• 제목/요약/키워드: Quantity of standard work

검색결과 54건 처리시간 0.025초

중류가정 부엌의 수납장 모델 설정을 위한 연구-부엌수납 용품의 표준화- (Standardized Model of Kitchen Cabinets in a Middle -Class Family.)

  • 심현숙;신경주
    • 가정과삶의질연구
    • /
    • 제4권1호
    • /
    • pp.49-69
    • /
    • 1986
  • This study aimed to fine out the rational quantity of kitchen utensils and appliances Questionnair was distributed to families of 469 of middle school students. I studied status of kitchen work centers, quantity and the kinds of kitchen utensils. The results were as follows. 1. the status of kitchen :1) The percentage of western style work centers was significantly higher than the average level of Seoul. 2) The length and the height of work centers were below standard. 3) Arrangement of work centers was relatively correct, however, the kinds of kitchen work centers were not fully equipped. 2. The quantity of kitchen utensils: The socio-economic status were the main factor of the quantity of kitchen utensils. Educational level, income level and floor space were strongly corrected to the quantity of kitchen utensils.

  • PDF

조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 - (Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit -)

  • 정운수;최기수
    • 한국조경학회지
    • /
    • 제40권2호
    • /
    • pp.97-111
    • /
    • 2012
  • 본 연구는 공공건설공사 중 조경공사 적산의 단가 비교로 적정 공사비 산출방안을 모색하고자 하였다. 2011년 상반기 실적단가에서 조경공사로 분류되는 12항목 중 유사기준인 7항목을 대비하며, 준용 공종은 5개 현장에 적용된 실적단가 80항목 중 비교 가능한 35항목을 유사기준인 2011년 3월의 표준품셈 단가로 대비하였다. 조경부문 7항목의 실적공사비율은 항목별로는 104.86%, 총공사비로는 92.09%이다. 실적공사비율이 높은 이유는 암반 적용 여부로 씨앗뿜어붙이기의 높은 비율도 있지만, 근본적인 이유는 잔디와 씨앗뿜어붙이기의 사면처리 비용 때문이므로, 품셈의 불합리성과 토양 종류별 기준별 보정계수 규정을 세분할 필요가 있다. 토목과 건축 준용부문 35항목의 실적공사비율은 항목별로 78.65%, 총공사비로는 71.31%(70.17%)이다. 이는 실적단가가 구조적으로 실제 금액을 반영하지 못하는 점과, 품셈은 인력시공에서 현실성이 결여된 때문으로 판단된다. 국토해양부 발표인 85.1~91.2%의 실적공사비율은 신규 전환품목 단가이므로, 이 결과는 실제적인 실적공사비율로 추정되며, 실적단가가 적정 비율을 보이도록 검증 후 보완하고 표준품셈도 이러한 실적자료 등으로 보완이 필요하다.

무진동굴착공법의 일위대가방식과 작업조방식의 생산성 비교 분석 (Productivity Analysis on the Standard Quantity-Per-Unit Costing Method and Work Crew Combination Method : Focused on Non-Vibration Mass Excavation Method)

  • 이동욱;조홍준;이근조;김남식
    • 대한토목학회논문집
    • /
    • 제31권3D호
    • /
    • pp.457-468
    • /
    • 2011
  • 최근 들어 제주도내 도심지에서 주로 시공이 이루어지는 하수관거 정비공사 및 일부 도로공사 현장의 암 터파기 시공에서 무진동 굴착공법이 사용되고 있으나, 단위 물량에 대한 공사비를 산정함에 있어서 적정한 단가가 제시되지 못하는 문제점이 있다. 따라서 본 연구에서는 제주 지역 인근 현장에서 암터파기 작업에 활용되고 있는 무진동 굴착공법에 대한 현장 모니터링을 바탕으로 일위대가방식과 작업조 방식의 생산성을 비교 분석하였다. 이를 위해 35개 현장의 작업 데이터를 수집하였고, 30개 데이터를 통해 회귀식을 도출하였으며, 나머지 5개의 자료를 통해 검증을 실시하였으며, 이를 통해 작업조 방식의 1일 작업물량은 $16.43m^3$ 임을 도출하였다. 또한 작업조 방식의 공사비의 산정을 위해 현장여건을 고려한 장비의 조합과 작업인원에 차이를 둔 노무량의 조합을 도출하였다. 회귀분석을 통해 도출된 작업조의 1일 작업물량($16.43m^3$)에 근거한 공사비를 산출하였고, 이를 일위대가 방식의 공사비와 비교, 분석하였다.

