck middle slab of double deck tunnel in great depth." Proc. of 2018 KSCE Conf., KSCE, pp. 222-223.