A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects (공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin;Kim, Tae-Hak;Ju, Ki-Bum
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

A Platform Design Study of Intelligent Program Management Information System (iPMIS) (지능형 종합사업관리 시스템 플랫폼 디자인 방안에 관한 연구)

  • Yeom, Ji-Woong;Kim, Ju-Hyung;Ahn, Byung-Ju;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.716-719
    • /
    • 2008
  • Yongsan International business Center, Incheon Songdo City, Roppongihill sand Midtown, including the most of latest internal and external construction projects become larger and more complicated than before. Mega project is one of most complicated project type as public and private sectors involve and the space will be construed in all directions i.e. horizontal, vertical, underground and ground. Therefore mega projects need a new program management information system to start the project's success. So this paper proposes a platform design study to intelligent program management information systems to mange mega projects.

  • PDF

Improvement of Design Performance for the Minimization of Public Grievances Based on a Construction Public Grievance Breakdown Structure (건설공사 민원 최소화를 위한 민원분류체계 기반 설계성능향상)

  • Moon, Sungwoo;Jo, Hwani
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.12-20
    • /
    • 2018
  • Construction projects are often large in magnitude and high in construction amount. Therefore, construction activities have great impacts on business economics and social lives in the surrounding regional area. The residents can have public grievances if they are badly affected by the construction activities. Project owners should try to minimize adverse impacts in planning and design as well as in construction. The objective of this paper is to establish a public grievance breakdown structure and apply this breakdown structure to improving design functions in an effort to minimize public grievances. This research has been done in three steps of 1) analyzing the characteristics of public grievances in construction projects; 2) developing a public grievance breakdown structure; and 3) based on the public grievance breakdown structure, generating design alternatives that can improve the preparedness against public grievances. A case study has been done to demonstrate the applicability of the public grievance breakdown structure in generating design alternatives to minimize public grievances.

Exploring Long-Term Performance in Design-Build Best-Value Evaluation Criteria

  • Calahorra-Jimenez, Maria;Poore, Tanner
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.74-82
    • /
    • 2022
  • Improving long-term performance in highway projects is an imperative goal for public administrations. Project delivery and procurement methods might provide an opportunity to align design and construction processes with this goal. Previous studies have explored whether project delivery methods impact the long-term performance of highway projects. However, these studies did not focus specifically on how core elements within the procurement might relate to long-term performance. Thus, this research aims to fill this gap by exploring to what extent and how long-term evaluation criteria are considered in design-build best-value procurement of highway projects. To this end, content analysis was conducted on 100 projects procured between 2009 and 2019 by 19 DOTs across the U.S. The analysis of 365 evaluation criteria found that (1) roughly 11% of them related to long-term performance. (2) The weight given to these criteria in the overall technical proposal was lower than 30%. (3) Sixty-five percent (65%) of long-term evaluation criteria focused on design while 15% related to materials and technology, respectively. The results of this study are a first steppingstone to initiate a deep exploration of the relationship between procurement practices and actual project performance. Currently, with sustainability and life cycle assessments being top concerns in infrastructure projects, this line of research might be of particular interest to DOTs and highway agencies across the U.S. and worldwide.

  • PDF

Development of Construction Project Management System Applicable to Earth-Work Field (토공 현장관리 중심의 시공관리시스템 개발에 관한 연구)

  • Kwon, Oh-Yong;Jo, Jae-Ik;Kim, Do-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.301-304
    • /
    • 2008
  • The purpose of this study is to embody the integrated working management system for public works, focused on the management of surplus soil at a field of public works. The contents and results of this study can be classified into the design of working management DB for public works and the embodiment of working management DB. First, the design of working management DB for public works consists of three DBs - process management to analyze work plan and performance. for backhoe loader, working management and resources management for equipment and labor management - in connection with work and resources classification system. Secondly, the working management system for public works can describe work plan and performance on a floor plan using graphic. Based on this, the status of process and progress report with visual expression had been developed to facilitate the communications and performance of duties among staff in charge at the field of public works. This study is a specialized system for a company specializing in public works and a system that can be put into practical use if practicality is proved through test-bed with regard to business.