시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석 (Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction)

  • 하기주;최민권;이동렬;하민수;하재훈;김외곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용 (Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume)

  • 정국영;우정원;강경돈;신재철
    • 한국BIM학회 논문집
    • /
    • 제3권3호
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

현장 실측자료 분석을 통한 NATM 터널의 숏크리트 투입량에 관한 연구 (A Study on Quantity of Shotcrete Sprayed in a NATM Tunnel Based on Field Measurements)

  • 이철주
    • 한국지반환경공학회 논문집
    • /
    • 제12권9호
    • /
    • pp.47-54
    • /
    • 2011
  • 본 연구에서는 NATM으로 시공되는 산악터널의 시공과정에서 실측된 여굴, 숏크리트의 리바운드 및 투입율에 대한 분석을 실시하였다. 터널굴착 직후 굴착단면에 대한 여굴 크기를 조사한 결과 평균 여굴의 크기는 약 28.5cm 이며, 허용 여굴의 약 260%의 값을 보였다. 숏크리트의 리바운드는 평균 약 7.2% 정도로 측정되었는데 이는 일반적인 설계규정인 15% 보다 작은 값이다. 여굴 및 숏크리트 타설 중에 발생한 리바운드로 인하여 터널공사에 실제로 투입된 숏크리트 물량은 설계대비 약 116.5%의 값을 보였다. 자료분석에 의하면 숏크리트의 설계대비 실제투입율은 RMR(Rock Mass Rating)이나 터널 표준지보패턴과는 어느 정도 상관관계가 있는 것으로 나타났으나, 이에 비해 여굴은 RMR 값이나 표준지보패턴과는 상관성이 낮은 것으로 분석되었다. 따라서 표준지보패턴만에 의해 허용 여굴의 크기를 규정하는 현행 터널설계기준에 대한 재검토가 필요할 것으로 판단된다. 본 연구 결과를 통하여 분석된 여굴 및 숏크리트 투입량에 대한 고찰결과를 보고하고자 한다.

Development of Standard Estimates for Garden Construction: Focused on Planting

  • Hong, Kwang-Pyo;Lee, Hyukjae
    • 인간식물환경학회지
    • /
    • 제22권5호
    • /
    • pp.467-480
    • /
    • 2019
  • Standard estimates are the numerical data of a unit quantity required for construction work such as the amount of materials, manpower, and the use of equipment required and are also a basis to calculate construction costs. Unfortunately, standard estimates for construction have also been used for garden construction these days as no standard estimates for garden construction have been developed or documented until now. As a result, many problems have arisen at garden construction sites since landscape construction and garden construction differ in terms of scope, size, design and construction methods. The purpose of this study was to develop standard estimates for garden construction for proper calculation of the cost of garden construction and to ensure gardens are created following appropriate construction processes. In order to develop standard estimates for garden construction, a preliminary survey was conducted on experts to understand current issues at first. After that, a questionnaire survey was done to examine problems of construction processes and ways of improvement, and on-site inspections were conducted utilizing CCTVs at construction sites to identify the actual amount of manpower required on site. Based on the results of the surveys and on-site inspections, a draft version of standard estimates for 5 types of planting work for garden construction was developed. Developing standard estimates for garden construction will serve as a stepping stone for the transparent and proper compensation for garden construction work, which will not only contribute to addressing issues between consumers and construction companies, but also to the stabilization of market economy and job creation.

