• 제목/요약/키워드: Public Design Project Process

검색결과 133건 처리시간 0.046초

공공프로젝트 친환경 설계지침의 변화에 따른 건축설계프로세스 연구 (Architectural Design Process by the Changes of Sustainable Design Guidelines of Public Project)

  • 태영란
    • 한국태양에너지학회 논문집
    • /
    • 제30권4호
    • /
    • pp.63-70
    • /
    • 2010
  • This study introduce a architectural design process by the changes of sustainable design guidelines in public project. First of all, this study examines existing integrated design process studies performed by Rhee & U.B.C. Also, this study examines sustainable guidelines which demanded by public building projects. Then, this study introduces sustainable design process using existing sustainable design process, and shows that how to operate and proceed integrated design to satisfy the sustainable guidelines in practice. The results of this study are as follows. (1) Since 2007, sustainable design guidelines of bidding projects have been highlighted. (2) In public buildings, energy saving is very important issue. Especially energy certification demands 1st degree(under $300kWh/m^2{\cdot}yr$). (3) Inp ractice, integrated design team performed sustainable design using the sustainable design process to improve sustainable in public buildings.

공공디자인사업 수행 프로세스 현황연구 (The Current Conditions of the Operational Process of Public Design Project)

  • 박수경;문정민
    • 한국실내디자인학회논문집
    • /
    • 제22권6호
    • /
    • pp.173-180
    • /
    • 2013
  • As a way to raise the brand value of each area and activate local industries, public design projects have been competitively made. Meanwhile, public design has the characteristics of having an uncertain number of users, people with different interests, and management of the design by an administrative organization. Such characteristics may be obstacles to the results of public design and finally can cause many problems in a project's results. However, although most local governments have executed public design projects, systematic research for them and organized execution of the projects has been insufficient. For successful realization, proper organization, and consistent public design, research on a strategic design process is needed. Therefore, this study investigated the current status of public design projects to understand problems in the design process and solve them. The results are presented as follows: First, the design process for public spaces has a dual structure including a specialized process of design development in its execution and management and the execution process in the planning state is unsatisfactory and the process of designer selection is not consistent. Second, as a result of investigating the current status of the design process for public spaces, it was deduced that as most of the projects have been subjectively and temporarily managed by wholly charged organizations without specialized consultation or investigation with different related departments, there have been diverse problems in securing design quality. Third, as a result of analysing the specific execution processes carefully, it was suggested that problems in the process can be solved by decisions through consultation and discussion. As well supportive consultation systems should be used actively.

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

프로세스 기반의 협업 프로젝트 관리 시스템 구조 설계 (Design of Architecture for Collaborative Project Management System based on Business Process)

  • 백재용;정소영;김보현;유석규;이석우;최헌종
    • 한국CDE학회논문집
    • /
    • 제14권5호
    • /
    • pp.338-345
    • /
    • 2009
  • c-PMS(collaborative project management system) is a business process(BP) based tool to manage collaborative projects which accomplish common business objectives determined by mutual agreement of companies using limited resources and time. This study analyzes collaborative BP, collaborative projects, and their relation, and proposes the architecture and operation scenario of c-PMS consisted of business process asset management(BPAM) sub-system and project manage(PM) sub-system. BPAM sub-system models private and public BP using a client/server based modeler, defines collaborative BPs process from public BPs, and manages them as companies' asset on a web portal. PM sub-system globally manages collaborative project using planning, execution, monitoring, and analyzing functions.

공공디자인사업 수행 프로세스의 구조적 특성에 관한 연구 (The Structural Characteristics of Work Processes in Public Design Projects)

  • 박수경;문정민
    • 한국실내디자인학회논문집
    • /
    • 제22권3호
    • /
    • pp.145-153
    • /
    • 2013
  • Since a government design department office was set up in 2007, active design projects have been implemented. With this opportunity, each local self-governing organization has improved its administration and institutions, and are planning intensive research on public design for efficient execution of public design projects. However, recent public design projects have caused many problems due to unspecialized design processes, a lack of cooperation with relevant organizations, and unsatisfactory management systems after projects. Therefore, to overcome such problems in the execution of public design projects, a procedure-centered model should be developed. This study aims to analyse the process structures for the strategic execution of public design projects, and the methods and content of the execution process. For this purpose, this study looked into the process structures of public design projects based on design management strategies in order to draw suggestions needed for the execution process through advanced cases. The study is summed up as follows: First, when the process of public design projects was examined in terms of management strategies and design management strategies, it included two dimensions: the management structure of general projects and the design of development projects. Secondly, through the analysis of public design cases, this study discovered useful methodologies and the main programs used and drew suggestions needed for each step in public design projects. It is expected that the results of this study will be helpful for the development of a process model appropriate for national public design projects based on the current status of the project execution and to make a contribution to systematic development in national public design.

사용자 참여디자인 방법을 이용한 학교건축물의 리모델링 시행 - 서울시 학교 화장실 개·보수 사업 시행 사례 - (User Participatory Design Process in School Building Remodelling - Case study under the 'School Restroom Environment Remodeling Project in Seoul' -)

  • 반자연;이은주
    • 교육시설 논문지
    • /
    • 제25권3호
    • /
    • pp.3-12
    • /
    • 2018
  • This study was executed by means of "user participatory design method", as a part of the public facility remodelling project supervised by the Seoul Municipality. This study aimed to complement and improve the methodology through reviewing the whole process of participatory design implementation and examining closely whether the activities, design methods and tools that have been applied at each stage were helpful to reflect the users' demands successfully. Given all of those, it implies; first, it is very meaningful that public facility remodelling project by "user participatory design" leads the ordinary users to have direct opportunity to participate in the public business and to change their perception of the restroom environment in school. Second, it is necessary to integrate the roles of the facilitator and the architect from the beginning stage of the process, which makes it feasible to reflect the users' needs to the final stage. Third, it is required to modify the design tools that enable non-professional participants to understand their tasks and to perform them effectively at the stage of decision making.

