1 |
Kim KM, Park SJ, Hwang IS, Kim KH, Practical Application of High Early Strength Type Concrete Using High Early Strength Type Binder, Proceedings of the Fall Symposium of Architectural Institute of Korea; 2009 Oct 24; Chuncheon, Korea: Architectural Institute of Korea; 2009. p. 471-4
|
2 |
Kim DH, Kim MJ, Lee SH. An Experimental Study on Reduction of Workin Period of Concrete using High Early Strength Binder. Proceedings of the fall Symposium of the Korea Concrete Institute;2008 Nov 7; Ilsan, Korea; Korea Concrete Institute; 2008 p. 513-6
|
3 |
Jung JH, Lee G, Hong GH, Lee CH. An Analysis on Difficulties and Delay Factors for the Development and Application of Technologies for Reduction of Construction Duration. Journal of Architectural Institute of Korea. 2010 Jan;26(1):121-8
과학기술학회마을
|
4 |
Kim MH, Lee SH, Kang SP, Khil BS, Joo JH. Development of early strength of high-strength cocrete according to curing temperature for application of system form. Journal of the Korea Concrete Institute. 2001 Dec;13(6):536-43
|
5 |
Lee SS, Song HY, Lee JH, An experimental study on the early strength development properties of concrete according to curing condition and used materials, Journal of the Korea Concrete Institute. 2008 Dec ;20(6):721-9
과학기술학회마을
DOI
ScienceOn
|
6 |
Han CG, Hwang IS, Lee SH, Kim GD. Properties of Strength Development of Concrete at Early Age with Water Cement Ratio and Cement Factor. Journal of Architectural Institute of Korea. 2004 Apr;20(4):77-84
과학기술학회마을
|
7 |
Park KY, Kim YR, KIM GY. Early Strength Development Properties of Concrete Using Early Strength Improvement Type Cement. Journal of the Korea Institute of Building Construction. 2013 Jun;13(3):227-34
과학기술학회마을
DOI
ScienceOn
|