The research which sees accomplishes the capital region high-speed railway and examines investigates about process of railroad construction project and an advance service contents from to understand a progress process, change process and technical investigation of basic design and the execution plan at the time of route led and accomplishes the plan which is detailed the process which in the center researched. Also plan start method and application plan, clear the security of the plan air which is proper is necessary and dividing which design phase is, plan process construction etc. improvements sacrifice froze.
Making practical use of urban MAGLEV system which is tried by government includes technique development and railway construction. Because huge amount of money will be spent on this project, feasibility study is being carried out in order to check the feasibility and to devise the master plan in prior to making practical use of urban MAGLEV system. The key issues of feasibility study are possibility of technique development, economical feasibility, location of a model railway and the improvement of related laws and regulations. This paper shows the approach to solve these key issues.
This paper presents a Rotem's methodology for the establishment of train operation plan in Railway system. Train operation plan is the key prior plan to proceed the design of the civil and E&M relevant subsystem. But, due to the limitation of the environmental and project condition, common consensus to the key factors which make up the operation plan have not been accomplished. So, as a result of this comparative review for the general approaching method of train operation plan and application status of the major key factors being performed by Rotem, we will get the opportunities to improve the accuracy of the train operation plan.
This paper shows the review of the results of G7 project effort's according to analyze the components technology level of mechanical, electrical and communication fields of component industry. Additionally, propose a counterplan for commercialization of Korea high speed railway for the future.
The railway system consists of many items such as sub-systems, equipments and parts to accomplish the required function. Also the railway system is very complex system that these items are connected with interface among items. According with this complexity, the process of system engineering is applied to the construction of new railway project to manage systematically. In addition, the research about system engineering is progressing in recent. The RAMS management is one part of system engineering, and is to assure the required safety and performance. Also, this RAMS should be managed through system life cycle. This paper show the case study of management of RAMS during construction and operation phase in respect of system life cycle. As a result of this research, the best way of RAMS management based on system engineering in operation phase for railway system is suggested.
Greenhouse gas and energy reduction goal management system is announced to reduce national CO2 emission in 2011. The target business sector of the system has to follow the procedure of the system and get the assessment. The percentage of the national CO2 reduction goad is 30 % compared to the amounts of BAU. In railway business sector, 6 bodies are included in this system so that railway industry cannot stay and sustain its better position any more than other transportation industry. Most of the industry except Railway industry is struggling to develop its product more environmentally friendly and get the 3rd party certification like Eco-labelling and Carbon footprint. To get environmental certification, LCA method has to be applied because life cycle approach is needed to respond current environmental requirement. The purpose of this project is to facilitate railway vehicle manufacturer obtaining the environmental certification termed Korea EPD. By doing so, the environmental performance evaluation tool would be developed and modelled within the LCA framework and therefore applied especially for rail vehicle.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.5D
/
pp.839-848
/
2006
Korea has become the 5th country to own and operate the high speed railroad in 2004. However, there were many difficulties until Koreans enjoy the first bullet train service with the average hourly speed of 300km. The high speed railroad requires elevated quality standards differently from the traditional railways. In addition to the technical difficulties, the construction project itself was an unpleasant case with huge delays and cost overruns mainly due to the lack of experiences, deficiency of owner$^{\circ}{\O}$s role, and increase of public resistances triggered by environmental concerns. This paper analyzes the reasons for delays on this mega-project. With respect to the characteristics of the whole project level, it is very complicated/linear project, whose total length is around 412 km with the composition of various sections in the route of the railway which have basically different conditions. For that reason, the analysis is performed in both macro and micro level. First, macroscopic analysis is performed to find critical subdivisions in the railway route that induces the significant delay in the opening due date. Then, microscopic analysis is followed to quantify the causes and effects of delays focused on these critical subdivisions in more detailed way. Finally, this paper provides lessons learned from this project to avoid the decisive delays in performing the similar large-scaled projects.
High-speed train of push-pull type called as G7 train has been developed and chosen as the model of KTX-II which will be operated on Honam Line nexr year. However, the EMU-type high-speed train appeared to be the recent trend that foreign markets have shown. Also, in the near future, a great number of new train sets are needed to accommodate the increased passengers in our country. Thus, development of the high-speed EMU was decided, planned, and started. In the development, included were almost all fundamental key technologies such as noise and vibration reduction in a passenger cabin, running characteristics, aerodynamic analysis, crashworthiness evaluation, EMI/EMC analysis, design of the cooling system for the propulsion control system, enhanced performance of transformer and switching converters, synchronous traction motor with permanent magnets, new design of front nose and ergonomic interiors, application of advanced information technology(IT) and smart sensors and the cost reduction of construction of railway bridges, etc. Each key technologies are carried out as sub-project independently but under the supervision of a project. The project will develop the high advanced level of technologies and provide necessary know-why's and support the team in charge of the development of the high-speed EMU, Hyundai Rotem Co. Ltd. The high-speed EMU will be successfully developed with the support of the project.
The objective of this paper is to seek an alternative to figure out appropriate ways since difficulties lie in the introduction of LRT system to be operated by governments and self-governing local governments in the country. This situation can act as a main cause of breakdown in domestic railway industry by deepening of outflow of national wealth and technological dependency. Policy makers are required to get awareness of justification and necessity of Project management such as project strategy, goals, operating budgets, risks, investment revenue prior to preparing the outline of the introduction of LRT system shall consider securing budget in light of performance, reliability, and safety withe the help of system engineering activities during the entire project cycle such as design, construction, quality management, and commissioning before mapping out the basic plans for LRT project. In view of the current domestic conditions, the first time within the country, Seoulmetro is training professional as trust education of specialist training about LRT system, SE and PM education. This study leads to participating in PM/SE business by human power who finished from education of domestic specialist for LRT introduction corporation and businesses, it is published for introduction of specialist education and business revitalization.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.