The study and techniques of system engineering have been applied to various fields including space-air, national defense division in advanced countries. Korea is currently in the early stages of introducing system engineering scheme in railway system and national defense division restrictedly. As theory and application of system engineering covers a wide scope, documents management and requirement analysis technology applied to establishment of standard and core unit development of the research target. The techniques which are historical management and trace among standards for establishment of standard are introduced using SE tools and participating agencies shared the information by constructing of database from all documents which are generated from the project. Through the functional analysis of the requirements for the intelligent station monitoring system in basic design stage, established requirements are verified and will be made official announcement as standard of the intelligent station monitoring system.
Recently, various attempts are made to increase the efficiency of railway freight transport including bulk cement, the most important transport item of railway transport market. The major seven cement companies have started common use of private bulk cement car since April 2008 for the efficiency of railway freight transport. At that time, major seven cement companies owned 75% of whole bulk cement car. Railway companies forecasted that this project will decrease the amount of cost and transport time of freight car. With these data, it analyzed the effectiveness of the joint use of freight car on actual used data.
Reliance on road transport in domestic logistics can lead to intensified congestion and greenhouse gas emissions due to the rise in oil prices, any increase in logistics costs can have a high social cost. The government policy on Low Carbon Green Growth is seeking to take advantage of the railway system. However, existing railway transport logistics systems, for reasons such as low speed, low track capacity constraints, and the impossibility of implementing a Door to Door system, make it difficult to activate a railway logistics program. As a result of this study, a national R&D project to develop a High-Speed Passenger/Baggage Mixed Train(Hy-SoBex) utilizing the rail capacity constraints to overcome the difficulties of linking an air cargo and freight railway logistics system, we propose a variety of service models and select the optimal service model.
The South Korean rail authority is constructing a nationwide tourism belt by developing new rail tour routes in an effort to combine local tourism resources with rail service and to create value in regional areas. As massive financial resources are required to develop and operate such tourist trains, governing authorities are required to examine the feasibility of this project as a sound business model and to assess the public benefit and profitability of the project. In this study, the economic feasibility of the tourist trains was assessed with the contingent valuation method (CVM). According to an estimation of the willingness to pay of potential tour train passengers, the surveyed subjects were willing to pay fares that were higher than prices currently published at the time of this study, thereby demonstrating that the economic value they invest on tourist trains may be higher than published prices at the time. For instance, they were willing to pay 28.4% and 54.9% more for the O-train and V-train types, respectively, according to the study, suggesting that the quality as perceived by train passengers for tourist train services is relatively high. The study is significant in that it succeeded in quantifying the satisfaction level of tourist train passengers using quantitative data (additional funds people are willing to pay).
Kim, Jae-Chul;Lee, Jae-Chon;Cho, Yun-Ok;Kim, Sang-Am;Han, Soon-Woo
Proceedings of the KSR Conference
/
2010.06a
/
pp.1798-1805
/
2010
The Railroad Safety Technology R&D Program has been supported by the Ministry of Land, Transport and Maritime Affairs. The Program consists of dozen or more projects and thus is quite complex, which requires effective project management. This paper is discussing how to effectively manage the railroad safety technology R&D program based on systems engineering management plan (SEMP). The key issues dealt in this paper include the SE management, requirements management, verification and validation, integrated data base management, and traceability management. To achieve the goal, we first defined an appropriate SE process to be adopted in the program and the result was documented in the systems engineering management plan. According to the process defined, we set up the environmental frame in database. Using the database and SEMP, each project of the program was verified with respect to the corresponding requirements utilizing the traceability. All these efforts were carried out using a computer-aided SE tool, which enables efficient management of complex database.
Journal of Korean Tunnelling and Underground Space Association
/
v.8
no.4
/
pp.377-388
/
2006
Most structures experience deterioration after construction. A routine inspection and maintenance must be accomplished for the efficient use of the structures. The routine inspection will play a major role on the determination of maintenance period and method. This study aims development of an automated tunnel inspection system based upon a 3 dimensional laser scanner. As for the initial stage of the project, a prototype tunnel scanner has been developed. The development of a tunnel scanner prototype follows comparison between image scanning and laser scanning system and investigation on the applicability and adaptivity of the scanners to the railway tunnel scanner. The applicability of the laser scanner on the railway tunnel has been confirmed from the pilot test by using commercialized general purpose close range laser scanner and applicability of a laser scanner as a railway tunnel scanner has been checked. From the result, a prototype of railway tunnel scanner has been built and the calibration of the system was carried out. Finally the developed tunnel laser scanner has been applied to different shapes and sizes of tunnels in use.
