• Title/Summary/Keyword: Quality Management Cost

Search Result 1,819, Processing Time 0.028 seconds

Periodic Preventive Maintenance Policies when Minimal Repair Costs Vary at Failures

  • Joon Keun Yum;Gi Mun Jung;Dong Ho Park
    • Journal of Korean Society for Quality Management
    • /
    • v.25 no.3
    • /
    • pp.86-95
    • /
    • 1997
  • This paper considers a repairable system, which is maintained preventively at periodic times and is minimally repaired at each failure. Most preventive maintenance policies for such repairable systems assume that the cost of minimal repair is constant regardless of its age at failure. However, it is more practical to consider the situations where the cost of minimal repair is dependent not only on its age at failue, but also on the number of preventive maintenance carried out prior to its failure. We consider the preventive maintenance carried out prior to its failure. We consider the preventive maintenance policy with age-dependent minimal repair cost. The optimal policies which minimize the expected cost rate over an infinite time span are discussed. We obtain the optimal period and number of preventive maintenance prior to replacement of the system.

  • PDF

Cost Optimizing Burn-in Time Determination (비용을 극소화하는 최적 번인시간 결정)

  • Lee, Sang-Yong;Park, Hae-Geun
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.2
    • /
    • pp.102-108
    • /
    • 1993
  • The purpose of burn-in is to eliminate the early failures of the products before they are delivered for customer use. Therefore burn-in should he continued until one is reasonally sure that all the weak items have failed, thus leaving the remaining items in a healthy state of reliability. From this point of view, burn-in time dependent costs such as a cost per product per burn-in time, and cost of repair of the product per failure occurred during burn-in time will he increased. Conversely, the cost of field repair of the product per failure occurred during the guarantee period will be decreased since the early failure of the product is fully eliminated during burn-in. Hence, this paper intend to determine optimal burn-in time which minimize the total of above costs associated with burn-in.

  • PDF

A Study on the Periodic Inspection Policy and Its Improvement (정기검사정책과 개선에 관한 연구)

  • Im, Pyoung-Soon;Suh, Yong-Sung;Park, Young-Taek
    • Journal of Korean Society for Quality Management
    • /
    • v.22 no.4
    • /
    • pp.40-58
    • /
    • 1994
  • Some systems such as early warning system should be inspected occasionally in order to detect failures. If the system is inspected too frequently, inspection cost increases. On the other hand, if the number of inspections is reduced too much, the undetected system downtime cost increases. Thus, it is of interest to find effective inspection schedule, which minimizes the sum of inspection and downtime costs. When the system has increasing failure rate, inspection intervals get shorter as time goes on. But a common practice is to inspect the system at predetermined periodic intervals. In this paper, periodic inspection policy and a modified periodic inspection policy are considered. The modified policy is easily applicable and cost-effective. Some numerical examples are included in order to explain the modified inspection ploicy and its cost performance.

  • PDF

Optimal Design of Accelerated Degradation Tests under the Constraint of Total Experimental Cost in the Case that the Degradation Characteristic Follows a Wiener Process (열화가 Wiener process를 따르는 경우의 비용을 고려한 가속열화시험 계획)

  • Lim, Heon-Sang
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.2
    • /
    • pp.117-125
    • /
    • 2012
  • For the highly reliable products, an accelerated degradation test (ADT) is a useful tool which has been employed in industry to obtain reliability-related information within an affordable amount of time and cost. In an ADT, as all other reliability tests, it is important to carefully design the ADT beforehand to obtain estimates of the quantities of interest as precisely as possible. In this paper, optimal ADTs are developed assuming that the constant-stress loading method is employed and the degradation characteristic follows a Wiener process. Under the constraint that the total cost does not exceed a pre-specified budget, the stress levels, the number of test units allocated to each stress level and the number of measurement (termination time) are determined such that the asymptotic variance of the maximum likelihood estimator of the q-th quantile of the lifetime distribution at the use condition is minimized.

A Study on the Development of Industrial Power Management System (수용가 전력관리시스템 개발 연구)

  • Moon, Young-Hwan;Seong, Ki-Chul;Yoon, Sang-Hyun;Kim, Eon-Chung
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.550-552
    • /
    • 1995
  • Real time informations from industrial power system in operation can be used for efficient energy conservation, optimal operation of electrical equipments, and expansion planning of apparatus. Requirements for energy conservation and supplied power quality in customers are increasing significantly because of their effects on the production cost and efficiency. Thus, the development of low cost power management system which can can operate in domestic power system properly is substantially requested. In this research, operation software for real time monitoring and control system in customer power system has been developed to achieve the above purposes. The development of the operating software and related technologies are expected to be applied successfully for reducing electricity cost, enhancing power quality, determining facility expansion planning, operating optimal power system, increasing production efficiency, and reducing maintenance cost.

