• Title/Summary/Keyword: Rail container terminal

Search Result 49, Processing Time 0.023 seconds

A Study on the Wedge Angle of the Rail Clamp according to the Design Wind Speed Criteria Change

  • Lee Jung-Myung;Han Dong-Seop;Han Geun-Jo;Jeon Young-Hwan
    • Journal of Navigation and Port Research
    • /
    • v.29 no.7
    • /
    • pp.641-646
    • /
    • 2005
  • In cargo-working, it unavoidably happens that the quay crane slip along the rail and the container move from side to side. Especially, they involve a lot of risk in bad weather. The rail clamp is a mooring device to prevent that the quay crane slips along the rail due to bad weather or the wind blast while the quay crane do the cargo-working And it will play a greater role in port container terminal integration and automation To design the wedge type rail clamp, it is very important to determine the wedge angle. In this study, we expect that the design wind speed of the quay crane will change over 16m/s. Assuming that the design wind speed is 40m/s, we determined the proper wedge angle of the wedge type rail clamp for the 50ton class quay crane.

A Study on the Assigning Track of Freight Trains in a Rail Container Terminal (철도 터미널 화물열차 작업선배정에 관한 연구)

  • Kim, Kyung-Min;Park, Bum-Hwan;Kim, Dong-Hee;Hong, Soon-Heum
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1209-1214
    • /
    • 2010
  • In these days, rail container service is being more important because it has relatively simple network. In addition, small lot sizes of shipment, frequent shipment, and demand for flexible service are important characteristics in rail container transportation. Efficient container operation at terminals is important in reducing transportation costs and load/unload time. This paper describes the assigning track of freight trains in the railway freight terminal. The paper addresses the operational requirements and facility restrictions to construct a mathematical model for track assignment. In addition, it suggests several types of objectives for the model.

  • PDF

A Study of Comparison with the Operating Priority Rules of RMGC on Semi-Automated Container Terminal (반자동화 컨테이너터미널의 RMGC 운영방식 비교 분석)

  • Kim, Chan-Ho;Ha, Tae-Young;Yang, Hong-Suk
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.35 no.2
    • /
    • pp.1-17
    • /
    • 2010
  • This paper aims to compare four operating priority rules of RMGC (Rail Mounted Gantry Crane) used in semi-automated container terminal. The four priority rules employed in this paper are FCFS (First-come-first-served), LCFS (Last-come-first-served), TOS (Turn-over-served) and NFS (Nearest-first-served). And to compare the four operating priority rules, this paper analyzed productivity of RMGC and CC (Container Crane), waiting time of YT (Yard Truck) and RT (Road Truck) in container yard, and turnaround time of RT in container terminal of each priority rule by using stevedoring simulation. As a result, NFS was evaluated as the best rule to improve the overall productivity of container terminal in terms of all criteria.

A Study on Acceleration Characteristics for Automated Rail Mounted Crane (자동화크레인의 가속도 특성에 관한 연구)

  • Kim, Hwan-Seong;Kim, Myeong-Kyu;Tran Ngoc, Hoang Son
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2009.10a
    • /
    • pp.215-216
    • /
    • 2009
  • By growing the capacity of container in the world, main container terminal in countries introduces the automated container equipments and try to improve the productivity for handling the container. ARMC(Automated Rail Mounted Crane) is installed in automated container terminal and expected the high efficiency of productivity by using minimum-time control method. However recently by the GREEN Port policy, high energy efficiency method for container equipments is importance issue in ports. In this paper, the 3-dimensional modelling of AMRC is discussed and the acceleration characteristics for ARMC is analyzed By using the results of this paper, the advanced controller for the crane will be developed in future.

  • PDF

A Study on Rail Crane Scheduling Problem at Rail Terminal (철송 크레인 일정계획문제에 관한 연구)

  • Kim, Kwang-Tae;Kim, Kyung-Min;Kim, Dong-Hee
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.269-276
    • /
    • 2011
  • This paper considers the rail crane scheduling problem with minimizing the sum of the range of order completion time and make-span of rail crane simultaneously. The range of order completion time implies the difference between the maximum of completion time and minimum of start time. Make-span refers to the time when all the tasks are completed. At a rail terminal, logistics companies wish to concentrate on their task of loading and unloading container on/from rail freight train at a time in order to increase the efficiency of their equipment such as reach stacker. In other words, they want to reduce the range of their order completion time. As a part of efforts to meet the needs, the crane schedule is rearranged based on worker's experience. We formulate the problem as a mixed integer program. To validate the effectiveness of the model, computational experiments were conducted using a set of data randomly generated.

  • PDF

Deployment of Yard Cranes Considering Storage Plans in Container Terminals (컨테이너 터미널에서 장치계획을 고려한 야드 크레인 배치 문제)

  • Won, Seung-Hwan;Kim, Kap-Hwan
    • Journal of Navigation and Port Research
    • /
    • v.33 no.1
    • /
    • pp.79-90
    • /
    • 2009
  • The main function of a container terminal is to load container freights into vessels and discharge them from vessels. The container terminal needs to utilize its resources effectively in order to improve the productivity of it. This study deals with the deployment model for yard cranes whose type is RMGC (rail mounted gantry crane). We develop a mathematical model for the deployment of yard cranes. The model considers not only the deployment but also the storage plans. It could be divided into two cases according to whether inter-block movements of yard cranes are allowed or not, during the same period Numerical examples are solved and analyzed to validate the model. Then, additional experiments are performed to compare the performance of the model with that of a previous model without the re-deployment of yard cranes.

