최근 건설경기의 침체 및 원자재가 상승 그리고 후분양제의 시행 등으로 인해 공사기간 단축에 의한 공사비 절감에 대한 요구가 증가하고 있다. 공사기간 단축을 위한 방안으로 조강 콘크리트를 사용하여 양생기간을 단축시키는 방법이 일반적으로 사용되어지나 기존의 조강시멘트나 조강혼화제를 사용할 경우 고가의 재료비용이 소요될 뿐 아니라, 콘크리트의 초기 수화열 증가 및 작업성 저하 등의여러 가지 문제가 발생되고 있다. 본 연구에서는 조강형 결합재와 혼화제를 사용한 콘크리트의 현장에 적용하여 거푸집 탈형 시기를 앞당김으로써 공기단축에 의한 공사비 절감을 달성하고자 한다. 조강형 결합재와 혼화제를 사용한 콘크리트의 현장 적용성을 확인하기 위하여 기존의 조강시멘트와 조강혼화제를 사용한 콘크리트와 함께 경시변화시험 및 응결시간 측정시험 그리고 압축강도시험 등의 비교 시험을 실시하였다.
The way to shorten a construction period is considered to an very important technology development element as reducing the formwork removal periods with promoting strength revelation own concrete. This study executed experiment to review usability of early strength revelation chemical admixture which is judged in ways effective with premature removal of form about concrete. Use of early strength revelation AE water reducin admixture is apperaing so that strength revelation by early hydration promotions is excellent. The results of being applied proposed work process are that compressive strength are appeared more than 5MPa within 16 hours so that removal of vertical form was possible. the concrete compressive strength satisfied with a more than 2/3 of specified concrete strength for removal of horizontal form are appeared in 42 hours of 27 MPa proportioning strength, in 36 hours of 30, 35 MPa proportioning strength so that the 6 days cycle time of concrete structural frame work is cut by 2 days as shortening delayed period in works of removing slab forms. So construction cost reductions and a construction period shortening are judged so that it is possible.
세계에서는 지구온난화 등에 따른 기후 변화에 대응하여 원전 건설을 금지해오던 국가들도 점점 허용하는 추세이다. 따라서 앞으로의 원전 건설이 늘어날 것이며 이에 대한 경쟁 또한 심화될 것이다. 원전 프로젝트는 일반 건설 공사와 비교하여 공사 기간이 매우 길다. 원전 건설 프로젝트에서 경쟁 우위를 확보하기 위해 원전 공사 기간을 줄일 수 있는 기술을 개발하는 것이 필요하다. 따라서 본 연구의 목적은 원자로 건물 외벽 거푸집의 높이를 3m에서 4m로 증가시킴으로써 공사 기간을 감소시키기 위한 원자로 건물 외벽 거푸집을 개발하는 것이다. 개발된 거푸집을 원전 프로젝트에 적용하기 위해 구조적 안전성과 시공성 및 경제성을 분석하였다. 현장 적용 가능성을 평가한 결과 개발된 거푸집은 구조적으로 안전했다. 그리고 시공 단수가 감소함으로써 공사 기간이 단축되고 공사비 또한 절감되는 효과를 확인하였다. 본 연구의 결과는 향후 원자로 건물의 공사 기간 단축을 위한 지속적인 기술 개발을 위한 자료로 활용하여 한국의 세계 원전시장에서의 경쟁력 확보에 기여할 수 있을 것으로 사료된다.
본 연구에서는 콘크리트의 조기강도 확보를 통해 골조공기를 단축하는 것을 목표로 하여 시멘트 종류, 고성능감수제의 감수율, 초기수화 촉진 혼화제의 혼입에 따른 콘크리트의 조기강도 발현성능을 검토하였다. 조기강도 개선형 시멘트와 Sodium persulfate, Potassium hydroxide의 초기수화 촉진물질에 의해 12시간에 5MPa, 18시간에 14MPa의 조기강도를 확보할 수 있는 것으로 나타났다. 이를 통해 건설현장에서 거푸집의 골조공기를 단축시켜 원가절감이 가능할 것으로 기대된다.
The defects that are bound to arise in most construction projects cause disputes among the contracting parties regarding the defect warranty liability (DWL)guaranteed by the retention of the contractor's performance security at the end of the performance period of the contract. Most current projects involve a multiple-tier contractual relationship, causing the liability for some defects to overlap. In addition, many construction projects are made up of multiple detailed work types which an expert hired by the owner inspects the part completed by the contractor and pays an interim payment. However, after the completion of work, the contractor will still hold the defect warranty liability. In a scenario in which the work is delayed due to reasons for which the owner is responsible, the defect warranty liability period is also increased, imposing an additional burden on the contractor. In this study, basic research was carried out with the goal of reducing problems related to defect warranty liability Problems related to defect warranty liability cases and the nature of the defect warranty liability period were investigated. Possible solutions to the problems caused by the DWL that were suggested include the separation of the negligence liability period and the strict liability period, as well as the introduction of a retention money system.
The decision of the Form removal time which leads the early assuring strength of the concrete from Apartment construction is the fact which is important from Reducing the period of works and the economical efficiency side. Especially, with Complex building of recent times the same Tall building and Multiple Apartment Site which only follows in upgrade of interior construction of apartment site and shortening the frame construction period becomes very, importantly is the actual condition where the effort which is various for this is attempted. But is caused by with limit and economical efficiency problem of case concrete early strength revelation of most and is not put to practical use is the actual condition. Develops concrete mixture which is a utility from the research which sees hereupon and the effect which is economic leads construction duration shortening under maximizing boil.
In this study, it is contents to application on AE water reducing admixture for high early strength, which reduce to construction period for cost down in construction. In experiment result on the kinds of AE water reducing admixture for concrete strength promotion, when passed 60 minutes, while it was happened on lignin and naphthalene system about $30\∼35\%$ that loss related to slump, slump flow and air, but happened about $8\∼10\%$ on polycarboxylic system. And the result of compressive strength tests, when 32 hours passed in polycarboxylic system than lignin and naphthalene system, was showing an increase of 10$\%$. Accordingly, concrete properties was measured to condition change by the addition amount and curing temperature of polycarboxylic system. The required curing temperature to gain 5MPa of compressive strength, which is capable of side form stripping, must keep more than smallest 12. 5$^{circ}C$ when polycarboxylic system is used. As a result, AE water reducing admixture of polycarboxylic system may apply effectively to high early strength concrete
The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule.
The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.
2013년부터 국산 전자뇌관이 출시되면서 많은 석산 및 건설현장에서 폭넓게 사용되어지고 있다. 도심지에서 이루어지는 SOC 프로젝트의 경우, 대부분 민원을 줄이기 위해 대심도로 설계가 이루어지는 추세이다. 대심도 굴착개발은 작업구 및 환기구 등의 시공에 많은 시간과 비용이 발생된다. 현장 인근에 보안물건이 위치한 경우, 기계식굴착공법을 적용하는 경우가 있으며, 이러한 기계식굴착방법은 암반의 강도 및 굴착장비의 성능에 따라 영향을 받는다. 기계식 굴착공법의 작업효율이 떨어지는 경우, 공사기간이 늘어나면서 비용이 증가하는 문제가 발생하고 있다. 본 사례는 도심지내 대심도 수직구 현장에서 기계식굴착공법으로 설계된 현장을 전자뇌관 발파공법으로 전환한 사례이다. 전자뇌관을 이용하여 발파소음과 진동에 대한 환경규제기준을 충족시키면서 공사기간을 단축시켰다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.