  • PDF

A Feasibility Study of the Construction Project in Pre-Design Phase (건설 프로젝트의 사업타당성 분석에 관한 연구)

  • 노병옥;이상범;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.109-113
    • /
    • 2002
  • Urban public service is goods and activities which satisfy public demands for the political, social, economic, cultural activity and household affairs of individual or groups and which urban government supply with free of charge. In view of government, in addition to fairness of facilities location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. Therefore, it is necessary to study on feasibility. A feasibility study Is an effective tool in determining the decision of investment or not and the level of investment priority on Projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected four and two by consideration of facilities distribution and connection with others. Six proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. The finally, it is to study on economical efficiency. Net Present Value was came out ₩4.4billion by 20years and Inter Rate of Return showed up 11%. in addition, it offer various benefit by public facilities. In conclusion, this project is reasonable.

  • PDF

A Study on Improvement of the Assessment Criteria for New and Renewable Energy Facilities in the G-SEED (G-SEED의 신·재생에너지시설 평가기준 개선 연구)

  • Kim, Wan-Young;Tae, Choon-Seob;Shin, U-Cheol;Yu, Chang-Kyun
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.6
    • /
    • pp.43-50
    • /
    • 2015
  • The G-SEED encourages the installation of new and renewable energy facilities through assessments of the new and renewable energy installation rates. The government also regulates the installation rate of new and renewable energy facilities in the 'Project on new and renewable energy obligation in public installations'. The current criteria concerning the new and renewable energy facilities in the G-SEED are the result of an amendment made in July 2010. As over five years have passed since this amendment, the assessment criteria needs to be reenforced. To improve the current criteria, the calculation results of the installation rate of new and renewable energy facilities in the G-SEED were analyzed and compared to the corresponding calculation results of the 'Project on new and renewable energy obligation in public installations'. And an improved draft for the assessment criteria of the new and renewable energy facilities in the G-SEED was proposed.

A Study on the Invigoration of BIM Design of Public Institutions : Focused on the Case of LH (공공기관의 BIM 설계 활성화 방안 연구: LH 사례를 중심으로)

  • Yang, Dong-Suk;Lee, Ji-Eun
    • Land and Housing Review
    • /
    • v.7 no.4
    • /
    • pp.291-297
    • /
    • 2016
  • Recently, foreign construction companies through the BIM-design have the effect of improving productivity and quality construction. On the other hand, domestic BIM-design is a little depressed because of lack of additional costs and professional personnel problem. The construction industry of recession, as reasons of construction market is downsizing. First must, enabling the design in public institutions, mainly BIM.. Design for BIM the construction sector, as well as an early stage actively introducing and spreading of the performance of him and domestic BIM technology should be able to promote the development. Public institutions in accordance with this study presented measures that can stimulate the BIM design on LH. To that end, the public agency's design were analyzed, and suggested the Improvement and Application of the four aspects for Modular Coordination BIM Design. Also, gradually formulate a "road map for public institutions applied design bim" in order to carry out the plans put forward and presented the expected effect of him. The proposed work was public institutions will be used as a pilot project in Korea Land Housing Corporation.

Research on job competency reinforcement through online social innovation project in the public sector (공공분야 온라인 사회혁신 프로젝트를 통한 직무역량 강화 연구)

  • Park, Jeongsun;Park, Sanghyeok;Park, Eunhye;Lee, Myunggwan
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.18 no.2
    • /
    • pp.77-91
    • /
    • 2022
  • Social innovation refers to activities that solve social problems by developing new ideas in cooperation with actors close to the field for the purpose of preserving the sustainability of society. In the field of social innovation, voices calling for a bottom-up method that starts with citizen participation are growing, and the need to improve public officials' awareness of social innovation and strengthen professionalism is being raised. In the era of Covid 19 and the 4th industrial revolution, digital literacy is being emphasized to us. In the field of social innovation, the need to strengthen social activities using digital media is growing. In this paper, an example of online social innovation project education based on the design thinking methodology was presented for public officials in Busan to improve their awareness of social innovation and secure expertise, and the effect of job competency reinforcement was statistically verified. As a result of statistical analysis, the average difference between the 'online communication' factor and the 'online empathy' factor was the largest, and it can be interpreted that digital literacy for social innovation has been strengthened.

Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.