A Simulation Study on the Deadlock of a Rail-Based Container Transport System (레일기반 컨테이너 이송 시스템의 교착에 관한 시뮬레이션 연구)

  • Seo, Jeong-Hoon;Yi, Sang-Hyuk;Kim, Kap-Hwan
    • Journal of Navigation and Port Research
    • /
    • v.42 no.1
    • /
    • pp.47-56
    • /
    • 2018
  • In this study, the focus is on the issue of whether a container terminal is facing the limitation of its productivity for serving mega-vessels with numerous containers. In order to enhance the terminal operations, a new conceptual design of the container handling system have been proposed. This research focuses on the rail-based container transport system and its operations. This system consists of rail-based shuttle cranes and rail-based transporters called flatcars. The deadlock problem for managing automated transporters in container terminals has been an important issue for a long measurement of time. Therefore, this study defines the deadlock situation and proposes its avoidance rules at the rail-based container transport system, which is required to handle numerous container throughput operations. The deadlock in the rail-based container transport system is classified into two parts: deadlock between cranes and flatcars; deadlock between flatcars. We developed the simulation model for use with characterizing and analyzing the rail-based container transport system. By running the simulation, we derived possible deadlock situations, and propose the several deadlock avoidance algorithms to provide results for these identified situations. In the simulation experiments, the performances of the deadlock avoidance algorithms are compared according to the frequency of deadlocks as noted in the simulations.

Architectural Design of Terminal Operating System for a Container Terminal Based on a New Concept

  • Singgih, Ivan Kristianto;Jin, Xuefeng;Hong, Soondo;Kim, Kap Hwan
    • Industrial Engineering and Management Systems
    • /
    • v.15 no.3
    • /
    • pp.278-288
    • /
    • 2016
  • Automation ensures accurate and well-organized container transportation in container terminals. This paper addresses operational issues such as equipment scheduling and the coordination between various pieces of equipment in a rail-based automated container terminal. Containers are relayed using multiple types of equipment from road trucks to a vessel and vice versa. Therefore, handshaking is required during a container transfer between different pieces of equipment. Synchronization between the schedules of all the equipment is important to reduce equipment waiting times and the time required for transporting containers, which results in a short turnaround time for a vessel. This paper proposes an integrated control system with the objective of synchronizing the operations of different types of equipment, provides a list of decisions to be made by the control module of each type of equipment, and shows all the required information transfers between control modules. A scheme for the integrated scheduling of multiple types of equipment is proposed. The decisions made by each control module in a real-time fashion are listed with detailed explanations, and the information transfer between managers in a real-time situation at the proposed terminal is described.

Crane Scheduling Considering Tenant Service Time in a Rail-Road Transshipment Yard : Case of the Uiwang ICD (철도-육상트럭 환적지에서의 입주사 작업시간을 고려한 크레인 적하작업 스케줄링 : 의왕ICD 사례)

  • Kim, Kwang-Tae;Kim, Hyo-Jeong;Son, Dong-Hoon;Jang, Jin-Myeong;Kim, Hwa-Joong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.238-247
    • /
    • 2018
  • This paper considers the problem of scheduling loading and unloading operations of a crane in a railway terminal motivated from rail-road container transshipment operations at Uiwang Inland Container Depot (ICD). Unlike previous studies only considering the total handling time of containers, this paper considers a bi-criteria objective of minimizing the weighted sum of the total handling time and tenant service time. The tenant service time is an important criterion in terms of terminal tenants who are private logistics companies in charge of moving containers from/to the terminal using their trucks. In the rail-road container shipment yard, the tenant service time of a tenant can be defined by a time difference between beginning and finishing loading and unloading operations of a crane. Thus, finding a set of sequences and time of the crane operations becomes a crucial decision issue in the problem. The problem is formulated as a nonlinear program which is improved by linearizing a nonlinear constraint in the model. This paper develops a genetic algorithm to solve the problem and performs a case study on the Uiwang ICD terminal. Computational experiment results show that the genetic algorithm shows better performance than commercial optimization solvers. Operational implications in terms of tenants are drawn through sensitivity analyses.

A Study on Wedge Angles of Wedge-type Rail Clamp for Preventing Jaw from Rotating (쐐기형 레일 클램프에서 조(jaw)의 회전을 방지하기 위한 적정 쐐기각에 대한 연구)

  • Shim J. J.;Lee S. W.;Han D. S.;Park J. S.;Jeon Y. H.;Lee H.;Han G. J.;Ahn C. W.
    • Journal of Navigation and Port Research
    • /
    • v.29 no.8 s.104
    • /
    • pp.735-740
    • /
    • 2005
  • In this paper, we designed a wedge type rail-clamp which can protect container crane from sudden wind blast with constant clamping force regardless of the operating period. When we design wedge type rail clamp, it is important to determine an angle of wedge which prevent rotating of jaw and for smooth operation when wind blows. Therefore, this paper suggest a process to decide an angle of wedge within proper range obtained by experimental analysis as well as FEA of the wedge type rail clamp. A model with $6^{\circ}$ wedge angle is the most proper model to use in rail clamp bemuse it generated satisfactory clamping force and rotating angle underdesign specification.