• Title/Summary/Keyword: Redevelopment project

Search Result 143, Processing Time 0.031 seconds

A Study on the Appropriate Utilization of Relocated School Sites - Focused on the 'A' Elementary School in Eun-Pyoung Gu, Seoul - (학교 이전적지의 적정활용 방안에 관한 연구 - 서울시 은평구 'A' 초등학교를 중심으로 -)

  • Kim, Jin-Su;Kim, Chang-Shin;Kim, Hyoun-Ho;Dong, Jae-Wook;Lee, Hwa-Ryong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.18 no.1
    • /
    • pp.29-38
    • /
    • 2011
  • ent years, the change of urban function and the decrease in birth rate have given rise to merge, abolition and relocation of the existing schools. This study explores the possibilities for various land utilizations of relocated school sites, using the trial case of 'A' elementary school in Eun-pyeong gu, Seoul. 'A' elementary school has happened transfer plan due to the urban development project of the redevelopment area, Eun-pyeong gu in Seoul. Firstly, it studies the land use categories and the development methodologies of 7 relocated school sites happened in Seoul. In addition, it analyzes the land utilization after relocation, development principals, area, building usage and changes in land use regulation. Finally, it proposes the commercial exploitation of school site targeting 'A' elementary school site. Throughout the profit analysis, this study concludes that it is available to exploit the relocated school sites by the variety of development methodologies, especially in a metropolis like Seoul.

  • PDF

Utilizing Noise Mapping in Environmental Impact Assessment in a Downtown Redevelopment Area (도심지 재개발사업 환경영향평가시 소음지도 적용방안에 관한 연구)

  • Lee, Shi-Won;Park, Young-Min;Choi, Jin-Kwon;Chang, Seo-Il
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.15 no.11 s.104
    • /
    • pp.1311-1317
    • /
    • 2005
  • In environmental Impact assessment, noise impact assessment usually consists of three stages-surveying the existing noise levels by measurements, predicting noise levels induced by construction works and predicting noise levels after the completion of a project. The distance-attenuation relation of a point source, which has been used to predict the noise level due to its simplicity does not consider complex acoustic phenomena like multi-reflection, -diffraction and -absorption due to complex topographic configuration of buildings and terrains. For the consideration of such physical complexities. a noise mapping tool is adopted to produce a series of noise maps, which are those for the present, tot the works of construction and for the future. For accurate noise mapping, acoustical and topographic Information is used. Standard sound power levels and directivities of various construction equipments are need and scheduling of construction processes and locations of the equipments should be provided. In the case of exceeding legal limit, mitigation measures are applied to satisfy the legal limits and subsequent noise map is obtained and checked.

Suggestions for the Revitalization of the Construction Industry in Busan (부산지역 건설산업 활성화를 위한 개선방안)

  • Bae, Min-Kyoung;Huh, Young Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.219-224
    • /
    • 2009
  • Construction industry is an important key industry and many measures to revitalize it as local economy has been stagnant. However, construction industry works combined with governmental policies, global and local economies, populations, construction companies and many other related factors, and it is very hard for those counter-plans to meet every need and goal of the related. In this study, interviews and questionnaires of the professionals of the construction industry in Busan, were carried out, to find the cause of the inactivity of the construction market, the problems of the policies and regulations, and the problems of the construction companies in Busan and the solutions were suggested. The realistic master-plans and the reduction of the cost price for the problems of the redevelopment business having no feasibility, the reasonable relaxation of the restrictions for the problems of the governmental policies, the professional training and education for the lack of the high-quality human resources and the working system changes for the problems of the local construction companies turned out as results. The results of the study will be a chance to understand the different ideas of the professionals, and help with the plans to improve and to revitalize the local construction industry. The results of the study will be a chance to understand the different ideas of the professionals, and help with the plans to improve and to revitalize the local construction industry.

  • PDF

The Impact of the Land Compensation Act to the Outcome of Land Compensation: a Case Study of Gyeongsan DAEIM Public Housing District (경산 대임공공주택지구의 대토보상결과를 통해 살펴본 대토보상제도 문제점과 개선방안 연구)

