• 제목/요약/키워드: R&D project selection

검색결과 70건 처리시간 0.027초

Current Status of Nuclear Waste Management (and Disposal) in the United States

  • McMahon, K.;Swift, P.;Nutt, M.;Birkholzer, J.;Boyle, W.;Gunter, T.;Larson, N.;MacKinnon, R.;Sorenson, K.
    • Journal of Nuclear Fuel Cycle and Waste Technology
    • /
    • 제1권1호
    • /
    • pp.29-35
    • /
    • 2013
  • The United States Department of Energy (US DOE) is conducting research and development (R&D) activities under the Used Fuel Disposition Campaign (UFDC) to support storage, transportation, and disposal of used nuclear fuel (UNF) and wastes generated by existing and future nuclear fuel cycles. R&D activities are ongoing at nine national laboratories, and are divided into storage, transportation and disposal. Storage R&D focuses on closing technical gaps related to extended storage of UNF. Transportation R&D focuses on ensuring transportability of UNF following extended storage, and addressing data gaps regarding nuclear fuel integrity, retrievability, and demonstration of subcriticality. Disposal R&D focuses on identifying geologic disposal options and addressing technical challenges for generic disposal concepts in mined repositories in salt, clay/shale, and granitic rocks, and deep borehole disposal. UFDC R&D goals include increasing confidence in the robustness of generic disposal concepts, reducing generic sources of uncertainty that may impact the viability of disposal concepts, and developing science and engineering tools to support the selection, characterization, and licensing of a repository. The US DOE has also initiated activities in the Nuclear Fuel Storage and Transportation (NFST) Planning Project to facilitate the development of an interim storage facility and to support transportation infrastructure in the near term.

네트워크분석과정(ANP)을 이용한 기술개발 성공 예측 : MRAM 기술을 중심으로 (An Analytic Network Process(ANP) Approach to Forecasting of Technology Development Success : The Case of MRAM Technology)

  • 전정환;조현명;이학연
    • 산업공학
    • /
    • 제25권3호
    • /
    • pp.309-318
    • /
    • 2012
  • Forecasting probability or likelihood of technology development success has been a crucial factor for critical decisions in technology management such as R&D project selection and go or no-go decision of new product development (NPD) projects. This paper proposes an analytic network process (ANP) approach to forecasting of technology development success. Reviewing literature on factors affecting technology development success has constructed the ANP model composed of four criteria clusters : R&D characteristics, R&D competency, technological characteristics, and technological environment. An alternative cluster comprised of two elements, success and failure is also included in the model. The working of the proposed approach is provided with the help of a case study example of MRAM (magnetic random access memory) technology.

과학기술혁신을 위한 National Project의 성공적 정책집행의 요인 (Factors of Successful Policy Implementation in National Projects for Technology Innovation)

  • 조국현
    • 기술혁신연구
    • /
    • 제12권3호
    • /
    • pp.73-96
    • /
    • 2004
  • This research began by recognizing the development of telecommunication skill in a short period of time as one achievement of launching the national research and development (R&D) project for the diversification of telephone service and for the solution of telephone holdup rate. Under this concern, this research is focusing on searching the influential elements on successful outcome by analyzing the case of Time Division Exchange R&D Project carried out by Korea. Those variables for analyzing the case is limited to 7 definite variables, which are "willingness of policy making organization", "participation of manufacturers and buyers", "support from research and development group", "economy of operating methods and selection of machinery", "rate of technology transfer", "support from Fixer", and "quality management". Summarizing the result of analysis, in order to bring about technological innovation, knowledge creation activity leading to upward efficiency through competition and cooperation making a harmony should be done in one mechanism. I.e., launching an innovative policy should be done in an arena of competition and cooperation, where stability of implementing system is achieved, the entity of "Fixer" is an adequate operator, and competition and cooperation is efficiently managed, among where agreement on purpose and professional opinions are reflected.

  • PDF

전자부품산업에서의 출연연구소와 기업간의 기술이전 성패요인 분석

  • 박원석;용세중
    • 기술혁신연구
    • /
    • 제8권2호
    • /
    • pp.119-143
    • /
    • 2000
  • The main objective of this study is to test hypotheses by empirical study on the technology transfer from a national institute to small and medium sized enterprises(SMEs) in the Korean electronic devices industry. The important findings of the study are as follows: First, the success of the technology transfer from national institute to SMEs depends on the character of the project manager such as research experience and academic degree level. Second, the success of the technology transfer is related to the nature of the research project, especially to the technology life cycle stage but insignificantly to the amount of R&D fund and duration. Third, another success factor for technology transfer is the joint technology development between institute and SMEs, which is due to the possibility of early commercialization of the technology development project. Fourth, the hypothesis about the relationship between the project selection and evaluation results and technology transfer success is not statistically supported.

  • PDF

스폿 용접공정의 TIP 수명 향상을 위한 6시그마 프로젝트 사례 (A Case Study of Six Sigma Project for Improving TIP Life Time in a Spot Welding Process)

  • 이민구;곽효창
    • 품질경영학회지
    • /
    • 제33권1호
    • /
    • pp.88-98
    • /
    • 2005
  • This paper considers a six sigma project for improving the TIP life time in a spot welding process. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A process map is used to identify process input and output variables. Nine key process input variables are selected by using C&E matrix and FMEA, and finally four vital few input variables are selected from analyze phase. The optimum process conditions of the vital few input variables are jointly obtained by maximizing TIP life time using DOE and alternative selection method.

