• Title/Summary/Keyword: R&D priority

Search Result 195, Processing Time 0.022 seconds

Priority Setting for Future Core Technologies using the AHP - With Major Fields in Rural Development and Resources - (AHP를 이용한 미래유망기술 투자의 우선순위 설정 - 농촌개발 및 자원분야를 중심으로 -)

  • Cho, Keun-Tae;Kim, Seong-Joon;Kim, Dae-Sik;Cho, Young-Woo;Lee, Jong-In
    • Journal of Korean Society of Rural Planning
    • /
    • v.9 no.3 s.20
    • /
    • pp.41-46
    • /
    • 2003
  • The study was focused on setting priority for future core technologies in rural development and resources using AHP. The technologies were derived by Delphi method. Evaluation criteria for the priority setting were decided as 'technology', 'market oriented', and 'public concerns' by council. The future core technologies were divided as four groups by importance and R&D level. Technologies in upper two groups were considered in the study. Group I had high importance and high R&D level. Group II had high importance and lower R&D level. Questionnaires were given to 9 specialists in agricultural resources. As the results, 'public concerns' was decided as a most important evaluation criterion. The most important technologies are "technology developing for animal feces and urine treatment, and restoration it to farm land" in group I, and "technology developing for agricultural by-products as energy source" in group II.

Priority Setting for Future Core Technologies in Biosystems Engineering using the Analytic Hierarchy Process (AHP를 이용한 기계화분야 미래유망기술의 우선순위 설정)

  • 이종인;김만수;조근태;김재한
    • Journal of Biosystems Engineering
    • /
    • v.29 no.2
    • /
    • pp.187-194
    • /
    • 2004
  • The study focused on setting priority among the future core technologies that were derived by Delphi in agricultural management & information using analytic hierarchy process(AHP). Items for setting priority were decided as ‘technology’, ‘market’, and ‘public concerns’by council. The future core technologies were divided into four parts by importance and R&D level. Technologies which consisted of upper two parts having higher importance were considered in the study. Questionnaires were given to 9 specialists in biosystems engineering. As the results, ‘market’ was decided as a most important item. The most important technologies were ‘Developing technology and system of post harvest processing for higher quality rice’ in group I, and ‘Developing sensor technology to evaluate quality and safety for agricultural products’ in group II.

Finding Subjects for Automated Container Terminal Development by Systems Approach (시스템적 접근에 의한 자동화컨테이너터미널 개발 과제 도출)

  • 박창호;노홍승;정희균
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1998.10a
    • /
    • pp.51-58
    • /
    • 1998
  • This study is to define the Automated Container Terminal(ACT) and container terminal system. Also, we analyze the present condition of the container terminal system in Pusan port and its automation level by systems approach. And this paper aims at evaluating on the priority of R&D investment until the beginning of the second stage of New Pusan Port Project(2006). In this process we have considered 8 factors (cost, labor, area, time volume, reliability, safety, convenience) to analyze 6 subsystems. The priority order of R&D until target year by sub-systems is as follow : Cargo Handling System〉Transfer System〉Port Entry System〉Storage System(Distribution&Manufacturing System included)〉Inland Transport System〉Port Information System.

  • PDF

Case Study of Priority-Setting of National Strategic Technologies in Korea (한국의 국가전략기술분야 우선순위 설정에 관한 사례 연구)

  • 변도영;손석호;이정근;고대승;정근하;박병무
    • Proceedings of the Technology Innovation Conference
    • /
    • 2002.02a
    • /
    • pp.183-203
    • /
    • 2002
  • The governments investment in R&D has rapidly increased so that a comprehensive and coherent approach to resource allocation has necessitated. Therefore the need for priorities in science and technology has been increased according to growing resources to science and technology. This study presents the methodology, process and results of priority-setting of national strategic technologies(IT, BT, NT, ST, ET, CT) through which 77 national key technologies are selected based on the criteria. Specifically it is intended to identify strategically necessary areas of focus for R&D, help leverage limited resources most effectively, and help coordinate government R&D activities by supplying ministries with a common set of priorities.

