• Title/Summary/Keyword: Quantity Surveyors

Search Result 9, Processing Time 0.019 seconds

ATTITUDES TOWARDS KNOWLEDGE SHARING AMONG QUANTITY SURVEYORS

  • Kherun Nita Ali;Md Asrul Nasid Masrom;Pow Yih Wen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.567-574
    • /
    • 2011
  • The purpose of this paper is to identify factors that influence knowledge sharing and determine the attitudes of quantity surveyors towards knowledge sharing based on the factors. The analysis was based on an online questionnaire survey of Registered Quantity Surveyors from Selangor and Kuala Lumpur. Individualism and collectivism were identified as two major factors that influence attitude towards knowledge sharing. Indicators of individualism include individual attitude, competitiveness, care, incentives and rewards; while the indicators of collectivism are trust, social behaviors and motivation. The findings show that the level of attitudes towards knowledge sharing among quantity surveyors is generally high under enabling organizational environment. However, this is a cautious conclusion as the valid sample on which the analysis is based is relatively small. Willingness to share was found to be highest when incentives and rewards are involved as well as when there is a knowledge management system to promote continuous learning and sharing of knowledge.

  • PDF

Quantity Surveyors' Perception of Cost Impact Factors in Hong Kong Civil Engineering Projects

  • Chiu, Wai Yee Betty;Lau, Hat Lan Ellen
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.3
    • /
    • pp.1-9
    • /
    • 2015
  • Project cost is an important concern in any construction project. Although there has been a lot of studies on factors affecting the cost of construction projects, there seems no consensus as what cost factors have direct influence on the cost of civil engineering projects. This study therefore aims to bridge the current knowledge gap by examining quantity surveyors' perception of the factor structure among nineteen costing attributes identified based on literature review. Questionnaire was used to elicit responses from quantity surveyors working in the Hong Kong construction industry. Principal component analysis is conducted to extract the factor structure of the cost attributes and the attributes are grouped into three factor components, namely the contract management factor, the project management factor and the monetary value factor. Understanding these cost impact factors could be crucial in managing civil engineering projects, since it allows the project stakeholders and quantity surveyors to take precautionary steps to identify the cost management problems and areas for improvement and could even help to avoid cost deviations in engineering projects.

Calculation of Hopper Dredging Capacity by Combination of DGPS and Echo Sounder (DGPS/EchoSounder 조합에 의한 호퍼준설량 산정)

  • 이종출;이용희;김종원;강윤성
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.04a
    • /
    • pp.77-82
    • /
    • 2004
  • This study deals with the estimation of dredged soil-quantity using DGPS&Echo-Sounder method. In measurement of topography, surveyors have been surveying the depth with rod and sounding lead. This method, however, is not effective because of long time and a lot of human power, in addition it is incorrect. This paper has studied on the solution of those problems using DGPS&Echo-sounder data to calculate the dredged soil-quantity. This paper says the effective and economical methods using DGPS&Echo-Sounder data there.

  • PDF

EXPLORING THE CHALLENGES TO USAGE OF BUILDING CONSTURCTION COST INDICES GHANA

  • Osei-Tutu, E;Adobor, C.D;Kissi, E.;Osei-Tutu, S.;Adjei-Kumi, T.
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.313-320
    • /
    • 2017
  • Price fluctuation contract is imperative and of paramount essence in the construction industry as it provides adequate relief and cushioning for changes in the prices of input resources during construction. As a result, several methods have been devised to better help in arriving at fair recompense in the event of price chang es. However, stakeholders often appear not to be satisfied with the existing methods of fluctuation evaluation, ostensibly because of the challenges associated with them. The aim of this study was to identify the challenges to usage of building construction cost indices in Ghana. Data was gathered from contractors and quantity surveying firms. The study utilized survey questionnaire approach to elicit responses from the contractors and the consultants. Data gathered was analyzed scientifically, using the Relative Importance Index (RII) to rank the problems associated with the existing methods. The findings revealed the following among others; late release of data; inadequate recovery of costs; and work items of interest not included in the published indices as the main challenges of the existing methods. This study will provide useful lessons for policy makers and practitioners in decision making towards the usage and improvement of available indices.

  • PDF

MODEL-BASED LIFE CYCLE COST AND ASSESSMENT TOOL FOR SUSTAINABLE BUILDING DESIGN DECISION

  • Iris X. Han;W. Zhou;Llewellyn C.M. Tang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.311-317
    • /
    • 2011
  • There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.