  • Park, Chang-Yul;Park, Jung-Jun;Son, Sun-Gum
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.75-92
    • /
    • 2020
  • This study explores the outcome of the current Land Compensation Act for the indigenous residents of DAEIM Public Development Project Zone in Gyeongsan City. The purpose of the law is to return part of the development gains to the native residents and to support the re-settlement of the native residents. As the Land Compensation Act applies to each area with different standards, the monetary terms of land compensation which the native residents eventually receive varies across the region and development sites. That means the development gain is not fairly shared with the native residents of the redevelopment area and it does not necessarily support the settlement of the existing residents. It is supposed that the actual compensation for the native residents should be in full cash value but it is not in reality. The study demonstrates the outcomes of the land compensation that the residents received are far from the original purpose of the Compensation Act using the case example of DAEIM Public Development Zone in Gyeongsan, Gyeongsangbukdo. Only a small proportion of the natives managed to achieve the development gains. Accordingly the majority of the native residents has lost re-settlement opportunity. It suggests that the Compensation Act and the implementation procedure should be reviewed and revised accordingly. The details of compensation plan should be tested and set up in line with the characteristics of the project area. In particular, the compensation details in terms of the size and types of land, average value of land for indigenous residents receive, and the amount of compensation per household should be clearly demonstrated to the resident.

A Study on Dispute Claim to the Apartment Reconstruction Projects (공동주택 재건축 사업의 분쟁 클레임에 관한 연구)

  • Lee, Mi-Ae;Kim, Dea-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.268-273
    • /
    • 2008
  • Because a procedure is complicated and various related parties participate in the redevelopment and reconstruction project, it can be extended to diverse disputes when the relation with the related parties is smoothly adjusted. In particular, when the dispute occurs in a phase of occupancy after the complete construction, the regional residents-centric association must give up many rights of invisible parts caused by the construction company's profit maximization because they are short of professionalism about the business. Accordingly, this study is aimed at providing the construction project manager's dispute and claim process for responding to the dispute or claim reasonably and for obtaining the client's (association) rights for the reconstruction project, and at developing the checklist for obtaining the necessary documents by each phase, when the dispute or claim is made by the association against the construction company after the completion of construction. Through this study, the association can obtain the related documents in advance and can implement the reasonable response data when the dispute or claim occurs due to it. Also, it will enable the construction manager to analyze the project costs reasonably and will reduce the estimated wastes. That is, the work efficiency is expected to be improved.

  • PDF

Change Detection of Building Demolition Area Using UAV (UAV를 활용한 건물철거 지역 변화탐지)

  • Shin, Dongyoon;Kim, Taeheon;Han, Youkyung;Kim, Seongsam;Park, Jesung
    • Korean Journal of Remote Sensing
    • /
    • v.35 no.5_2
    • /
    • pp.819-829
    • /
    • 2019
  • In the disaster of collapse, an immediate response is needed to prevent the damage from worsening, and damage area calculation, response and recovery plan should be established. This requires accurate detection of the damage affected area. This study performed the detection of the damaged area by using UAV which can respond quickly and in real-time to detect the collapse accident. The study area was selected as B-05 housing redevelopment area in Jung-gu, Ulsan, where the demolition of houses and apartments in progress as the redevelopment project began. This area resembles a collapsed state of the building, which clear changes before and after the demolition. UAV images were acquired on May 17 and July 9, 2019, respectively. The changing area was considered as the damaged area before and after the collapse of the building, and the changing area was detected using CVA (Change Vector Analysis) the Representative Change Detection Technique, and SLIC (Simple Linear Iterative Clustering) based superpixel algorithm. In order to accurately perform the detection of the damaged area, the uninterested area (vegetation) was firstly removed using ExG (Excess Green), Among the objects that were detected by change, objects that had been falsely detected by area were finally removed by calculating the minimum area. As a result, the accuracy of the detection of damaged areas was 95.39%. In the future, it is expected to be used for various data such as response and recovery measures for collapse accidents and damage calculation.

Critical Review about the Character of Communication among Participating Stakeholders in the Improving Alley Landscapes in Residential Neighborhoods Project (주거지골목길 경관개선사업에서 참여 이해관계자의 의사소통 특성)

