A Study on the Gap Parameter in Sand by Scale Model Test

축소모형실험을 통한 사질토지반에서 Gap Parameter의 연구

  • Published : 2010.09.09

Abstract

This paper presents the behavior of the soil based on the Gap Parameter during the Shield TBM tunnel excavation in sandy soil. This study reproduced the tunnel before and after the excavation according to the diameter of the tunnel, water ratio and depth to execute a Scaled Model Test and analyzed the behavior change of the upper soil. As a result, tunneling after for soil stress decreased was similar in all the Case. In addition, the soil stress decreased was in water ratio increases.

Keywords