• Title/Summary/Keyword: Real time discharge

Search Result 234, Processing Time 0.034 seconds

Long term Rainfall-Runoff Modeling Using Storage Function Method (저류함수를 이용한 일단위 장기유출모의 모형 구축)

  • Sung, Young-Du;Chong, Koo-Yol;Shin, Cheol-Kyun;Park, Jin-Hyeog
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.7
    • /
    • pp.737-746
    • /
    • 2008
  • The purpose of developing a rainfall-runoff and reservoir model is to provide an analysis tool for hydrological engineers in order to forecast discharge of rivers and to accomplish reservoir operations easily and accurately. In this study, based on the short-term rainfall-runoff storage function model which has gained popularity for real time flood forecast in practical water management affairs, a long-term runoff model was developed for the improvement of the calculation method of effective rainfall and percolation at the infiltration area. Annual discharge was simulated for three dam watersheds(Andong, Hapcheon, Milyang) in Nakdong River basin to analyze the accuracy of the developed model and compare it to SSARR model, which is used as the long-term runoff model in current practical water management affairs. As the result of the comparison of hydrographs, SSARR model showed relatively better results. However, it is possible for the developed model to simulate reliable long-term runoff using relatively little available data and is useful for hydrological engineers in practical affairs.

Experimental Verification of Multipactor Sensitivity for S-band Diplexer (S 대역 Diplexer에 대한 Multipactor 민감도 시험)

  • Choi, Seung-Woon;Kim, Day-Young;Kwon, Ki-Ho;Lee, Yun-Ki
    • Aerospace Engineering and Technology
    • /
    • v.6 no.1
    • /
    • pp.83-91
    • /
    • 2007
  • An experimental verification of multipactor(MP) discharge for S-band diplexer as a sample DUT for space application by an in-house MP test facility is proposed. The designed diplexer having two BPFs for Rx and Tx is applied to a design of five pole inter-digital cavity type band pass filter with chebyshev response, it has 2.7 % bandwidth centered at 2.232 and 2.055 GHz for Rx, Tx, respectively. To avoid the MP discharge, the accurate design and analysis methods based on 3D EM field analysis are considered. The proposed in-house MP test facility consists of a phase detecting system using a doubly balanced mixer as a simple, low cost and real time MP test method compared with results of previously well-known MP detection systems as cross reference methods. The calculated MP threshold RF input power is 43.13 dBm. The measured one is 43 dBm and 44 dBm for CW, pulsed mode test, respectively.

  • PDF

A Linear Analysis of the Relation between Rainfall and Runoff for Peak Flow based on Geomorphologic IUH (지형학적(地形學的) 순간단위도(瞬間單位圖)에 의한 첨두유량(尖頭流量)의 강우(降雨)-유출(流出) 선형해석(線形解析))

  • Lee, Jung Sik;Kim, Jae Han;Lee, Won Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.7 no.1
    • /
    • pp.55-64
    • /
    • 1987
  • The schemes synthesizing the instantaneous unit hydrograph(IUH) are presented by using the geomorphologic parameters of a basin. To this end, the channels in the network are numbered according to the Strahler scheme, and the mathematical formulation corresponding to a dynamic probability theory for deriving the geomorphologic IUH(GUH) is refered to the existing techniques adopted by Rodriguez-Iturbe and Valdes. Also, the mean runoff velocity is applied for expressing a dynamic state of flow. The applicability of the GUH to the real drainage basins is tested by using the data observed in a few basins with areas of the order of 9.2, 20, 33.63, and $109.73km^2$ in Korea. The test is carried out by checking the discrepancies between the observed and simulated values for the peak discharge and its time of occurrence which are the most important parameters of an IUH by varing the mean runoff velocity and the inputs. As a result, good agreement is found between them, and it is shown that the variability in peak discharge of hydrograph depends on the mean runoff velocity more than the constant loss rate.

  • PDF

Design and implementation of ESD cable Disconnection Monitoring System (ESD 접지선 단선 모니터링 시스템 설계 및 구현)

  • Seong, Jung-Mo;Chung, Young-Suk;Park, Koo-Rack
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.8
    • /
    • pp.77-82
    • /
    • 2017
  • In the splay manufacturing process, conveyor systems are widely used for conveying panels. In this conveyor, a large number of grounding lines are used in order to prevent a product failure due to static electricity. In many cases, the grounding line is disconnected due to the rotation of the transporting roller or curling, leading to product failure. In order to solve such a problem, there is a growing need for a system capable of detecting disconnection of a ground wire in real time. Therefore, in this paper, we propose a disconnection monitoring system of ESD (Electro-Static Discharge) ground wire caused by friction between the conveyor drive part and the panel. The proposed system is a monitoring system that can detect disconnection and disconnection of ground wire using ATmega 2560 and Wheatstone Bridge circuit. It can detect disconnection of ground wire immediately and can take measures to reduce the defect rate due to static electricity. The system proposed in this paper is expected to be applicable to the production and test equipments of all industries where the ground wire is used.

