• Title/Summary/Keyword: Rail bending stress

Search Result 30, Processing Time 0.03 seconds

The Prediction Equation for Bending Stress of Rail in Concrete Track by the Linear Multiple Regression Analysis (중회귀분석을 통한 콘크리트궤도 레일 휨응력 예측식)

  • Sung, Deok-Yong;Lim, Hyoung-Jun;Lee, Dong-Wook;Kim, Bag-Jin;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.315-323
    • /
    • 2010
  • It is suggested that the service life of the continuous welded rail(CWR) is estimated by the relationship between the rail surface irregularity according to the accumulated passing tonnage and bending fatigue of welded part in CWR. In this study, it measured bending stress of rail according to the rail surface irregularity in the concrete track on the Seoul Metro. In addition, the relationship between rail surface irregularity and bending stress in concrete track is analyzed by results of the field test. Finally, this study clarified the relationship among bending stress(Y) of rail, train speed(U), rail surface irregularity(v, w) in concrete track. The result of this study is able to use the basis data to establishing the periodic replacements criterion of CWR.

  • PDF

The Fatigue Life Evaluation of CWR based on the Rail Grinding (레일연마를 고려한 장대레일의 피로수명 평가)

  • Kong, Sun-Young;Sung, Deok-Yong;Park, Yong-Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.5
    • /
    • pp.1191-1198
    • /
    • 2015
  • In this study, vehicle/track interaction analysis by the Saemaul powered vehicle was carried out. The prediction equation for the bending stress of rail was estimated using the rail bending stress by the rail surface irregularities at welds. Also, the fatigue analysis using a S-N curve of welds in the conventional railway was carried out. We estimated the fatigue life of CWR by the fracture probability. By the rail grinding, the fatigue life of CWR was evaluated in consideration to reduce the rail bending stress through removing the rail surface irregularities. Therefore, it presented the fatigue life of CWR according to the rail grinding execution plan in the conventional railway.

Estimation of Bending Fatigue Life of CWR in Concrete Track (콘크리트궤도 장대레일의 휨 피로수명 평가)

  • Sung, Deok-Yong;Tae, Sung-Sik;Park, Kwang-Hwa;Kong, Sun-Yong;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.64-71
    • /
    • 2010
  • It is suggested that the service life of the continuous welded rail(CWR) is estimated by the relationship between the rail surface irregularity according to the accumulated passing tonnage and bending fatigue of welded part in CWR. In this study, based on the results of bending fatigue tests of rail and results of measuring tests in situ of rail bending stress, this study estimated the bending fatigue life of welded rail in concrete track, adopting a Haibach's rule. The bending fatigue life of CWR considered the rail surface irregularity, train speed and the S-N curve by types of rail welding. In addition, this study estimated it for the fracture probability 1%, 0.1%, 0.01%. Therefore, this study proposed bending fatigue life of CWR in concrete track.

  • PDF

Evaluation of Rail Fatigue and Bending Fatigue Considering Concrete Track Condition (콘크리트도상(STEDEF)의 선로조건을 고려한 레일휨응력 예측과 피로수명 산출)

  • Lee, Soo-hyung;Kang, You-song;Park, Yong-gul
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.5
    • /
    • pp.658-667
    • /
    • 2017
  • Rail is the main track component, playing the most important role in safe railways. For the sake of safety, it is strictly required to secure reliability against fatigue and destruction of rail. In this paper, by field measurement on concrete track, it is confirmed that the rail surface roughness and rail bending stress are linearly correlated with each other; the bending stress of rail can be presented as a function of train speed, track support stiffness, and rail surface roughness. The fatigue life of rail can be estimated by deriving the S-N curve through the fatigue test.

The Fatigue Life Evaluation of Rail on the Concrete Track of High Speed Railway by Analysis of the Vehicle/Track Interaction (차량/궤도 상호작용해석을 통한 고속철도 콘크리트궤도 레일의 피로수명 예측)

  • Lim, Hyoung-Jun;Sung, Deok-Yong;Park, Yong-Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.663-671
    • /
    • 2012
  • The demand of CWR is rapidly increasing because of the adaptation of concrete track, the need for rapid and comfortable ride, and the reduction of maintenance cost. Because of short applying period of the concrete track, there is not a case of CWR fracture in Korea caused by repeated load of the train, which makes it difficult to calculate replacement period of rail based on rail fatigue life using an actual field data. This study thus inspected the bending stress at rail bottom through analyzing the vehicle/track interaction, performed multiple regression analysis on the data, deducted the bending stress prediction equations by the speed and the surface irregularity. Finally, the fatigue life of CWR on the concrete track was predicted based on the prediction equations for bending stress at rail bottom.