The Impact of Government Innovation Subsidies on the Survival of SMEs in Korea

  • Kim, Sangsin
    • STI Policy Review
    • /
    • 제9권1호
    • /
    • pp.55-76
    • /
    • 2018
  • This study analyzed the effect of the government R&D subsidy program on long-term firm survival. In order to estimate the average treatment effect for the treated group, we used the survival analysis and matching method by constituting a comprehensive dataset of more than 90,000 observations. The analysis results show that the government R&D subsidy has a negative impact on long-term firm survival. In particular, not only the subsidy does not have a statistically significant effect on firm survival in the relatively short-term, the survival probability of the subsidized firms is statistically significantly lower than the non-subsidized firms after six years. These results can be seen as weakening the justification of government R&D support. There may be problems in the subsidy policy itself and the process of selection of subsidy awardees; however, the more fundamental problem is that the subsidy policy is concluded as the one-time event. Admittedly, it would be difficult for the government to precisely manage the subsidized projects over a long term period. However, in the case of a project in which short-term performance is detected, it would be necessary to provide a step-by-step support to strengthen the firm's competitiveness through further support and continuous development of performance. Of course, mid- and long-term evaluations of subsidy support policy should be performed in parallel with such phased support.

개발효용성에 근거한 기술대체모듈의 선정모형 (A Selecting Model for the Technology Modular Alternatives Based on Development Effectiveness)

  • 김기찬;안기현;강일중;권철신
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2007년도 추계학술대회 및 정기총회
    • /
    • pp.152-155
    • /
    • 2007
  • The object of this research is to evaluate the priority of R&B project alternatives which were already screened by both feasibility and suitability of technological performance. This research is a selection model for R&D project alternatives after setting phase. And it is designed by CHP model which include individual and mutual weights. This model have 5 steps. (1) Setting Technology-Modules derived on the setting phase (2) Presenting the evaluation standards divided with 'M-Field' and 'T-Field' (3) Assessing the evaluation standard and technology modules (4) Obtaining and integrating the individually and mutually effective weights (5) Selecting the technology modules based on the priority of order by CHP. Through these steps, this model can suggest the evaluation way from specific technology levels to project level. And it can be guaranteed to perform the selected module set.

  • PDF

A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site

  • Kwon, Soonwook;Lee, Gaeyoung;Ahn, Dooyong;Park, Hee-Sung
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.45-50
    • /
    • 2014
  • Productivity analysis is the most important and significant method for evaluating management and engineering performance during whole project stage. However, it is very difficult in developing qualitative index to construction industry comparing to other industries. Therefore, analytical hierarchy process (AHP) is one of the methods for overcoming these limitations by checking consistency index using duality comparison. In this study, it is scraped up an application plan and selection for innovative tools by analyzing survey results on tool users and site managers with respect to using Modified-AHP performance measurement method.

산업기술도입의 선정기준과 효율측정 (Measures of Effectiveness and Selection Criteria of Technology Development)

  • 김재주;이면량;정영삼
    • 대한산업공학회지
    • /
    • 제2권1호
    • /
    • pp.37-44
    • /
    • 1976
  • It is necessary for developing countries to increase their consolidation of domestic technology in order to improve their economy. In order to raise their techniques, they have to try to induce the advanced know-how from other countries in spite of heavy cost. The object of this study is to establish the model on which we base our choice of the proper techniques or plants and give priority to them by using quantified selection criteria. The method in this study has two stages, and the writer has selected 12 factors affecting the decision making for the importation of technology from the industrially advanced countries. First, the lists of valuable know-how for the better development of national industry should be determined, and for the formulation and arrangement of the lists, a council of specialists which uses questionnaires in terms of the Semantic Differential Method, should be organized. Second, for the assignments of priority to the prospective items for importation, the writer has imployed both the Leontief Model and the Disman Model as objective methods and Mottley-Newton method, one of the R&D Project Selection Methods, as a general model. The writer has applied the methods described above to the fields of petrochemical industry in Korea.

  • PDF

기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구 (A study on the normal project duration development for the construction of multi-utility tunnel in the existing city)

  • 이성원;이필윤;변요셉;조중연;이민재
    • 한국산학기술학회논문지
    • /
    • 제19권12호
    • /
    • pp.677-685
    • /
    • 2018
  • 건설공사에서 공정관리는 기본적으로 가장 중요한 단계이며, 효율적인 공정관리를 위해서는 합리적 공정표 작성이 우선시 되어야 한다. 설계단계에서는 기상조건과 현장 특성을 고려한 다양한 조건과 공법의 비교 검토를 통해 최적의 공사 기간을 산정할 수 있으나, 기획단계에서 기본적인 자료(D/B) 분석만으로는 효율적 공법 선정과 적정한 공사 기간 산정이 어렵다. 따라서, 기획단계에서 기존시가지의 공동구 건설시 표준공기 분석을 위하여, 본 논문에서는 공동구 형식을 개착식 및 터널식으로 구분하고, 각 형식의 특성과 기존시가지의 조건을 고려한 공법을 선정 하도록 하였다. 합리적인 공기 계산을 위하여 외부 공사에 영향을 주는 기상조건을 고려하여 년 간 가동율을 산정 하였으며, 개착식은 RC 공법/터널식은 Shield TBM 공법에 대한 단위공정을 분석하였다. 각 단위공정을 종합하여 연장 1,200m, 환기구 200m 간격으로 가정한 공사의 표준공기를 산정한바, 개착식은 893일, 터널식은 616일이 소요되는 것으로 분석 되었다. 본 연구의 결과는 기획단계에서 보다 쉽게 공동구 형식 선정과 표준공기 산정에 도움이 될 것이며, 추후 설계단계에 연계하면 공정 및 공사비 산정이 용이할 것으로 판단된다.