• Title/Summary/Keyword: Railway Project

Search Result 574, Processing Time 0.03 seconds

Fault Diagnosis and Performance Evaluation of Auxiliary Block for Korean High-Speed Railway (한국형 고속열차 보조전원장치 고장진단과 성능평가)

  • Kim, Seog-Won;Kim, Ki-Hwan;Kim, Sang-Soo;Koo, Hun-Mo;Joo, Hyun-Wook;Han, Young-Jae
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.612-617
    • /
    • 2006
  • As the on-board electric devices determine the performances of vehicles, production of reliable devices is important. To keep the reliability of devices constant, management of performance evaluation of the on-board devices is crucial. Because temperature has a serious effect on failures of the components of the devices, its measurement is the first step for good management. In this study, we described performance characteristics of domestic auxiliary block developed through G7 project. We measured the performances of auxiliary block during test running by the developed on-line measurement system. After we save the input real-time data from each signal of Korean High Speed Train through the network line, we can acquire necessary information through post-processing program. We verify the motor block characteristics of Korean High Speed Train by this system.

A study on the reduction effects of journey time as operating Korean tilting train (틸팅열차 투입에 따른 시간단축 효과 검토에 관한 연구)

  • Han, Seong-Ho;Lee, Su-Gil;Song, Yong-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.1121-1123
    • /
    • 2006
  • Tilting trains are now an established feature of railway operations throughout the world. For intercity traffic, tilt provides operators with increasing speeds, and therefore enhanced competitiveness, on existing routes where insufficient traffic or a lack of funds precludes the construction of a dedicated new high-speed railway. This paper explains the reduction effects of journey time with the Korean tilting train. The Korean Tilting Train express (TTX) project has been carried out to develop alt the core technologies related to tilting train and infra-technology to provide high speed inter-city service with the speed of 180 km/h as well as maintenance-free technology for conventional railway system. In order to simulate we considered 5 conventional railway. As a results of simulation, we found out the tilting train has very high efficiency(reduction rate 20-30%).

  • PDF

Railway Conflict Detection Design for KORAIL Command Center Intergration Signal Equipment Construction Project (철도청 사령실통합 신호설비 구축 프로젝트에서의 경합검지의 설계)

  • Lee Ju-Wang;Kim Bum-Sik;Bum Young-Hyun;Hong Hyo-Sik;Yoo Kwang-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1519-1525
    • /
    • 2004
  • 현재 사용되고 있는 열차운행관리 시스템(Railway Traffic Management System, RTMS)에서 경합 검지 및 해소업무는 역 및 선로의 정보(상태)연계 및 자동화의 미비로 인하여 착발선 결정, 착발시간 결정, 교행역, 대피역등에서 발생하는 경합 검지 및 해소(Railway Conflict Detection and Resolution)의 결정이 신속하게 이루어지지 못하고 있다. 본 논문은 국내외적으로 적용하고 있는 열차 경합 검지 방법을 조사 비교하여 가장 적절한 알고리즘을 개발, 구현하여 현재 진행중인 철도청 사령실 통합 신호설비 구축사업 프로젝트에 적용하고자 한다.

  • PDF

The Case Study for Application of Discord Management System In Railway Construction Projects (철도건설 사업 갈등관리체계 적용사례 연구)

  • Roh, Byoung-Kuk;Lim, Kwang-Man;Kim, Yong-Bae
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1514-1522
    • /
    • 2006
  • This study has described the case that has been experienced personally by centering on discords created in railway construction projects while performing practical duties at the construction field. Accordingly, as seen from the experience of performing one method called discord reconciliation conference, it seems that there are many parts to be improved on for the particular details because the conference was progressed by the position of a non professional in its content or procedure. But as seen from the word origin called "discord", looking at the state of finding one solution after another from vagueness of solving difficult and entangled problems, we could sense that the sincere communication and honesty was more progressive method in the phase of looking for one solution after another. Although this essay was centered on a typical case of railway construction project, I hope for it to spread throughout the whole society and especially hope that many discords created in public work sites such as public works would become settled smoothly between the parties concerned.

  • PDF

Development of Risk Analysis Method for Railway Facility Management (철도시설물 관리를 위한 리스크 분석기법 적용 방법론 연구)

  • Kang, Leen-Seok;Park, Seo-Young;Youn, Seon-Mi;Kim, Hyun-Soo
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.341-344
    • /
    • 2006
  • Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a web-based analysis system. In the first place for those researches, this study analyzes the present condition of risk management in the railway facility construction industry. Finally, this study defines risk management procedures as preparation, identification, analysis, response and risk analysis method to manage potential risks in the railway construction project.

