This paper presents the behavior of the soil based on the Gap Parameter during the Shield TBM tunnel excavation in sandy soil. This study reproduced the tunnel before and after the excavation according to the diameter of the tunnel, water ratio and depth to execute a Scaled Model Test and analyzed the behavior change of the upper soil. As a result, tunneling after for soil stress decreased was similar in all the Case. In addition, the soil stress decreased was in water ratio increases.
In this study, anisotopic yield function is proposed for the numerical analysis of reinforced tunnel ground with grouting. For this, material properties of the reinforced ground both by equilibrium as well as kinematic condition along the interface and by the mean field theory of Eshelby (1957) and Zhao (1990) are compared with each other and, as a result, the advantage/disadvantage of the proposed models are summarized. Finally, reinforced ground around tunnel with grouting is analyzed numerically. A new anisotropic yield function model is shown to be more reliable than the previous one and the predicted result is agreeable with the experimental data available.
Flow around an ICE2 high-speed train exiting a tunnel under the influence of a wind gust has been studied using numerical technique called detached eddy simulation. A wind gust boundary condition was derived to approximate previous experimental observations. The body of the train includes most important details including bogies, plugs, inter-car gaps and rotating wheels on the rail. The maximal yawing and rolling moments which possibly can cause a derailment or overturning were found to occur when approximately one third and one half of the train, respectively, has left the tunnel. These are explained by development of a strong vortex trailing along the upper leeward edge of the train. All aerodynamic forces and moments were monitored during the simulation and the underlying flow structures and mechanisms are explained.
일반적인 물리탐사기법은 도심지내에서 구조물, 전도성 지장물, 차량 등 인공 잡음으로 인하여 그 적용성에 많은 제약을 받는다. 전철이 운행하는 철로 하부에 대한 탐사 역시 전선 및 열차진동이 일반 물리탐사 적용을 제한한다. 본 과업에서는 그 대안으로 선형배열 상시진동탄성파탐사를 적용하였다. 상시진동탐사(mircotremor survey)기법에는 철로를 운행하는 기차와 주변 도로위의 차량에 의한 진동이 오히려 양호한 송신원으로 활용 될 수 있다. 선형배열 상시진동탐사기법에서는 일반적인 굴절법 장비를 이용하여 일상적인 진동을 기록하고, 파동장의 변환을 수행하여 표면파의 분산곡선을 얻는다. 이후 발췌한 분산곡선에 대한 반복적인 수치모델링을 통하여 전단파속도를 구한다. 본 과업에서는 기존 철로를 따라 하부의 터널심도까지의 전단파속도를 전체 터널구간에 대하여 얻기 위하여 40m간격으로 선형배열을 이동하면서 자료를 획득하였다. 측선상의 시추공에서 수행한 SPS검층을 통하여 획득한 전단파속도와 RMR의 비교한 결과 전단파 속도와 RMR이 높은 상관관계에 있음을 확인할 수 있었으며, 상시진동탐사기법을 통하여 획득한 전단파속도 역시 RMR과의 양호한 상관관계를 나타냄을 알 수 있었다. 이러한 상관관계를 이용하여 도심지 철도터널 전체 구간에서 암반분류를 위한 RMR 추정이 가능하였다.
본 연구는 터널 열화 특성과 이와 관련된 각종 문헌 및 사례조사를 통하여 비교 분석하고 정량적인 해석을 위한 영향인자를 도출하여 입력변수를 결정하고 국내 고속철도 터널의 대표단면(풍화암)에 대하여 수치해석을 실시하였다. 해석 결과는 공용 후 30년 경과 시 열화로 인하여 천단침하량은 7.0%, 지표침하량은 30.2%이 증가하고 내공변위는 9.0mm가 수축 한 이후 점차 수렴되는 경향을 보였다. 또한 이완하중고는 공사 완료 후 50년 경과 시 터널고의 2.55배까지 증가하여 극한상태에서의 Terzaghi의 제안값 보다 상당히 큰 값을 나타내었으며, 이러한 소성영역의 확장으로 인하여 터널 라이닝에 3.20~3.66MPa의 축응력이 추가로 작용하게 되는 경향을 확인하였다. 따라서 이로부터 설계에 반영할 수 있는 정량적인 예측기법을 제안하였다.
고속철도는 일반철도와는 달리 터널구간에서 여러 가지 공기역학적인 문제가 발생한다. 개활지와 비교하여 크기가 매우 작은 터널에서 고속으로 운행하는 열차는 큰 공기저항을 받게 되어 주행 안정성이 떨어지고, 터널 내의 급격한 압력변동으로 객차 내 승객의 이명감 발생, 터널출구에서의 소음공해 등 일반철도에서는 예상치 못했던 문제를 유발시킨다. 이 같은 문제점을 해결하기 위하여 본 고에서는 공기압의 특성 분석에 대하여 소개하고자 한다. 수치시뮬레이션을 통해 이명감 기준을 만족하는 최적의 단면을 검토하였다. 또한, 경부고속철도를 운행하는 열차에서 객차내 압력을 측정하였고, 화신5터널에서 터널내 압력 및 터널출구에서의 미기압을 측정하였다. 동시에 열차주행 모형실험을 수행하여 수치시뮬레이션의 입력조건으로 사용된 각종 매개변수 등의 적정성을 비교 검증하였다.
터널공사의 발파공법의 특성상 여굴 발생은 필연적이라고 할 수 있다. 국내 터널 여굴 관련 설계기준에 의하면 공동구 바닥부의 여굴처리는 채움 10 cm로 되어 있으나 설계 여굴량 이상의 깊이를 모두 콘크리트로 채우게 되면 공사비가 크게 증가한다. 철도터널은 항구적인 콘크리트 궤도를 적용 중에 있다. 그러나 철도터널에서 바닥 여굴이 발생할 경우 압축강도 18 MPa의 콘크리트 채움 시공(T=100 mm)을 하고 있고, 상부에 150 mm ~ 237 mm의 보조도상 콘크리트층, 240 mm 콘크리트 궤도(TCL층)를 시공하는 등의 레일 하부와 터널 암반 사이에 약 600 mm 두께의 콘크리트로 시공하고 있어 경제성이 매우 떨어지는 실정이다. 이 연구에서는 기존터널단면과 변경터널단면에 대해 각각 여굴 깊이에 따라 콘크리트 균열 수치해석 및 콘크리트 균열 위험도 분석, 콘크리트 균열 안정성 확보를 위한 터널 바닥콘크리트 소요 두께에 대한 적정성을 평가하였다.
The 1th International Conference on Construction Engineering and Project Management
/
pp.655-661
/
2005
For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3 km upstream of the powerhouse and headrace tunnel of 20 km in length and penstock of 440 m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site; the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20 bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflow raised the water level inside tunnel to 70 cm, 17% of tunnel diameter (3.9 m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made for the excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.
NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly, we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data. Poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for setting technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites having occured accidents is badly geological survey, nonconfirmationi of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are Summarised as follows : 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre0boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel . 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring management, should be posted at field.
NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data, poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for settling technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites haying occured accidents is badly geological survey, nonconfirmation of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are summarised as follows ; 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre-boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel. 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring managements, should be posted at field.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.