• Title/Summary/Keyword: Railway Project

Search Result 574, Processing Time 0.028 seconds

A study on the Highspeed Railway Route Selection -Focusing on 4 design tools- (수도권 고속철도 노선선정 연구 -설계4공구를 중심으로-)

  • Kim, Jong-Seok;Kim, Woo-Je
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.200-207
    • /
    • 2011
  • The research which sees accomplishes the capital region high-speed railway and examines investigates about process of railroad construction project and an advance service contents from to understand a progress process, change process and technical investigation of basic design and the execution plan at the time of route led and accomplishes the plan which is detailed the process which in the center researched. Also plan start method and application plan, clear the security of the plan air which is proper is necessary and dividing which design phase is, plan process construction etc. improvements sacrifice froze.

  • PDF

Making Practical Use of Urban MAGLEV System : How to Perform the Feasibility Study (도시형 자기부상열차 실용화사업 타당성조사 추진방안)

  • Kim, Yeon-Gu;Kim, Hun
    • Proceedings of the KSR Conference
    • /
    • 2006.05a
    • /
    • pp.34-45
    • /
    • 2006
  • Making practical use of urban MAGLEV system which is tried by government includes technique development and railway construction. Because huge amount of money will be spent on this project, feasibility study is being carried out in order to check the feasibility and to devise the master plan in prior to making practical use of urban MAGLEV system. The key issues of feasibility study are possibility of technique development, economical feasibility, location of a model railway and the improvement of related laws and regulations. This paper shows the approach to solve these key issues.

  • PDF

The Establishment of Train Operation Plan in Railway System (철도시스템의 운전계획 수립)

  • 이동근;고영호;권정원
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.929-936
    • /
    • 2002
  • This paper presents a Rotem's methodology for the establishment of train operation plan in Railway system. Train operation plan is the key prior plan to proceed the design of the civil and E&M relevant subsystem. But, due to the limitation of the environmental and project condition, common consensus to the key factors which make up the operation plan have not been accomplished. So, as a result of this comparative review for the general approaching method of train operation plan and application status of the major key factors being performed by Rotem, we will get the opportunities to improve the accuracy of the train operation plan.

  • PDF

Review of Components Technology of the Prototype Test Train(HSR 350x) in Korea High Speed Railway (한국형 고속전철 시제차량(HSR 350x) 부품기술 현황)

  • Chung Kyung-Ryul;Kim Kyung-Taek;Lee Byung-Seok
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.461-466
    • /
    • 2003
  • This paper shows the review of the results of G7 project effort's according to analyze the components technology level of mechanical, electrical and communication fields of component industry. Additionally, propose a counterplan for commercialization of Korea high speed railway for the future.

  • PDF

Management of RAMS for Railway System in view of System Life Cycle (시스템 수명주기 관점에서의 철도시스템 RAMS 관리 방안)

  • Lee, Chang-Hwan;Park, Byoung-Noh;Ahn, Heon-Chan
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.221-225
    • /
    • 2011
  • The railway system consists of many items such as sub-systems, equipments and parts to accomplish the required function. Also the railway system is very complex system that these items are connected with interface among items. According with this complexity, the process of system engineering is applied to the construction of new railway project to manage systematically. In addition, the research about system engineering is progressing in recent. The RAMS management is one part of system engineering, and is to assure the required safety and performance. Also, this RAMS should be managed through system life cycle. This paper show the case study of management of RAMS during construction and operation phase in respect of system life cycle. As a result of this research, the best way of RAMS management based on system engineering in operation phase for railway system is suggested.

  • PDF

GHG & Energy Goal Management and Low Carbon Railway (온실가스.에너지목표관리와 저탄소 철도)

  • Lee, Cheul-Kyu;Kim, Yong-Ki;Park, Duk-Sin;Lee, Jae-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2961-2964
    • /
    • 2011
  • Greenhouse gas and energy reduction goal management system is announced to reduce national CO2 emission in 2011. The target business sector of the system has to follow the procedure of the system and get the assessment. The percentage of the national CO2 reduction goad is 30 % compared to the amounts of BAU. In railway business sector, 6 bodies are included in this system so that railway industry cannot stay and sustain its better position any more than other transportation industry. Most of the industry except Railway industry is struggling to develop its product more environmentally friendly and get the 3rd party certification like Eco-labelling and Carbon footprint. To get environmental certification, LCA method has to be applied because life cycle approach is needed to respond current environmental requirement. The purpose of this project is to facilitate railway vehicle manufacturer obtaining the environmental certification termed Korea EPD. By doing so, the environmental performance evaluation tool would be developed and modelled within the LCA framework and therefore applied especially for rail vehicle.