An Experimental Study on Causes Evaluation of Rail Corrugation for Concrete track(STEDEF) in Urban Transit (도시철도 콘크리트궤도(STEDEF)의 레일파상마모 발생원인 분석을 위한 실험적 연구)

  • Choi, Jung-Youl;Gong, Hyung-Sik;Kim, Jun-Hyung;Kim, Hak-Seon;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.4 no.4
    • /
    • pp.413-418
    • /
    • 2018
  • The purpose of this study is to investigate the cause of rail corrugation and the track force for concrete track (STEDEF) in the urban transit. From the field measurements, the dynamic wheel load, vertical displacement of sleeper and rail bending stress were measured and it was evaluated by regarding to the rail corrugation. As a result of the study, the causes of rail corrugation was experimentally proved by frequency analysis using measured dynamic wheel load data. The influence of corrugation on dynamic wheel load, rail bending stress and sleeper displacement was evaluated that the periodic irregularities of rail corrugation on the rail surface amplified the dynamic track force such as the dynamic wheel load, and thus the rail bending stress and the vertical displacement of sleeper could be increased by a maximum of 1.7 times.

Investigation of the Maintenance Criteria for the Rail Surface Defects in High-Speed Railways (고속철도 레일 표면 결함 관리기준에 관한 연구)

  • Yang, Sin-Chu;Jang, Seung-Yup
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.6
    • /
    • pp.535-544
    • /
    • 2011
  • The rail surface defects can cause the high impact load on the track and lead to the progress of the rail fatigue damage and the rail break. In case of the rail break, there is a great deal of risk for derailment, and thus the maintenance criteria for the rail surface defects are of great importance. In this study, using the dynamic train-track interaction analysis program, the impact wheel loads and rail bending stresses according to the depths of the surface defects have been calculated with the input data of the rail surface irregularities measured at 43 spots with surface defects in the ballasted track of high-speed railway. Considering the irregularity of track geometry, the allowable limits of wheel load and rail bending stress have been set, and the maintenance criteria for the rail surface defects was suggested by analyzing the relationship of the maximum values of wheel load and rail bending stress versus depth and width of rail surface defect. The analysis results suggest that the allowable depth of the surface defect is determined approximately 0.2mm from the limit of the impact wheel load.

Evaluation of Field Calibration Test on Rail for Train Wheel Force Measurement

  • Sim, Hyoung-Bo;Yeo, Inho
    • International Journal of Railway
    • /
    • v.8 no.1
    • /
    • pp.1-4
    • /
    • 2015
  • An accurate measurement of the train-track interaction forces is important for track performance evaluation. In the field calibration test as a wheel load measurement process, the calibration system creates a different boundary condition in comparison with that in the train wheel passage. This study aims to evaluate a reliability of the field calibration test in the process of wheel load measurement. Finite element models were developed to compare the deformed shapes, bending moment and shear force profiles on the rail section. The analysis results revealed that the deformed shapes and their associated bending moment profiles on the rail are significantly different in two numerical simulations of the calibration test and the train wheel load passage. However, the shear stress profile on the rail section of the strain gauge installation in the field was almost identical, which may imply that the current calibration test is sufficiently reliable.

Bending Fatigue Life Assessment of Aged CWR using the Field Test (현장측정을 통한 노후레일의 휨 피로수명 평가)

  • Park, Yong-Gul;Sung, Deok-Yong;Park, Hong-Kee;Kong, Sun-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.3
    • /
    • pp.317-325
    • /
    • 2008
  • As a result of recent research, it is reported that the periodic replacements criterion of rails is able to extend as grinding rail surface and using the continuous welded rail (CWR). This study evaluated correlation between conditions of track and load capacity of rail by analysing the dynamic response of track while the metro train is running. Also, it was converted the measured stress waveform into stress frequency histogram by the rain-flow counting methods, and then accumulated fatigue damage ratio and remaining service life of laid rail were calculated so as the apply the equivalence of stress to S-N curve of a new welded rail. Finally, this study suggests a revision of the periodic replacements criterion of CWR, which was based on accumulated passing tonnage, classified by the types and conditions of track system.

Review on the Allowable Sleeper Spacing at a Bridge Expansion Joint (교량 신축부 허용 침목간격 검토)

  • Lee, Ui-Jae;Bae, Sang-Hwan;Lee, Ho-Ryong;Choi, Jin-Yu
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1248-1253
    • /
    • 2011
  • It is increasing construction of long span railway bridge with concrete track system for speed up of railway and efficient maintenance of track. As the sleeper of the concrete track system layed on a bridge is fixed on deck of the bridge, the displacement of the sleeper and deck is same. Therefore, the spacing between two sleeper installed at the end of the adjacent deck near the expansion joint of bridge becomes vary according to the longitudinal expansion of a deck by temperature change. By the way, if the spacing of sleepers become increase excessively, it causes large bending stress of in a rail, and it can leads failure or reduction of fatigue life of the rail. Further more, the excessive displacement of the rail may induce decrease ride comfort as well as corrugation of rail surface. Therefore, it is required to determine the allowable maximum sleeper spacing to prevent such problems. For the purpose, investigation on the influence factor on sleeper spacing for straight track was carried out. Variation of bending moment in a rail, wheel force, and the ratio of primary and secondary deflection of the rail according to sleeper spacing was investigated, and, as a result, the maximum allowable sleeper spacing at the bridge expansion joint was suggested.

  • PDF