• 제목/요약/키워드: Railroad-tunnel

검색결과 233건 처리시간 0.024초

강체 전차선로이행구간 고속화 방안 연구 (A Study on Speed-up of a Transition Section Between Overhead Catenary and Rigid Conductor System)

  • 이기원;최태수;조용현;박영;전효찬;최규형
    • 전기학회논문지
    • /
    • 제67권3호
    • /
    • pp.467-473
    • /
    • 2018
  • R-Bar(Overhead Rigid Conductor system) is being developed for the high-speed in Europe because it has an advantage of cross section area reduction of tunnel compared with OCS (Overhead Catenary Line). Because there are lots of underground sections and mountains in korea, it is necessary to develop the R-Bar for a high-speed line. In this study, a method on speed-up of transition section between OCS and R-Bar is proposed. The commercial program, DAFUL, is used to predict a dynamic characteristics between Overhead Line and pantograph. The program is evaluated according to EN 50318 which is the European Norm for evaluation of the program. Using the evaluated modeling and method, a method for the max. speed of 250 km/h of transition section is proposed.

열차객실감시시스템의 제한된 무선 대역폭에서의 최적의 서비스모델에 대한 연구 (Study on optimum service model of passenger car monitoring system at limited wireless bandwidth)

  • 정상국;최갑봉;안태기;김백현;양동석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.199-201
    • /
    • 2008
  • In this paper, We studied optimum service model of passenger car monitoring system at limited wireless bandwidth subway and railway. High bandwidth is better if we need more services. But, high bandwidth requires more cost at tunnel of subway. More bandwidth make receive sensitivity to bad. We deduced best bandwidth of subway wireless transmission system reflecting the cost of installation and efficiency of system. Consequently, we decide efficient service model of passenger car monitoring system.

  • PDF

도플러 보정을 통한 고속열차 현장 측정 소음 분석 (Analysis of Field Noise from High Speed Train Using Dedopplerization)

  • 이용우;이덕주;권혁빈;윤수환
    • 한국소음진동공학회논문집
    • /
    • 제23권5호
    • /
    • pp.431-437
    • /
    • 2013
  • Measured acoustic signal from operating high speed train contains frequency change called doppler shift due to its motion. To avoid this doppler shift wind tunnel test is required. But scaledown of model can cause change of source characteristics. And measurements using some part of train cannot reproduce real flow condition. The best way to recognize real noise source characteristics is measurement from operating high speed train but doppler shift makes it hard. So, we developed simple dedopplerization technique for one microphone and applied to field test data of high speed train. Through this, we could capture real frequency of noise from operating high speed train.

VE-LCC 분석을 통한 철도의 최적노선 선정방안 연구 (A Study on the Selection of the Optimum Railroad Line using VE-LCC Analysis)

  • 신태균;손석구;이승훈;구교진;현창택
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 춘계학술대회 논문집
    • /
    • pp.315-320
    • /
    • 2003
  • Selecting a railroad line requires the comparative evaluation of various elements. As a systematic approach to this selection it will be necessary to apply the VE study and the LCC analysis. This study proposes a methodology for selecting the optimum line of the ralroad using VE-LCC analysis. The VE study is performed by following four steps : Information analysis, Function analysis, Alternative evaluation, and Optimum plan selection. The economics evaluation in VE study is using LCC analysis and Sensitivity analysis. Cost items in LCC analysis are classified into bridge, tunnel, rail, and earthwork. We could select the optimum alte-rnatives considering not only cost elements hut also various evaluation element in VE-LCC analysis. The synthetic evaluation process of relative value composition and weighted matrix evaluation

  • PDF

다양한 지반 및 지진하중 조건을 고려한 해저철도 터널의 동적 수치모델 분석 (Analysis on dynamic numerical model of subsea railway tunnel considering various ground and seismic conditions)

  • 곽창원;박정준;유민택
    • 한국터널지하공간학회 논문집
    • /
    • 제25권6호
    • /
    • pp.583-603
    • /
    • 2023
  • 최근 기계식 터널 굴착기술의 발전과 수압을 받는 해저철도 터널의 특성 상 쉴드TBM 공법이 해저철도 터널 설계 및 시공에 널리 적용되고 있다. 해저철도 터널은 일반적인 지중응력상태에서 거동하지 않고 외부 수압이 상시재하되는 상태이며 지진 시 지진파의 증폭에 의한 영향을 받게 된다. 특히 연약지반, 연약토사-암반 복합지반, 단층파쇄대 등 다양한 지반조건 하에서 작용하는 지진하중은 터널 변위 및 지보재 응력의 급격한 변화를 초래하여 터널 안전성에 큰 영향을 미친다. 또한 지진하중의 주기특성, 지진파형, 최대가속도 등의 재하조건에 따라 지반 및 터널의 동적 응답이 달라지며 이는 지반조건과 결합하여 더욱 복잡한 지반-터널 구조물계의 거동을 보여주게 된다. 본 연구에서는 해저철도 터널의 동적거동 평가를 위하여 수압을 고려하여 지반-터널 구조물계 전체를 유한차분해석 기법으로 모델링 하고 상호 지진 시 구조물 응답을 분석하였다. 해저철도 터널의 지진 시 동적 거동에 영향을 미치는 주요 인자는 지반조건과 지진파이므로 가상 지반조건에 따라 총 6가지의 해석 Case를 설정하였다. 가상 지반조건은 해석 대상영역의 지반이 모두 토사(풍화토)인 경우(Case-1), 모두 암반(경암)인 경우(Case-2), 터널 진행방향(종방향)으로 토사와 암반의 복합지반인 경우(Case-3), 암반 내 폭이 상대적으로 좁은 파쇄대(w = 2.0 m)를 터널이 통과하는 경우(Case-4), 터널 진행방향(종방향)으로 연약토사와 암반의 복합지반인 경우(Case-5), 암반 내 폭이 상대적으로 넓은 파쇄대(w = 10.0 m)를 터널이 통과하는 경우(Case-6)으로 구분하여 각각 모델링을 수행하였다. 해석 결과 지진에 의한 수평변위는 지반물성 증가에 따라 커지는 경향을 나타내었으나 주변 지반의 구속효과와 강성 세그먼트로 결합된 쉴드터널 구조물의 특성으로 인하여 다소 억제되는 경향도 함께 관찰되었다. 세그먼트의 부재력은 변위 발생 경향과는 달리 지반 강성이 약할수록 현저히 증가하는 경향을 나타내었으며 오히려 변위 억제 효과에 따른 부재력 증가가 뚜렷하게 관찰되는 특성을 확인하였다.