  • Kim, Yun-Geum;Lee, Ai-Ran
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.2
    • /
    • pp.25-36
    • /
    • 2016
  • This paper discusses the character of communication among participating stakeholders in the Improving Alley Landscapes in Residential Neighborhoods project. The participation of diverse stakeholders in conventional urban redevelopment is considered to delay and complicate the progress of a project. However, in urban regeneration, a field-oriented operating system and collaboration between diverse stakeholders is considered critical to building a sustainable community. A stakeholder is defined as "a person or organization that can influence decision-making or be influenced by it." This paper uses a case study to examine what types of stakeholders participate and what communicative processes and ideas are shared among them. Six neighborhoods were selected out of a total of 26 of Seoul's 2014 Improving Alley Landscapes project. This research was developed through interviews and a review of the literature. The character of communication among stakeholders in the case study is as follows. Firstly, the administration initiated the project but did not show leadership. This was caused by a gap in understanding about the project between city and borough administrations, Further, the city administration lacked experience with projects that placed an emphasis on fieldwork. Tongjand and Banjang, at ancillary institutions, acted as spokespersons and helped people in the community to understand the administrative process. However, because they led communication and used personal relationships to ensure they communicated effectively, the communication process had limits from the perspective of democratic process. Diverse stakeholders expressed their opinions in the public sphere and communicated about them using diverse media. Finally, experts produced the output, facilitated communication, and mediated in conflicts. Because new experts acted as facilitators and mediators, there was a great deal of trial and error. This project has particular significance: Seoul's city government deals with urban space rather than parks and green space, which are limited by boundaries; and whether "green" can be used for urban renovation was tested by several landscape architects, who sought to identify a new role in urban renovation, namely, the role of landscape and landscape architecture. However, the project has some limitations, including an insufficiently detailed project plan, a lack of common understanding among stakeholders, and a short timeframe. A number of stakeholders overcame these limitations to a certain degree. Officials of the Borough and the Dong managed the project and resolved civil complaints. Experts provided special information, and contributed to the design and construction of improvements.

A Study on the Behaviour of Existing Subway Tunnel due to Demolition of Old Buildings and Construction of New Buildings (기존 건물 철거 및 신축 공사에 따른 지하철터널 거동특성 연구)

  • Chung, Jeeseung;Lee, Kyuyoung;Kim, Yongsoo;Lee, Sungil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.10
    • /
    • pp.23-28
    • /
    • 2014
  • Recent increasing of redevelopment project causes construction of new buildings after demolition of old buildings. However, the researches have been largely confirmed to analysis of behaviour characteristics of existing subway tunnel due to adjacent excavation which constructing new building so far. Accordingly, The ${\bigcirc}{\bigcirc}$ Building which will be built after demolishing existing parking lot is selected as a subject of study. And the purpose of this study is to analyze the effects on existing subway tunnel due to loading and unloading caused by demolition of upper buildings. The numerical analysis was performed by using the MIDAS/GTS program. Two cases for the numerical analysis were analyzed. The one is considering demolition of old buildings and the other is not considering it. This study is to analyze the effect on existing subway tunnel caused by demolition of upper building by analyzing numerical analysis results for tunnel displacement and lining stress. It was analyzed that the effects of considering the demolition of old buildings are larger than those of no considering it.

A Study on Estimating Units of Construction & Demolition Debris (건설폐기물의 원단위 산정기준에 관한 연구)

  • Kim, Hyo-Jin;Kim, Chang-Hak;Lee, Choel-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.500-503
    • /
    • 2004
  • In this country, now redevelopment and rebuild is becoming largely because it is improving welfare and life condition with high growth of economy. Also, the scale of construction project is trend to increase to adjust the changing social situation. Accordingly, C&D waste is rising largely because of the increased demolition works in city. The right management of C&D waste is becoming one of very important things, but little research has been conducted to estimate correctly C&D waste. This study suggests standard units of C&D waste which can estimate demolition quantity of apartment. These units can estimate easily and correctly C&D waste in demolition works and also can make it possible to use very important material to carry out policy of national waste management.

  • PDF

Bow Structure Design of the FPSO installed in the North Sea under the Flare Slamming Load (북해설치 FPSO의 플레어 슬래밍 하중에 대응한 선수 설계)

  • Kim, Ul-Nyeon
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.52 no.5
    • /
    • pp.418-424
    • /
    • 2015
  • This paper is about the bow structure design of the ship-typed and turret moored FPSO which is subjected to the bow-flare slamming load in harsh North Sea environments. Quad 204 FPSO project involves the redevelopment of the existing Schiehallion FPSO which is damaged by impact wave loads. Normally all offshore systems including FPSO are designed to withstand the 100 year storm I.e. the storm that happens once every hundred years at the location where the system is installed. Several incidents have revealed that impact loading is important issue for moored floating production systems. In this paper, the design impact loads are estimated considering the ship owner’s specification, measured data from model tests, requirements of the classification society rules and results of numerical simulation analyses. The impact pressure by numerical analysis is 1.8 times greater than required value by CSR adopted by IACS. Based on the selected design load, plastic design formulae allowing the local material yielding are applied for the initial scantling of the bow structure. To verify the structural integrity, FE analyses are carried out considering the local area subjected to the impact wave loads. Their results such as structural arrangement, design loads and scantlings are shown and discussed. It is found that plastic design formulae in adopting Initial design phase give sufficiently conservative results in terms of structural strength.