하천공사 대표공종의 작업조 구성 및 생산성 정보 개발 (A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project)

  • 유덕열;박형근;임형민
    • 대한토목학회논문집
    • /
    • 제33권6호
    • /
    • pp.2519-2528
    • /
    • 2013
  • 표준품셈은 공공기관 및 민간기관의 공사비를 책정하는 기본적인 자료로 이용되고 있다. 본 논문은 하천공사에서 선정된 대표공종을 대상으로 새로운 형식의 표준품셈 및 장비의 작업량 산출방식을 제안하고자 한다. 품셈에서 작업조 구성의 정보 및 1일 생산성 정보의 제공이 가능하도록 함으로써 공정계획 단계에서 품셈의 적용성을 향상시키고 장비의 작업량 산출과정을 간소화하여 사용자의 편의성을 증대할 수 있기를 기대한다. 하천공사의 경우 작업조건이라는 변수가 매우 크게 작용하기 때문에 생산성 정보 및 기계의 작업량을 일반화 하는 것은 많은 어려움이 존재하지만 지속적인 생산성 정보와 기계의 작업량 정보를 개선하여 정확도를 향상할 수 있다면 품셈을 통한 공정계획 수립 및 적산과정의 간소화가 가능할 것이다.

대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크 (Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work)

  • 곽수남;김두연;한승헌
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.607-612
    • /
    • 2007
  • 사업 초기 단계에서의 정확한 공사비 예측은 각각의 대안을 비교하여 향후 공사비에 대한 정보를 제공함으로써 효율적인 예산수립을 가능하게 한다. 하지만 사업 초기 단계에는 공사비 산정 기준이 모호하고 가용 정보가 부족함에 따라 공사비 예측에 한계가 나타난다. 더욱이 현행 공사비 산정모델이 단위 길이당 공사비를 활용한 선형적이고 단순한 모델을 활용함에 따라 예측의 정확도에 한계를 가지고 있다. 따라서 본 연구에서는 기존 공사비 산정모델의 한계를 개선하고 사업 초기 단계에서 가용한 데이터를 활용할 수 있는 공사비 산정 모델의 Framework를 구축하고자 한다. 이를 위하여 본 연구에서는 국내외 개략공사비 산정 모델을 분석하였으며, 기존 도로공사의 공사비 분석자료를 토대로 노선선정 등 사업초기 단계에서 활용 가능한 도로공사 개략공사비 산정모델의 Framework를 제시하였다.

  • PDF

도로공사 대표공종의 생산성 정보 개발에 대한 연구 (A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project)

  • 서지형;박형근
    • 한국건설관리학회논문집
    • /
    • 제12권6호
    • /
    • pp.42-53
    • /
    • 2011
  • 2004년 예정가격 산정방법으로 실적공사비 적산제도가 본격적으로 시행되면서 상대적으로 표준품셈 적산제도의 적용이 하락하였다. 그러나 2010년 하반기 예정가격 산정시 표준품셈 적산제도의 적용비중은 45%이며, 여전히 높은 적용비중을 유지하고 있다. 현행 표준품셈은 예정가격의 산정에 과도한 시간이 소요되고, 시공계획과 자원분배에 적용하기 어려운 단점이 있다. 이와 같은 단점을 개선하기 위하여 본 연구에서는 국내외 품셈의 형식을 고찰하여 이를 국내 도로분야 대표공종에 적용하여 기존 품셈을 일단위 작업조 기반 생산성 정보로 산출하여 유사한 조건하에서 일본 미국의 생산성 정보 및 현장자문을 통한 정보와 비교하였다. 본 연구를 통해 적용된 작업조기반 생산성 정보 산출 방법과 산출 정보의 효용성을 확인하고자한다. 이러한 과정을 통하여 표준품셈을 통한 작업조기반 생산성 정보 산정 방법'과 일단위 작업조 기반 생산성 정보를 제시하고자 한다.