• Title/Summary/Keyword: Public project delivery system

Search Result 64, Processing Time 0.033 seconds

The Study on the Project Delivery System for Vitalizing the Green Remodeling (그린리모델링 사업 활성화를 위한 발주방식 제안)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.3-11
    • /
    • 2017
  • Aging buildings over 15 years reaches about 74% of 177 thousand buildings in Domestic public buildings. Due to the aging building, the energy loss is a serious problem. In order to reduce the energy usage through improving the energy efficiency on the existing buildings, the government & the local autonomous entity conduct the energy efficiency projects through the remodeling, repairing & equipment replacement on the existing buildings. The green remodeling is applied to the existing public buildings in recently revised the act on the creation and support of green building. However, the standard is not obvious that the work scope of green remodeling, financing and project delivery method. This paper propose is to suggest project delivery system for vitalizing the green remodeling. Green remodeling is defined on basis of the occurring work under project life cycle based on the existing building process and the financing method for owners and companies and the project delivery system according to work scope of green remodeling are proposed in this paper

A Study on Reform Case of the Citizen Service Delivery System by using IT : Focused on the Implementation of Public Utility Charges Depreciation Simplification and its Implications (정보기술을 활용한 주민서비스 전달체계 개선사례 연구 : "공공요금 감면절차 간소화" 구현 및 성공요인 중심)

  • Kim, Wan Pyong
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.3
    • /
    • pp.221-230
    • /
    • 2010
  • Citizens' demand, which has been previously focused on welfare, is now expanding to include elements for higher quality of life such as employment, housing, culture, and sports. Accordingly, the government, with an aim of effectively delivering resident services that satisfy various demands, is committed to transforming the central government-oriented service system into the integrated service system based on public-private partnership. The government is also dedicated to expanding services to 8 areas including not only welfare but also healthcare, employment, housing, education, sports, culture, and tourism, which are directly related to everyday lives of residents. This project is designed to support such reforms in the citizen service delivery system in order to enhance quality of life of local residents. This study is to draw implications from analysis for implementing the citizen service integrated information system in order to reform the citizen service delivery system effectively through examinations and analyses of citizen services provided by the central government. Especially focus on public utility charges depreciation simplification citizen service. Its implications are expected to offer a real contribution for central and local Governments that want to increase the productivity of implementing eGovernment service.

Development of Project Delivery System in Public Sector for Modular Building (모듈러 건축물의 특성을 반영한 공공발주 방식의 개발)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.49-56
    • /
    • 2016
  • Recent research has been ongoing for modular buildings in the country and interest increases. However, the activation of modular building projects is obstructed in the construction industry. There are many reasons to identity for this obstruction but one issue should be focussed. Modular buildings require to change the existing construction production system to a new construction production system, which is factory production - transportation - erection. However, the existing project delivery system in the public sector could not be adapted for this new construction production system due to the obligation of multi prime contract use, such as electrical, communication, fire fighting contracts by Law. Therefore, modular buildings in the existing project delivery system are separately contracted by multi prime contracts and modular units composed of the buildings are contracted by an architectural prime contractor as a commodity. As results, construction costs are increased, potential quality problems are raised and the existing project delivery system is finally an obstacle not to maximize benefits of the modular buildings. In this paper, we propose a new project delivery system for the modular buildings to adapt then ew construction production system.

A Study of Factors Influencing Delivery Methods Selection on Public Construction Projects (공공공사 발주방식 선정에 영향을 미치는 요인 연구)

  • Kim, Dae-gil;Lee, Ung-Kyun;Lee, Hak-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.218-219
    • /
    • 2014
  • The selection of an appropriate contract method is vital for the successful operation of the project. However, there has been a lack of studies on objective decision making support models for use in the planning stage of a project contract. The present study had the goal of analyzing the factors that influence contract method selection, as an initial study for developing a project contract method selection model. The existing related studies were analyzed, and the factors considered in the literature were selected. Then, based on the findings, the opinions of an expert group on the important factors for contract method selection were collected through a survey. The collected opinions were analyzed using factor analysis, a statistical analysis method. The results will be utilized in the future as preliminary data for developing a decision making model for selecting a contract method.

  • PDF

A Decision Support Model for Optimal Delivery of Public Construction Projects (공공건설사업의 최적 발주방식 선정을 위한 의사결정지원모델)

  • Park, Heetaek;Park, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.22-34
    • /
    • 2016
  • The Project Delivery System (PDS) is used in mixed way without clear classification from tendering system and the standard itself that can be selected is set with project budget or estimated cost only. Essentially, the PDS should consider and reflect project characteristics and types, internal and external factors for the purpose of improving the lives of citizens and their welfare. However, the current status is not operated flexibly due to the given budget, period and uniform laws and regulations. In order to solve this problem, this study suggests a Decision Support Model to select the optimal PDS for public construction projects. The current problem of the PDS for public construction projects were identified and the application of a decision support model was proposed. Subsequently a decision-making model was suggested for each PDS using the identified factors and linear discriminant function of discriminant analysis. An additional questionnaire survey and actual practical case analysis were carried out to verify the effectiveness and applicability of the model to actual work. It can be used by adjusting the decision support model and detailed factors according to the specific characteristics of public organization, ability of person in charge and project type.

The Influence Analysis of Value Engineering for the Public Empoyer's Decision Marking - Focused on the Project Life Cycle - (공공발주자 의사결정에 미치는 가치공학(VE)의 영향력 분석 - 프로젝트 생애주기를 중심으로 -)

  • Park, Jongsoon;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.12-20
    • /
    • 2015
  • The public employers are faced the mounting importance of decision process to settle the optimum VE delivery system of such public facilities buildings and etc. The elements of decision process of the public employer are formed in the various relationships of the concerned and when the projects are coming into effect, the decision process in the VE delivery method and the selection of contractor will be the name of the game. The decision process in the VE delivery method and the selection of contractor are created a case to be one and the same as well as initiates a consistency for the performance. However, the function and role of the public employer are projective accordingly to the organization of employer and the employer especially no system is equal to the capability of perfect evaluation and verification of the ability of the employer. Especially the lowest bidder policy that started with justification to increase the competitiveness and technical capability of the contractors through the completion in between contractors has been providing the hotbed for insolvency, irregularity and irrationality as a result. From this point of view it is declared that the buildup the edifice of supporting system in the process of decision to recover the mutual trust and respect of the concerned in the VE delivery system with the technostress and the systematization based on drawing the elements which affect the decision process of public employer.

Assessment of BIM-Based Government Funded Projects at the Design Phase (BIM 적용 공공 프로젝트 설계단계의 평가 방안에 관한 연구)

  • Shin, Seung-Hyup;Ham, Nam-Hyuk;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.213-216
    • /
    • 2010
  • Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.

  • PDF

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.