  • PDF

The Design Of PSC U-Girder (Song-Lim Gyo) In Korean Railway (철도교량의 하로 PSC U거더교 설계적용사례)

  • Cho Sun-Kyu;Kwon Soon- Sup;Kim Sun-Kon;Lee Jong-Shin;Lee Jong-Min
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.545-551
    • /
    • 2006
  • Along with the steady development of Korean Railway construction technology, Contemporary society needs more modernized structures which can meet not only structural value but also aesthetic and environmental value. To follow this demand of society, Pre-Stressed Concrete U-girder bridge(Somg-Lim Gyo, L=330m) is introduced in 'JINJOO-KWANGYANG RAILWAY CONSTRUCTION PROJECT'. On the environmental point of view, the huge noise due to the operation of train can be reduced remarkably by the side beam of U-girder which is high enough to substitute soundproofing wall. Moreover, by aesthetic variation of the shape of outer beams and coping of piers, the exterior view of the bridge can be improved and in accordance with surroundings. Pre-Stressed Concrete U-Girders which are built up above the outer sides of slab deck make easier to secure the clearance of a bridge and make it possible to lower the distance of centroid between superstructure and railroad tracks.

  • PDF

Train Performance Simulation Program for Korea High Speed Railway System (한국형 고속전철 열차성능해석 프로그램)

  • 이태형;박춘수;신중린
    • Journal of the Korean Society for Railway
    • /
    • v.6 no.2
    • /
    • pp.100-107
    • /
    • 2003
  • This paper presents development of train performance simulation(TPS) program to analyze traction performance, braking performance and energy consumption for Korea high speed railway system. The conventional TPS program have some inconveniences such as DOS-based platform, user interface and limited function. The simulation technique model using scenario menu, various analysis function and object-oriented design/programming is presented. This simulation result have been compared with Alstom's for the Seoul-Pusan High Speed Rail Project.

Maglev(UTM-02) Brake System Change from Pneumatic Bake System to Hydraulic Brake System

  • Kim, Kinam;Hwang, Sungwoon;Jeon, Heekwon
    • International Journal of Railway
    • /
    • v.8 no.1
    • /
    • pp.30-34
    • /
    • 2015
  • The Maglev(UTM-02) project is leading by Korea Institute of Machinery & Materials and financially supported from the ministry of Commerce, Industry and Energy. The early development stagy of Maglev(UTM-02) was adopted the general urban railway pneumatic brake system due to the Korea domestic industrial environment. Currently there is two commercial operation Light Railway Train(LRT) system in Korea. One is U-Line in Uijungbu, and the other is Everline in Yongin. Both LRT systems are adopting high performance light weight hydraulic brake system. But those design and manufacturing core technology of the brake system is came from a major brake system companies located from aboard. Currently various studies have been continued to increase practical application and to improve competitiveness on performance for each sub-system of Maglev. Also in case of brake system, developing competitive hydraulic brake system is required. In this study, we have introduced the development process and performance evaluation of the new hydraulic brake system of Maglev.

Intermediate Storage Process required before Operation Site Installation of System (Focusing on the Rolling Stock of Railway System) (시스템의 운용 현장 설치 전 요구되는 중간 보관 프로세스 연구 (철도차량 중심으로))

  • Choi, Yo Chul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.16 no.2
    • /
    • pp.141-147
    • /
    • 2020
  • Due to the nature of the long-term project of a Railway business, Many problems have been arisen in the process of delivering products or systems verified by suppliers to the customer's operation site. Unexpectedly, it is often necessary for the verified products to store intermediately at the supplier's site for a variety of reasons, such as delays in business and delays in civil engineering, at the time of sending them to the customer's operation site. In this study, the intermediate storage process for finding and solving problems related to intermediate storage was presented focusing on the Rolling Stock of Railway System by reference to ISO/IEC/IEEE 15288:2015. A suitable intermediate storage process based on the developed product or system's characteristics will allow the verified products or systems to be placed on the customer's operation site and to meet the customer's product or system requirements.

The Train System Specification Development Using Systems Engineering Process (시스템엔지니어링 프로세스에 따른 열차시스템사양서 개발)

  • Han, Seong-Ho;Choe, Seong-Gyu;Lee, Jung-Yun
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.134-139
    • /
    • 2003
  • The mission of tilting train development project is enhancing the speed of transportation of railway passenger using existing infrastructure. The threat of this project is the tilting technology is newly incorporated to this project. To overcome the threat this project incorporate systems engineering technology to development tilting train system. The systems engineering process, which was used in this project, was performed in accordance with systems engineering standard EIA632. This paper shows the systems engineering technology which was used to develop the tilting train system specification. This paper also shows the requirement template which was developed to communicate and synthesis various specialty engineering.

  • PDF