  • PDF

Exploring Delays of The Mega Construction Project: The Case of Korea High Speed Railway (대형 건설사업의 공기지연분석: 경부고속철도 건설사업을 중심으로)

  • Han, Seung Heon;Yun, Sung Min;Lee, Sang Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.839-848
    • /
    • 2006
  • Korea has become the 5th country to own and operate the high speed railroad in 2004. However, there were many difficulties until Koreans enjoy the first bullet train service with the average hourly speed of 300km. The high speed railroad requires elevated quality standards differently from the traditional railways. In addition to the technical difficulties, the construction project itself was an unpleasant case with huge delays and cost overruns mainly due to the lack of experiences, deficiency of owner$^{\circ}{\O}$s role, and increase of public resistances triggered by environmental concerns. This paper analyzes the reasons for delays on this mega-project. With respect to the characteristics of the whole project level, it is very complicated/linear project, whose total length is around 412 km with the composition of various sections in the route of the railway which have basically different conditions. For that reason, the analysis is performed in both macro and micro level. First, macroscopic analysis is performed to find critical subdivisions in the railway route that induces the significant delay in the opening due date. Then, microscopic analysis is followed to quantify the causes and effects of delays focused on these critical subdivisions in more detailed way. Finally, this paper provides lessons learned from this project to avoid the decisive delays in performing the similar large-scaled projects.

Study on the Key Technologies for Performance and Operation of the High-Speed EMU (동력분산형 고속철도 차량성능 및 운용 기반기술 연구)

  • Song, Dahl-H.;Min, Kyung-H.
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1227-1232
    • /
    • 2008
  • High-speed train of push-pull type called as G7 train has been developed and chosen as the model of KTX-II which will be operated on Honam Line nexr year. However, the EMU-type high-speed train appeared to be the recent trend that foreign markets have shown. Also, in the near future, a great number of new train sets are needed to accommodate the increased passengers in our country. Thus, development of the high-speed EMU was decided, planned, and started. In the development, included were almost all fundamental key technologies such as noise and vibration reduction in a passenger cabin, running characteristics, aerodynamic analysis, crashworthiness evaluation, EMI/EMC analysis, design of the cooling system for the propulsion control system, enhanced performance of transformer and switching converters, synchronous traction motor with permanent magnets, new design of front nose and ergonomic interiors, application of advanced information technology(IT) and smart sensors and the cost reduction of construction of railway bridges, etc. Each key technologies are carried out as sub-project independently but under the supervision of a project. The project will develop the high advanced level of technologies and provide necessary know-why's and support the team in charge of the development of the high-speed EMU, Hyundai Rotem Co. Ltd. The high-speed EMU will be successfully developed with the support of the project.

  • PDF

A Study on the Activation of PM/SE Business by Training LRT system Specialists (경량전철 전문가 양성을 통한 PM/SE 사업 활성화 방안 연구)

  • Choi, Sung-Hwan;Lee, Jong-Seong;Lee, Dae-Won;Lee, Gi-Su;Chung, Su-Young
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.458-464
    • /
    • 2008
  • The objective of this paper is to seek an alternative to figure out appropriate ways since difficulties lie in the introduction of LRT system to be operated by governments and self-governing local governments in the country. This situation can act as a main cause of breakdown in domestic railway industry by deepening of outflow of national wealth and technological dependency. Policy makers are required to get awareness of justification and necessity of Project management such as project strategy, goals, operating budgets, risks, investment revenue prior to preparing the outline of the introduction of LRT system shall consider securing budget in light of performance, reliability, and safety withe the help of system engineering activities during the entire project cycle such as design, construction, quality management, and commissioning before mapping out the basic plans for LRT project. In view of the current domestic conditions, the first time within the country, Seoulmetro is training professional as trust education of specialist training about LRT system, SE and PM education. This study leads to participating in PM/SE business by human power who finished from education of domestic specialist for LRT introduction corporation and businesses, it is published for introduction of specialist education and business revitalization.

  • PDF