The Korea high speed train was launched from Seoul to Busan of 1st construction phase at 1st April, 2004. This huge project will be lead to a great change in korean society such as existing mode choice behavior change and the concentrating on KTX station zone lifestyle pattern's change. With the result to opening high speed train railway was diminished train journey time between Seoul to Busan from 4 hours 10 minute to 2 hours 40 minutes, and has been change population movement, favorite location of corporation headquarters, existing metropolitan transportation pattern and so on. In the middle of this study, I choose to analyse Seoul-Cheonan/Asan stations, Seoul-Deajeon stations, Seoul-Deagu stations, Seoul-Pusan stations. This study have a information to analyse among as like movement of population, status of employee structure, usage of land, movement inland transportation mode. I sure that this study will lead to helpful prediction both 2nd phase of Kyoung-bu high-speed railway and Ho-nam high-speed railway in advance.
The purpose of this study is to develop conflict management considering justification of planning decision by public involvement (PI) in the context of Korea as an approach to prevent conflicts for railway projects and to achieve consensus building between public and governments. In this study, to evaluate the effectiveness of conflict management in the process of railway planning, we examined the before and after survey on the light rail transit (LRT) planning that was previously conducted. We first conducted estimation on the causal relationships among factors related to acceptance of LRT planning by structural equation model. The estimation results show that conflict management activities and acceptance are positively related. We also discussed as follows: the level of recognition of railway project influences positive effects regardless of conflict management activities, the most important factor with respect to the acceptance is awareness for planning necessity.
Numerous train operating companies provide training by means of driving simulators. A detailed analysis in the course of the rail research project 2TRAIN has shown that the simulation technology, the purposes of training and the overall concept of simulator-based training are rather diverse (Schmitz & Maag, 2008). A joint factor however are weak assessment capabilities and the fact that the simulator training is often not embedded into the overall competence management. This fact hinders an optimal use of the simulators. Therefore, 2TRAIN aims at the development of enhanced training and assessment tools. Taking into account that several simulators are already in use, the focus lays on the extension of existing simulation technology instead of developing entirely new systems. This extension comprises (1) a common data simulation interface (CDSI), (2) a rule-based expert system (ExSys), (3) a virtual instructor (VI), and (4) an _assessment database (AssDB). The foundation of this technical development is an assessment concept (PERMA concept) that is based on performance markers. The first part of the paper presents this assessment concept and a process model for the two major steps of driver performance assessment, i.e. (1) the specification of exercise and assessment and (2) the assessment algorithm and execution of the assessment. The second part describes the rationale and the functionalities of the simulator add-on tools. Finally, recommendations for further technical improvement and appropriate usage are given. based on the results of a pilot study.
Kim, Jeong-Il;Ahn, Suk-Jun;Kwon, Jong-Wook;Kim, Jin-Il
Proceedings of the KSR Conference
/
2011.10a
/
pp.3214-3219
/
2011
HONAM High Speed Railway project is under construction with the target to have 350km/h design speed from Songjeong Gwangju City to Osong. The track for the whole section of the line is scheduled to be a concrete track in order to decrease total life cycle cost (LCC) according to the decrease of track destruction. However, the study on the related parts to increase the train speed up to 400km/h is on going in order to strength the competitiveness of high speed railway. On this study, the stress of track has been analyzed according to the concrete track design method of Eisenmann using equivalent depth theory proposed by Odemark for behavior analysis of concrete track on track bed, which is having embankment deformation characteristics by train load. The behavior analysis of track is performed to analyze the stress of track bed layer and track according to the variation of design load and train speed. And also, the characteristics of concrete track have been figured out by analyzing the parameter according to the thickness of track bed layer.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.