  • PDF

On Optimal Replacement Policies for a Deteriorating System (기능저하 시스템에서의 최적 교체 정책)

  • Ji Hwan Chan
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.4
    • /
    • pp.94-105
    • /
    • 2002
  • In this paper, replacement problems for a deteriorating system are considered. In the system under consideration, the successive lifetimes after repair become shorter and shorter, while the consecutive repair times become longer and longer. More specifically, the lifetimes of the system form a nonhomogeneous Poisson process, whereas the consecutive repair times constitute a stochastically increasing geometric process. Optimal replacement policies for the long-run average cost rate and the steady state availability are considered. Also taking the cost and the availability into consideration at the same time, the properties of optimal policies under the Cost Priority Policy and the Availability Priority Policy are obtained.

(s, S) Spare Part Inventory System

  • Park, Young-Taek
    • Journal of Korean Society for Quality Management
    • /
    • v.14 no.2
    • /
    • pp.21-27
    • /
    • 1986
  • This paper deals with a continuous review (s,S) spare part inventory system. The distributions of service life of each part and the replenishment lead time are assumed to be exponential. Assuming that there is never more than a single order outstanding, we obtain the average annual cost of operating the inventory system. If the length of stockout period is small enough to be neglected compared to the length of operating period, the optimal operating policy variables minimizing the cost rate can be calculated iteratively. For the case of one-for-one ordering (that is, s=S-1), an exact cost rate, and a closed form decision rule minimizing the cost rate are obtained for a more general situation in which more than one order is allowed to be outstanding and the distribution of the replenishment lead time is general.

  • PDF

An AHP Procedure for Selecting the Best Facility under Uncertain Cost Attributes (비용추정이 불확실한 상황하에서 AHP을 이용한 최적설비 선정방법)

  • Kim, Seong-Jip;Park, Hong-Seok
    • Journal of Korean Society for Quality Management
    • /
    • v.22 no.3
    • /
    • pp.66-84
    • /
    • 1994
  • The investment to advanced manufacturing techniques is essential to reinforcement of furture competitiveness. To make a decision for selecting an appropriate manufacturing facility is very important ; it is, however, rather difficult to get a precise evaluation through conventional cost analysis methods. The supreme decision-maker does not only take into consideration tangible cost attributes in decision-making ; he also takes into account such intangible attributes as strategic ones. This study combines Analytic Hierarchy Process and Simulation in order to graph the variations of weighted indices of alternatives for effective decision making when cost attributes are uncertain. A numerical example is illustrated to explain the basic mechanics of the proposed decision procedure.

  • PDF

Cost Analysis on Warranty Policies Using Freund's Bivariate Exponential Distribution

  • Park, Minjae;Kim, Jae-Young
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.1
    • /
    • pp.1-14
    • /
    • 2014
  • Purpose: In this paper, the minimal repair-replacement warranty policy is used to carry out a warranty cost analysis with warranty servicing times and failure times that are statistically correlated to bivariate distributions. Methods: Based on the developed approach by Park and Pham (2012a), we investigate the property of the Freund's bivariate exponential distribution and obtain the number of warranty services using the field data to conduct the warranty cost analysis. Results: Maximum likelihood estimates are presented to estimate the parameters and the warranty model is investigated using a Freund's bivariate exponential distribution. A numerical example is discussed to deal with the applicability of the developed approach in the paper. Conclusion: A novel approach of analyzing the warranty cost is proposed for a product in which failure times and warranty servicing times are used simultaneously to investigate the eligibility of a warranty claim.

An Empirical Study on the Effect and Operation of QMS (중소기업의 QMS 운영과 효과에 관한 실증적 연구)

  • Lee, Deok-Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.38 no.1
    • /
    • pp.101-107
    • /
    • 2010
  • In 2008, a review was made to analyze the effect of the certification of ISO 9001 quality management system in the almost same methods used for a similar review in 2001. Based on the two reviews, this research is to compare and contrast the changes made in between. The results show that the overall satisfaction for the certification has increased over 7 years, along with other beneficial changes, such as decreased cost and increased productivity. However, there has been no significant change in the establishment of the quality management system and in the level of customer satisfaction. ISO 9001 quality management system construction appears which effects variously on the all enterprises management, therefore this is very important strategy for preparing the keen enterprises competition.