이동하중에 의한 지지강성 변화구간에 대한 실험적 연구 (Experimental Study of Stiffness transition zone by using Moving Wheel Loads)

  • 이진욱;최찬용;이성혁;박태환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1056-1061
    • /
    • 2007
  • Railroad roadbed was consisted into structure types that earthwork, tunnel, bridge and joint sections. Joint section was affected a large factor confidence and safety of the train running by stiffness transition zone that track substructure stiffness change section as like between tunnel and earthwork from ballast track to concrete track. These problems are the results of increased dynamic wheel loads, which also lead to wear and tear on vehicle components and contribute to poor ride quality. The study presented in this paper was conducted on model test by using Wheel Moving Loading System.

  • PDF

철도 시설 및 차량 분야 사고 발생에 따른 비상대응 설비 환경 분석 연구 (A Study on emergency equipments for accidents of rail infrastructure and rolling-stock)

  • 양도철;서영민
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1817-1823
    • /
    • 2007
  • In this study, we have studied rail infrastructure related to emergency action to manage the risk when emergency caused by faults of facility or rail vehicle during operation happens. Especially we have compared the effect of emergency action with examining the structure of vehicle, tunnel, bridge and access road, etc which are related to emergency action. Also, we have tried to analyze effects of radio and communication equipment, lifesaving and refuge which could be used for rolling stock, station, control room, tunnel, bridge and etc, and we have presented the way of reporting the emergency to the train driver or crew, control room, outside networks which could be used by passengers in vehicle, station, railroad line. Based on these, we have analyzed the conduct of emergency action in length of time when emergency happens in railway and high-speed railway, and studied the method of which passengers could be guided safely and escape from the scene of the accident.

  • PDF

전기철도 시스템에서의 터널, 교량구간 접지방안 연구 (A Study on the Electric Railroad Grounding System of Tunnels and Bridges)

  • 윤응규;오광해;오기봉
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.559-565
    • /
    • 2002
  • This paper presents a standard grounding scheme for bridge and tunnel areas where earthing wires cannot be easily buried. Specially, a new grounding method in which structure grounding devices are used shows good grounding effects like the earthing-wire grounding scheme. The proposed method can be a measure for equal potential in case earthing cables are disconnected.

  • PDF

지하철 및 철도 구간에서의 효율적인 지상파DMB 인프라 구축방안 (Efficient Solution for deployment of T-DMB Infra at Subway and Railroad)

  • 김형원;최광호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.616-623
    • /
    • 2006
  • As we have understood the commonly launched T-DMB service from December 2005, we kindly recommend to apply LCX cable installing solution which can be covering underground subway and tunnel T-DMB signal shadow area with most efficient network implementation method. Subway passengers would be enjoyable continuous T-DMB services through LCX cable installing solution.

  • PDF

강관압입후 슬롯 홀을 갖는 비개착 터널공법의 현장적용에 관한 연구 (A Study on Sites Application of Non-open-cut Tunnel Method with Slot Holes in Steel Pipe Pumping)

  • 채영석;송관권;민인기
    • 한국안전학회지
    • /
    • 제30권1호
    • /
    • pp.47-51
    • /
    • 2015
  • In the study, a new non-open cut tunnel steel pipe method using slot hole has been developed. As is overcomes shortcomings of conventional methods, it is applied to the field. The main concept of the new method is the steel pipe pumping system with slot holes which, by means of formation slot holes between each steel pipe, applied to the magnitude of the relaxed earth pressure caused by excavation to the ground to prevent ground displacement. The stability of the support members and effect of displacement control of the new method were verified through several ways as numerical analysis and site test. The new method was applied to the construction of a 11.5m wide, 7.4m high and 50m long section that passes side subway and large buildings in inner city. By applying the new method, tunnel construction was successfully completed in 6 months. It decreases the construction period to 30% compared to that of conventional methods, and ground was almost negligible.