A Development of Real Time Artificial Intelligence Warning System Linked Discharge and Water Quality (II) Construction of Warning System (유량과 수질을 연계한 실시간 인공지능 경보시스템 개발 (II) 경보시스템 구축)

  • Yeon, In-Sung;Ahn, Sang-Jin
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.7 s.156
    • /
    • pp.575-584
    • /
    • 2005
  • The judgement model to warn of possible pollution accident is constructed by multi-perceptron, multi layer neural network, neuro-fuzzy and it is trained stability, notice, and warming situation due to developed standard axis. The water quality forecasting model is linked to the runoff forecasting model, and joined with the judgement model to warn of possible pollution accident, which completes the artificial intelligence warning system. And GUI (Graphic User Interface) has been designed for that system. GUI screens, in order of process, are main page, data edit, discharge forecasting, water quality forecasting, warming system. The application capability of the system was estimated by the pollution accident scenario. Estimation results verify that the artificial intelligence warning system can be a reasonable judgement of the noized water pollution data.

Flood Runoff Analysis of Small River Basin using Geographic Information System (지리정보시스템을 이용한 소하천유역의 홍수유출 해석)

  • Lee, Yeon-Kil;Park, Sung-Chun;Lee, Kwan-Soo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.6 no.1
    • /
    • pp.24-36
    • /
    • 2003
  • Many rainfall-runoff model, which is applied discharge calculation for effective water-resource planning and management needs topographic and parameter of basin character. But it is very difficult to apply real a phase. Accordingly in this study filling up these problems. Applying GIS(geographic information system) through environment creating input data or concerning with GIS and rainfall runoff model. We built environment that analyze hydrograph showing discharge variation by time. GIS software for constructing input data is used by ArcView. For analysis of hydrograph in Basin, TOPMODEL applied topographic index. Besides for estimate of appliance to rainfall-runoff model, simple storm event and complex storm event are applied rainfall data which was before.

  • PDF

Application of the Artificial Neurons Networks for Runoff Forecasting in Sungai Kolok Basin, Southern Thailand

  • Mama, Ruetaitip;Namsai, Matharit;Choi, Mikyoung;Jung, Kwansue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.259-259
    • /
    • 2016
  • This study examined Artificial Neurons Networks model (ANNs) for forecast flash discharge at Southern part of Thailand by using rainfall data and discharge data. The Sungai Kolok River Basin has meant the border crossing between Thailand and Malaysia which watershed drains an area lies in Thailand 691.88 square kilometer from over all 2,175 square kilometer. The river originates in mountainous area of Waeng district then flow through Gulf of Thailand at Narathiwat Province, which the river length is approximately 103 kilometers. Almost every year, flooding seems to have increased in frequency and magnitude which is highly non-linear and complicated phenomena. The purpose of this study is to forecast runoff on Sungai Kolok at X.119A gauge station (Sungai Kolok district, Narathiwat province) for 3 days in advance by using Artificial Neural Networks model (ANNs). 3 daily rainfall stations and 2 daily runoff station have been measured by Royal Irrigation Department and Meteorological Department during flood period 2000-2014 were used as input data. In order to check an accuracy of forecasting, forecasted runoff were compared with observed data by pursuing Coefficient of determination ($R^2$). The result of the first day gets the highest accuracy and then decreased in day 2 and day 3, consequently. $R^2$values for first day, second day and third day of runoff forecasting is 0.71, 0.62 and 0.49 respectively. The results confirmed that the ANNs model can be used when the range of collected dataset is short and real-time operated. In conclusion, the ANNs model is suitable to runoff forecasting during flood incident of Sungai Kolok river because it is straightforward model and require with only a few parameters for simulation.

  • PDF

A Study on the Development of a Infusion Pump based on an Active Muscle Pump (능동형 근육펌프 구조의 수액 주입 펌프 개발에 관한 연구)

  • Lee, Jeong-Whan;Lee, Sang-Yeob;Lee, Jung-Eun;Ahn, Ihn-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.3
    • /
    • pp.443-449
    • /
    • 2022
  • In this study, in order to improve the disadvantages of the environmental error of the infusion set that performs infusion therapy in the existing clinical practice and to maximize the user's convenience by miniaturizing the existing infusion pump system, the structure of the muscle pump of the human vein was imitated. As a double check valve method, a method for preventing the backflow of fluid and discharging a constant fluid in one direction by external pressure was proposed. The proposed bio-mimic muscle pump uses a check valve that controls the flow of fluid in one direction and a silicone tube with elasticity, and a chamber is constructed. A peristaltic pump for applying intermittent pressure to the tube chamber was constructed using a multi-cam structure roller. In order to verify the performance of the proposed pump, optimization was performed while changing the number of multi-cam rollers and adjusting the speed of the roller driving motor, and the reproducibility of the instantaneous discharge amount and the continuous discharge amount of the pump was compared and tested. The performance of the muscle pump proposed in this study was verified through experiments that it can inject up to 1L of fluid within 12 hours, and that it is possible to inject the fluid with an accuracy of ±0.1ml. Real-time monitoring of the fluid injection volume through the bio-mimic muscle pump proposed in this study not only increases the convenience of the administrator, but also provides a precise fluid administration environment to more patients at a low cost, and additionally applies bubble detection and occlusion detection technology If so, it is believed that a safer medical environment can be provided to patients.