  • PDF

Definition of the Earth-volume in Breakwater Using Real-time DGPS & Echo-Sounding data (실시간 DGPS & Echo-Sounding 데이터를 이용한 방파제사석투하 토공물량 확인)

  • 서용운;최윤수
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.4
    • /
    • pp.343-350
    • /
    • 2000
  • This study deals with the Definition of the Earth-volume quantity and direction of throwing down stones (Q.R.R) into the Breakwater using Real-time DGPS & Echo-Sounding method. Generally, the buoy in the center line of Breakwater has been set up so as to throw down stones in the correct area. After throwing stones down there, surveyors have been surveying the depth and direction of stones with rod and sounding lead. The method, however, is not effective because of long time and a lot of human power, in addition it is incorrect. This paper has studied on the solution of those problems using Real-time DGPS & Echo-Sounding data to calculate the earth-volume quantity, direction and depth of throwing down stones. This paper says the effective and economical methods using Real-time DGPS & Echo-Sounding data there.

  • PDF

Critical Barriers to the Practice of Effective Cost Planning in the Ghanaian Construction Industry

  • Kissi, Ernest;Adjei-Kumi, Theophilus;Badu, Edward
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.8-15
    • /
    • 2016
  • Cost planning practices in the construction industry worldwide has gained much popularity in recent times due to economic recession and stringent measures that various procurement laws prescribe in most developed and developing countries. Nevertheless, these practices in developing countries such as Ghana are constrained with the existence of critical barriers that render them non-effective and hence, accounting for the numerous abandonment of both private and public projects. Consequently, this study was enunciated with the aim to examine the critical barriers to the practice of effective cost planning in the Ghanaian construction industry. Through an in-depth literature review and a pilot survey, questionnaires were designed and administered to quantity surveyors. Data generated from the field survey was subjected to principal component analysis. The findings of the study revealed weak cost planning knowledge base, poor cost databases and understanding, inadequate designs and planning and external conditions are the major barriers to cost planning practices in the Ghanaian construction industry. The need for this study cannot be doubted since it provides an insight for experts in the construction industry on the barriers of the practice of cost planning in the industry. The awareness of these barriers will therefore facilitate efficient and effective efforts to resolve them. A future study is thereby proposed by this study to explore effective cost planning practices in the Ghanaian construction industry that will ensure private and public stakeholders get value for their money invested.

A Food and Nutrient Intake Study of the Lactating Women in Rural Korea (농촌 수유부(授乳婦)의 식품(食品) 및 영양섭취(營養攝取)조사)

  • Kim, Har-Riet;Paik, Jeong-Ja
    • Journal of Nutrition and Health
    • /
    • v.12 no.3
    • /
    • pp.41-46
    • /
    • 1979
  • Almost all Korean women in rural area breast feed their children for average 18 to 24 months. Since they breastfeed their children for long period the need for the lactating mot­hers to be nutritionally refurnished becomes evidently great. However the studies on the nutrient intake level of these mothers has been very scarce. We have studied the food and nutrient intake level of 93 lactating women randomly selected from rural areas of South Korea. Thirty one well trained and experienced surveyors conducted the dietary survey by the. combination method of precise weighing and interview for two 'consecutive days. Briefly stating the findings 1) The dietary pattern of the lactating women in rural Korea was not different from the ordinary Korean diet-i.e no conscientious effort to improve the quality of the diet was apparent. 2) Consequently over 90% of the total food intake was made up with the typical rice­kimchi diet. 3) The quantity of the total food intake was greater than the national average sufficient intake of calorie was observed. 4) No milk or the milk products were consumed by the lactating women in rural Korea. 5) Average intake of protein was 88 grams. Only 5% of these was provided by the animal foods. 6) Mean daily intakes of niacin, thiamin and ascorbic acid exceeded the recommended allowances. But vitamin A intake was 1171 IU-about 33% of the RDA-and the riboflavin intake was 0.92 mg. which is about 54% of the recommended level for the lactators. 7) Average calcium intake was 490 mg.-41% of the RDA. The iron intake was adequate.

  • PDF

Performance Effectiveness Case Study of the Machine Guidance System for Dozer Eartwrok Grading Work (도저 정지작업 시 머신 가이던스 시스템 적용에 따른 토공성과 향상 사례분석)

  • Moon, Sungwoo;Kim, Sangtae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.78-86
    • /
    • 2020
  • Dozer is an expensive construction equipment and has a significant performance impact on earthwork performance. A machine guidance system has been applied to dozer equipment as a solution that can improve the performance. The system can provide earthwork-related information to equipment operators so that earthworks can be carried out with minimum support from surveyors. Construction Equipment Machine guidance has the function of supporting earthwork according to an earthwork plan by providing excavation-related information to machine operators. The objective of this study is to evaluate the performance improvement of a machine guidance system for an dozer earthwork operation, and to compare the machine guidance method with the traditional method. The performance has been evaluated in two folds: 1) productivity and 2) accuracy. The productivity shows the quantity of earthwork for a given unit time. The accuracy shows the deviation of grading level from the designed level on the construction drawing for earthwork. The machine guidance system has been applied to a testing bed in a construction site. Data comparison analysis showed that the earth earthwork had 46.59% improvement in productivity as well as 46.96% improvement in accuracy, and is expected to provide a tool for applying smart constrction to the earthwork operation.