  • PDF

Finding Subjects for Automated Container Terminal Development by Systems Approach (시스템적 접근에 의한 자동화컨테이너터미널 개발 과제 도출)

  • 박창호;노홍승;정의균
    • Journal of Korean Port Research
    • /
    • v.12 no.2
    • /
    • pp.243-250
    • /
    • 1998
  • This study is to find subjects for the Automated Container Terminal(ACT) development and container terminal system. Also we analyze the present condition of the container terminal system in Pusan port and its automation level by systems approach. And this paper aims at evaluating on the priority of R&D investment until the beginning of the second stage of New Pusan Port Project(2006). In this process we have considered 8 evaluation indexes(cost, labor, area, time, volume, reliability. safety, convenience) to analyze 6 subsystems. The priority of R&D until target year by sub-systems is as follow: 1. Cargo Handing System, 2. Transfer System, 3. Port Entry System, 4. Storage System (Distribution & Manufacturing System included), 5.Inland Transport System, 6.Port Management & Information System.

  • PDF

R&D Project Selection Models in the Public Sector (중점연구개발과제 도출을 위한 기술기획 모델-공공부문의 정보통신기술개발계획을 중심으로-)

  • 임명환
    • Journal of Technology Innovation
    • /
    • v.5 no.1
    • /
    • pp.266-287
    • /
    • 1997
  • The purpose of this paper is to purpose methods and procedures by which we can set up technology planning scheme essential for R'||'&'||'D(or technology) planning in public sector (governmental and government-sponsored institutions), and can develop and select "main R'||'&'||'D projects" which are crucial to R'||'&'||'D planning, were quite specifically discussed in case of I'||'&'||'T(Information '||'&'||' Telecommunications) sector, so that they may not remain theoretical but may be practically applicable to real R'||'&'||'D programs. In this paper, the concept of technology planning was defined as a procedure for establishing nominal planning to acquire technologies efficiently for a specific sector. More detailed definition optimal technology-acquisition strategy, i.e., analyzing technological development '||'&'||' environ-ment, establishing R'||'&'||'D objectives as promising technology opportunities, selecting main R'||'&'||'D projects, allocating resources and so on."The"main R'||'&'||'D projects by technology sectors and by planning phases and then deciding on priority. Scoring method was rsed in assessment phase. Summing up, this paper suggested technology planning scheme of methods and procedures for sorting out required technologies, developing and assessing public R'||'&'||'D projects, and finally selecting main R'||'&'||'D projects.

  • PDF

Analysis of Assessment Indicator on Priorities for Budget Allocation of the National R&D Program (국가연구개발사업 예산배분을 위한 우선순위 판단지표 분석)

  • Ahn, Seung-Ku;Kim, Eun-Sil;Cho, Hyun-Jeong
    • Journal of Korea Technology Innovation Society
    • /
    • v.14 no.4
    • /
    • pp.889-914
    • /
    • 2011
  • This paper is to review assessment indicator on priorities for budget allocation of the national R&D program. In priority setting of programs for the budget allocation process of the national R&D program using the Analytical Hierarchy Process (AHP), the survey result on the major influencing factors is as follows: the significance of components of evaluation for the priority of the national R&D programs in budget allocation was as following order: "accomplishment and ripple effect of the project," "basis and driving force for the promotion of project," "feasibility of project goals," and the "possibility of overlapping and linkage among projects". The importance of the final evaluation indicator was as following order: "clarity and possibility for accomplishment of business objectives," "ripple effects in terms of science and technology", "ripple effects in terms of the economy and overall society" and "appropriate correspondence with mid- to long-term plans" (the importance for these four indicators was over 10%) while the importance of "overlapping" and "appropriateness of budget size" indicators which fell below 5% were considered to be relatively less important. there is a need for a clear criteria and conceptions of evaluation indicators for budget allocation of national R&D programs.

  • PDF

Construction of "CIDEAR" Model for Selecting and Evaluating Cross Impact R & D Projects (상호영향형 R&D과제군의 평가산정을 위한 "CIDEAR" 모형의 개발)

