1 |
Linn, R. and Zhang, C. Q.(2003), "A heuristic for dynamic yard crane deployment in a container terminal", IIE Transactions, Vol. 35, No.2, pp. 161-174
DOI
ScienceOn
|
2 |
Zhang, C., Wan, Y. W., Liu, J., and Linn, R. J.(2002), "Dynamic crane deployment in container storage yards", Transportation Research Part B, Vol. 36, No.6, pp. 537-555
DOI
ScienceOn
|
3 |
Chung, R. K, Li, C. L., and Lin, W(2002), "Interblock crane deployment in container terminals", Transportation Science, Vol. 36, No.1, pp. 79-93
DOI
ScienceOn
|
4 |
Lee, B. K. and Kim, K H(2007), "Cycle time models for yard cranes considering block layouts in container terminals", Journal of the Korean Institute of Industrial Engineers, Vol. 33, No.1, pp. 110-125
|
5 |
Won, S. H and Kim, K H(2009), "Yard planning considering the load profile of resources in container terminals", Journal of the Korean Institute of Industrial Engineers, Vol. 35, No.1, pp. 58-72
|
6 |
Linn, R., Liu, J. Y, Wan, Y. W, Zhang, c., and Murty, K G.(2003), "Rubber tired gantry crane deployment for container yard operation", Computers and Industrial Engineering, Vol. 45, No.3, pp. 429-442
DOI
ScienceOn
|