A case of discharge estimation for unmeasured operation period by real-time discharge measurement (자동유량측정시설 미계측 운영기간에 대한 유량산정 적용사례)

  • Cho, Sang Uk;Oh, Dong Heon;Baek, Jong Seok;Kim, Chi Young;Cha, Jun Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.320-320
    • /
    • 2020
  • 하천이용을 위한 다양한 개발사업이 이루어지고 있고 대규모 보가 설치되면서 과거와는 다른 변화된 수리조건에서 기존의 방법으로는 유량자료 생산이 더욱 어려워졌기 때문에 자동유량측정시설의 필요성이 증대되어 조위나 배수 영향을 받는 지점에서 기존 방식을 대체하거나 보완할 수 있는 새로운 유량측정방법으로 자리매김하게 되었다. 자동유량측정시설은 2020년 4월 현재 기준으로 한강 19개소, 낙동강 23개소, 금강 10개소, 영산간 10개소 총 62개소가 운영 중이다. 하지만 4대강 사업 이후, 수질 문제 등의 이유로 2017년 6월부터 순차적으로 4대강 보를 개방하여 보 운영수위에 따라 유속측정이 곤란한 관측소가 증가하고 있으며 이로 인해 환경부 수자원정보센터에서는 보 운영 별 최저수위에서도 자동유량측정시설 운영이 가능하도록 시설물을 개선하는 사업을 실시하고 있다. 개선사업 기간 동안 자료생산의 공백이 발생하지 않도록 인력에 의한 유량측정성과를 확보하여 관측소별 대안유량 산정방법을 개발하였다. 개발된 대안유량은 관측소 개선공사 기간뿐만 아니라 보 운영에 따른 수위저하로 인한 미계측 기간에도 적용하여 유량자료의 손실을 최소화 하도록 하였다. 2019년 운영현황을 범위로 전체 관측소 62개 중 4대강 보 구간에서 관측소 개선공사 8개소와 수위 저하로 유속측정이 불가능한 12개소 중 수위-유량관계곡선식 적용이 가능한 2개소를 제외한 10개소를 대상으로 평균 76일 결측이 발생한 것에 대해 대안유량 산정방법을 적용하여 전 기간 유량자료를 보완하였다. 그 결과 전체 2019년 자동유량측정시설 유량산정률은 99.8%로 자료생산의 공백을 최소화 할 수 있었으며 향후, 보 구간 자동유량측정시설 개선이 완료된 후에도 장비 이상 또는 이상치 발생 시에도 대안유량 산정방법을 활용하여 자료생산의 공백을 최소화 할 수 있을 것으로 기대하고 있다.

  • PDF

Development of an Automated Measurement System for Dilution Process and Spraying Amount of Disinfectant

  • Kim, Jung-Chul;Chung, Sun-Ok;Cho, Byoung-Kwan;Chang, Hong-Hee;Kim, Suk;Chang, Dongil
    • Journal of Biosystems Engineering
    • /
    • v.38 no.4
    • /
    • pp.228-239
    • /
    • 2013
  • Purpose: The objectives of this study were to develop an automated disinfectant dilution system, and an automated data management system for spraying amount for resolving uncertainty problem. Methods: Proper diluting rate was made by a controlled volume pump for liquid disinfectant and a screw conveyer pump for solid disinfectant. The water capacity of disinfecting system of 400 L was controlled by two water level sensors. The water quantity of water tank was controlled by the signals which were produced by the water level sensors. Signals were processed by Labview Programming, and ON/OFF of solenoid valve that was used for controlling water supplying to water tank, was controlled by SSR. The operating time of pumps for disinfectant was controlled quantitatively. A turbine flowmeter was used for development of automated measurement system for spraying amount of disinfectant. In order to save the flowmeter data and to control the spraying system, a multi-function data logger was used, and it was processed and saved in Excel file by a program developed in this study. Results: Labview 2010 was used for programming to control the automated measurement system for spraying amount of disinfectant. Results showed that the relationship between flowmeter value and time had a significant linear relationship such as 0.99 of $R^2$. Generally, 6.74 L/s of diluted disinfectant is sprayed for a vehicle passing through the disinfection system (about 15 seconds). Test results showed that average error between the measured spraying amount and the flowmeter data was 50 mL, and the range of error was 1.3%. Since the amount and time of spraying could be saved in real-time by using the spreadsheet files which could not be modified arbitrarily, it made possible to judge objectively whether the disinfection spraying was performed or not. Test results of spraying liquid and solid disinfectant showed that the errors between the measured discharge rate and the theoretical one were ranged within 3-4% for various dilution rates. Conclusions: The disinfection system developed would be working accurately. The automated spraying data base management system satisfied the purpose of this study. The automated dilution process system developed in this study could discharge liquid and solid disinfectant with accurate dilution rate, relatively.