  • Kwon Cheol Shin;Park Joon Ho;Hong Seok Ki
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.29 no.3
    • /
    • pp.41-61
    • /
    • 2004
  • The purpose of this paper is to construct $\ulcorner$CIDEAR(Cross Impact-DEA-AR)$\lrcorner$ model which evaluates proposed R&D projects considering cross impact among them and selects proper projects to utilize resources efficiently as well as to maximize efficacy of investments. For this purpose, $\ulcorner$CIDEAR$\lrcorner$ model is designed as the following six steps. $\ulcorner$Decision Theory Evaluation Model$\lrcorner$ is for setting and selecting the evaluation items according to the structured procedure of evaluation system. The priority of items is decided at $\ulcorner$AR Decision Model$\lrcorner$$\ulcorner$Cross Impact Estimation Model$\lrcorner$ is for computing the final probability of success and the result is used to revise the evaluation results of $\ulcorner$Decision Theory Evaluation Model$\lrcorner$. $\ulcorner$Resource Performance Analysis Model$\lrcorner$ classifies the proposed R&D projects on the basis of required resources and expected performance. Consequently, the possibility of bias of project selection can be prevented. $\ulcorner$Priority Oder Decision Model$\lrcorner$ is for computing the efficacy of proposed projects. Finally, $\ulcorner$Efficacy-Efficiency Cause Analysis Model$\lrcorner$ analyzes the structure of efficacy and efficiency of the projects. The major findings and significances of this study are summarized as follows: (1) $\ulcorner$CIDEAR$\lrcorner$ model can deal with the affairs of R&D projects having the characteristics of mutual independence as well as mutual dependence in the point of efficacy and efficiency. Hence, it is possible to evaluate and select R&D projects more accurately. (2) It can be possible to raise the possibility of projects success. R&D manager can use the information for project management because the efficacy-efficiency structure of selected projects can be analyzed. (3) We proved the usefulness of the constructed $\ulcorner$CIDEAR$\lrcorner$ model using an case about twenty-one R&D projects of a leading company of electronic industry in Korea.

Investments on Pro-poor Development Projects on Goats: Ensuring Success for Improved Livelihoods

  • Devendra, C.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.26 no.1
    • /
    • pp.1-18
    • /
    • 2013
  • The elements that determine the success of development projects on goats and the prerequisites for ensuring this are discussed in the context of the bewildering diversity of goat genetic resources, production systems, multifunctionality, and opportunities for responding to constraints for productivity enhancement. Key determinants for the success of pro-poor projects are the imperatives of realistic project design, resolution of priorities and positive impacts to increase investments and spur agricultural growth, and appropriate policy. Throughout the developing world, there exist 97% of the total world population of 921 million goats across all agroecological zones (AEZs), including 570 breeds and 64% share of the breeds. They occupy a very important biological and socioeconomic niche in farming systems making significant multifunctional contributions especially to food, nutrition and financial security, stability of farm households, and survival of the poor in the rural areas. Definitions are given of successful and failed projects. The analyses highlighted in successful projects the value of strong participatory efforts with farmers and climate change. Climate change effects on goats are inevitable and are mediated through heat stress, type of AEZ, water availability, quantity and quality of the available feed resources and type of production system. Within the prevailing production systems, improved integrated tree crops - ruminant systems are underestimated and are an important pathway to enhance C sequestration. Key development strategies and opportunities for research and development (R and D) are enormous, and include inter alia defining a policy framework, resolution of priority constraints using systems perspectives and community-based participatory activities, application of yield-enhancing technologies, intensification, scaling up, and impacts. The priority for development concerns the rainfed areas with large concentrations of ruminants in which goats, with a capacity to cope with heat tolerance, can be the entry point for development. Networks and networking are very important for the diffusion of information and can add value to R and D. Well formulated projects with clear priority setting and participatory R and D ensure success and the realisation of food security, improved livelihoods and self-reliance in the future.

A Hybrid Method of MultiAttribute Utility Theory and Analytic Hierarchy Process for R&D Projects' Priority Setting. (MAUT/AHP를 이용한 연구개발사업 우선순위 선정방법)

  • 김정흠;박주형
    • Proceedings of the Technology Innovation Conference
    • /
    • 1999.06a
    • /
    • pp.245-265
    • /
    • 1999
  • MAUT and AHP are widely used for quantification of subjective judgements in various fields of decision making. This study focuses on the introduction and application of MAUT/AHP method which is a hybrid of MAUT and AHP techniques in R&D project priority setting. This hybrid model can clarify each factors' contribution using MAUT method and can reduce the number of pairwise comparisons of AHP method. This study applies AMUT/AHP method to the evaluation of R&D projects in a Government - funded research institute. To evaluate R&D projects, six evaluation factors are derived. SMART(Simple MultiAttribute Rating Technique) and DVM(Difference Value Measurement ) out of many MAUT methods are used to design the utility function ad AHP is used to allocate the weights among evaluation factors. The major findings of this study can be summarized as follows. First, the SMART/AHP and the DVM/AHP have the same results with the SMART and the DVM, and they are different results with AHP. It is very hard to decide which one is better. Second, MAUT/AHP's strength is analyzed. MAUT reflects utility values of evaluators to alternatives and AHP results objective and consistent weights of factors through pariwise comparisons. Third, its possible application fields are proposed. It is applicable to subjective decision making problems with high complexity and inter-independent factors.

  • PDF