디자인경영 측면에서 본 공공디자인사업 관리프로세스에 관한 연구 (A Study on Public Design Project Management Process In Terms of Design Management)

  • 박수경;문정민
    • 한국실내디자인학회논문집
    • /
    • 제21권6호
    • /
    • pp.71-78
    • /
    • 2012
  • These days, design has been used a very useful means to achieve differentiated urban images and establish the identity of a city, and as an effort to specialize local industries through design, public design projects are competing one another. However, the projects have considerable negative effects because of diverse reasons such as unorganized procedures. For continuous and organized projects which meet demands of the interested persons of public design, reasonable design management should be introduced with a use of design as a strategic means of management Therefore, this study examined the concepts of design management and its meaning in space and analysed cases of implementing components for management of public design projects. It searched for the factors of design management indicating design-oriented management and presented a strategy model which complements design-oriented management. The results of the study are presented as follows: First, strategic implementing components needed for a space design management process were obtained. A design recognition process aimed at what space aims at and needed to identify active components such as physical and indigenous environment. A design inquiry process included problem solution considering characteristics of multi-dimensional space active components, design development considering behavioral functions of humans, checklists needed to complete design and necessary components to institutionalize design. For definition of project space, guideline projects of public design should be progressed in the same context as urban design, and developmental directions of public design needed design inquiry in terms of space to create various experiences in space.

  • PDF

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

서비스 디자인 방법론을 활용한 지역 활성화 전략 연구 - 청양군 간판개선사업 중앙로 일대를 중심으로 (A Study on the Development of Public Design Strategy Based on the Service Design Methodology -Focus on Signboard renovation Business Jungangro, Chung-yang)

  • 정용진;김소연
    • 한국콘텐츠학회논문지
    • /
    • 제22권3호
    • /
    • pp.380-389
    • /
    • 2022
  • 서비스 디자인이란 사용자의 서비스 경험을 디자인하는 활동 및 이를 전문적으로 실행하는 디자인 영역을 의미한다. 과거 공급자 위주의 정책 결정에서 벗어나 국민 관점의 서비스를 설계하기 위해 최근 서비스디자인 방법론을 활용한 국민 참여 사업 모델이 늘어나고 있다. 특히 행정안전부는 정책 과정 전반에서 국민 관점의 서비스를 설계하기 위해 2014년에 '국민디자인단'을 구성하였다. 정책 수요자인 국민, 서비스디자이너와 공급자인 공무원이 정책과정 전반에 함께 참여하여 서비스디자인 기법을 통해 공공서비스를 개발, 발전시키는 국민참여형 정책모형을 운영하고 있다. 본 연구는 서비스디자인 방법론을 활용한 지역 활성화 전략 수립을 목표로, 국민디자인단 간판개선사업으로 진행된 사례를 통해 실질적인 사업대상지의 발전적 방향성을 제시하였다는 것에 의의가 있다. 단, 본 연구는 현재 진행되고 있는 사업에 관한 내용으로 향후 사업대상지 적용에 대한 검증 및 사용자 만족도 평가 등이 이루어지지 않은 만큼, 향후 사업이 종료되면 수요자를 대상으로 사업 만족도를 파악할 필요가 있다.

공공 발주자 역량 향상을 위한 설계관리 지침서 및 절차서 개발 (Development of the Design Management Guidelines to Enhance the Capability of Public Clients)

  • 신규철;박형근;이영호;곽준환
    • 한국건설관리학회논문집
    • /
    • 제12권2호
    • /
    • pp.143-151
    • /
    • 2011
  • 국내 발주기관에서는 발주자 중심의 설계관리 절차서의 부재로 인하여 체계적이고 효율적인 설계관리가 이루어지지 못하 고 있다. 본 연구의 목적은 공공 건설사업의 설계관리 업무를 위하여 공공 발주자가 각 사업수행 단계에 필요로 하는 설계관리 업무 지침서 및 절차서를 개발하는 것이다. 연구의 방법으로 국내외 발주기관별 설계관리업무 현황을 분석하였고 문제점 및 개선방안을 도출하여 이를 바탕으로 설계관리업무를 설계관리 지침서 및 표준 절차서를 개발하여 전문가의 검증을 받는 것으로 하였다. 본 연구의 결과로 개발된 '공공발주자 역량향상을 위한 설계관리 지침 및 표준절차서'는 설계단계에 따라서 설계관리업무의 구체적인 사항을 기술하였다. 이러한 설계관리 절차서는 업무 단계별로 구분하여 개발됨으로써 각 단계에서 발생하는 각종 검토사항을 효율적으로 관리하도록 활용될 수 있다. 또한 지침서 및 절차서를 통하여 설계용역관리 중 발주 자가 수행해야 할 업무를 명확히 규정함으로써 발주자와 설계 용역업체 사이의 업무 혼란을 최소화하고, 일관성 있는 업무수행이 가능하도록 활용될 수 있다.