• Title/Summary/Keyword: Quantity

Search Result 9,299, Processing Time 0.035 seconds

Simulation of Assembly System using SIMAN (SIMAN을 이용한 조립 시스템의 시뮬레이션에 대한 연구)

  • Mok, Hak-Soo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.17 no.1
    • /
    • pp.59-73
    • /
    • 1991
  • In this paper, how to evaluate the assembly system was studied. The traction machine(TRM/C) is a kind of medium sized small quantity product. This work was performed on restriction of satisfying the customer's demand by simulating on the criteria of the queuing quantity in production system, the effectiveness of assembly machine and the average time spent on assembling. The problems about assembling were grasped through the analysis of products and process. The outputs of simulations that used SIMAN on four alternatives were evaluated on the basis of the average queuing quantity, the line effectiveness, the assembly time of a product and the production capacity.

  • PDF

Estimation of the Quantity of Ground Water Recharge using the Water Balance (유역물수지 분석에 의한 지하수 함양량 추정)

  • Park, Chan-Je;Kim, Tai-Cheol
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.265-268
    • /
    • 2002
  • The ground water regime analysis method, numerical analysis method, water budget method, and baseflow analysis method have been used for estimating ground water recharged quantity. This study, adapting water budget concept of unsaturated zone, and saturated zone of the DAWAST model, proposed a new method to estimate ground water recharged quantity.

  • PDF

Economic order quantity of deteriorating items under free addition depending on the order quantity (주문량에 종속적인 덤이 제공되는 상황하에서 퇴화성제품의 경제적 주문량 결정)

  • Seong Whan Shinn;Chang Yong Song
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.25 no.1
    • /
    • pp.56-62
    • /
    • 2002
  • 본 논문은 제품 공급자로부터 일정량의 덤이 제공되는 상황에서 퇴화성 제품의 경제적 주문량 결정에 대하여 연구한다. 공급자로부터 제공되는 덤의 크기는 주문량의 크기, 즉 거래단위에 따라 차별적으로 제공된다는 가정하에 최적주문 및 재고정책 결정을 위한 해법이 제시되며 예제를 통하여 덤의 크기에 따른 재고정책의 민감도를 계량적으로 분석한다.

Optimal Ballasting in the Preliminary Ship Design Stage (초기설계 단계에서의 최적 발라스트 용량에 관한 연구)

  • Gang, Won-Su
    • 한국기계연구소 소보
    • /
    • s.15
    • /
    • pp.117-125
    • /
    • 1985
  • It is usual practice to ballast a sip to maintain requires operational safety at sea. However, excessive ballasting may reduce the operational economy of a ship. Therefore, The determination of the optimal location and quantity of ballast water is one of the important works at the preliminary design stage. To provide a convenient tool to ship designers the program for the determination of the optimal location and program the effect of the change of ballast water quantity in each tank on some characteristics of a ship, such as trim, initial stability and heel, is investigated and the minimum quantity of ballast water for each tank which satisfies the operational safety requirements is calculated.

  • PDF

Propose to Modeling standard for automation quantity take-off of BIM-based (BIM 기반 물량산출 자동화를 위한 모델링의 기준제시)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.143-144
    • /
    • 2011
  • Recently the construction project is intricately linked to the between participants. it is because construction informations are not integrate. This study suggests 3D modeling standard for integrated construction information. These suggestions can be useful to automation quantity take-off.

  • PDF

A Discount Price Schedule Based on Supplier's Profit Function

  • Kim, Kap-Hwan
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.1
    • /
    • pp.113-126
    • /
    • 1992
  • It is discussed how a supplier should design a quantity discount pricing schedule for multiple buyers. It is emphasized that nor only the supplier's surplus but also each buyer's surplus resultant from quantity discount should be considered in designing price schedule. It is shown that if the supplier's quantity pricing schedule is based on his/her profit function, each buyer's surplus may be maximized. And it is also shown that when the supplier's main benefit comes from the reduced number of setups, the incremental discount schedule satisfies the requirement. Formulas to determine values of parameters of the incremental discount schedule are provided.

  • PDF

A Study on the characteristics Torque and rpm for Varying Oil Quantity in Hydaultic Couplings (유체커플링의 작동유체량의 변화에 대한 토크와 회전수 특성에 관한연구)

  • 박용호
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.22 no.2
    • /
    • pp.241-247
    • /
    • 1998
  • The hydraulic coupling is a kind of power transmission device combined with pump turbine and casing as its main parts. The purpose of this research is to construct an experimental test set-up and to establish an available soft ware for th characteristics of two domestically developed hydraulic couplings. The test item is torgue rpm. and slip and or efficiency characteristic in accordance with variation of oil quantity. in this case the oil quantity was varied 55%, 67% and 77% of the inside capacity of hydraulic copuling.

  • PDF

Optimal Supply of Grinding Fluid for Creepfeed Grinding (고능률 연삭을 위한 연삭유제 공급의 최적화)

  • 박재현;홍순익;하만경;송지복
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1996.11a
    • /
    • pp.90-94
    • /
    • 1996
  • Thermal problems of creep-feed grinding are more serious than regular grinding. So grinding fluid supply in creep-feed grinding is very important. Grinding fluid supply quantity is not linear with effectiveness because grinding wheel is porosity material and the grinding area is solid contact area. In this paper, by using AE signal, optimal quantity of fluid supply was determined. And surface characteristics of wet creep-feed grinding were analized.

  • PDF

Improvement on the estimation of workable-quantity per unit time for boring machine (기초공사 천공기계 시간당작업량 산정 개선방안)

  • Ahn, Bang-Ryul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.138-139
    • /
    • 2015
  • Human productivity of Boring Machine for stack is provided but not its hourly workable quantity(Q-value) in the Equipment ownership cost and expenses section of the Poom-Same that is used for construction cost estimation of public sectors in Korea, which leads to less realistic and subjective estimation for the works. The optimized Q-value of the machine is proposed as a result of thorough investigation into many of its operations.

  • PDF

A Study on the Design of Economic Production Quantity Model with Partial Backorders (부분부재고를 갖는 경제적 생산량모형의 설계에 관한 연구)

  • 이강우;이꾸따세이조
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.36
    • /
    • pp.93-103
    • /
    • 1995
  • This paper des with an economic production quantity model with partial backorders for the situation in which production lead time is deterministic and demand during lead time follows a continuous distribution. In the model, an objective function is formulated In minimize an average annual inventory cost. And then the procedure of iterative solution method for the model is developed to find both production reorder point and production quantity. Finally, sensitivity analysis for various partial backorder ratios and standard deviations of demand during production lead time are presented.

  • PDF